My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
26 Civic Center Plz - REV 6 - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Civic Center Plz
>
26 Civic Center Plz
>
26 Civic Center Plz - REV 6 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 1:27:25 PM
Creation date
2/25/2026 1:26:58 PM
Metadata
Fields
Template:
Plan
Permit Number
20181364
20184057
30146548
40138556
40139543
101117272
101117273
101117274
101117275
101117276
101117286
101120941
101121751
Full Address
26 Civic Center Plz
Street Number
26
Street Name
Civic Center
Street Suffix
Plz
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ECS Pacific, Inc. <br />Project No. 81:1145 <br /> <br />City of Santa Ana Public Library Renovation <br />26 Civic Center Plaza <br />Santa Ana, California 92701 <br /> <br />COLD FLUID-APPLIED WATERPROOFING <br /> <br />07 1416 - 9 <br /> <br /> <br />3.4 PREPARATION OF CONCRETE <br />A. Prepare surface in accordance with manufacturer’s instructions. <br />B. Provide clean, dry, and structurally sound concrete surface. <br />C. Existing Concrete: Remove existing coating. <br />D. Condition Survey: Perform a condition survey of existing concrete in accordance with <br />ACI 201.1R. <br />E. Abrasive Blasting, mechanical methods: <br />1. Prepare concrete, concrete block surfaces to receive fluid-applied waterproofing <br />by abrasive blasting, or mechanical methods. <br />2. Remove dirt, soil, grease, oil, paint, coatings, form release agents, curing <br />compounds, laitance, loose material, unsound concrete, and other foreign <br />materials that would inhibit performance of fluid-applied waterproofing in <br />accordance with ASTM D4258 and by abrasive blasting. <br />3. Obtain a firm, sound concrete surface in which bug holes are fully opened or <br />repaired. <br />4. Remove sharp concrete edges and projections. <br />5. Perform abrasive blasting in accordance with ASTM D4259-88. <br />6. Receive approval by Architect of blasting media. <br />7. Maintain air supply for abrasive blasting free of oil and water in accordance with <br />ASTM D4285. <br />8. Expose aggregate to obtain a profile of ICRI CSP 4 to 6 in accordance with ICRI <br />03732. <br />F. Repair concrete surface to be free of holes. Fully open bug holes before repair. <br />Repair defects in the concrete surface, such as bug holes, air pockets, and honeycomb <br />by filling and smoothing off with patching material, epoxy patching compound, or grout. <br />Abrasive blast repaired surfaces. <br />G. Ensure substrate is clean and dry in accordance with manufacturer’s instructions. <br />Remove surface laitance from concrete surface to expose aggregate to obtain a profile <br />of ICRI CSP 4 to 6 in accordance with ICRI 03732. <br />H. Repair cracks in concrete surface with material suitable for type and width of crack, <br />compatible with substrate and fluid-applied waterproofing, and approved by the <br />Architect or Engineer. <br />I. Moisture Tests: Do not apply primer or fluid-applied waterproofing to concrete surface <br />unless two or more of the flowing moisture tests confirm appropriate moisture levels for <br />properly prepared substrates: <br />1. Plastic Sheet Method (ASTM D4263): Pass/Fail. <br />2. Relative Humidity Test: Less than 75% relative humidity at 70° F. <br />3. Calcium Chloride Test: Less than 5 pounds per 1,000 square feet per 24 hours. <br />4. Radio Frequency Test: Less than 5% moisture. <br />3.5 PREPARATION AT TERMINATIONS, PENETRATIONS, AND CORNERS <br />A. Prepare surfaces at terminations and penetrations through waterproofing and at <br />corners and penetrations in accordance with waterproofing manufacturer's written
The URL can be used to link to this page
Your browser does not support the video tag.