DIVISION 1 <br />GENERAL REQUIREMENTS <br />1. ALL WORK SHALL BE WARRANTED FOR 1 YEAR AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP. <br />2. ALL WORK PERFORMED SHALL BE COMPLETED IN ACCORDANCE WITH ALL STATE, FEDERAL, AND LOCAL CODES, ORDINANCES, AND <br />LAWS, INCLUDING THE 2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R.: 2022 CALIFORNIA BUILDING CODE <br />(CBC), PART 2, TITLE 24 C.C.R.: 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R: 2022 CALIFORNIA MECHANICAL <br />CODE (CMC), PART 4, TITLE 24 C.C.R: AND 2022 CALIFORNIA PLUMBING CODE (CPC), PART 5, TITLE 24 C.C.R <br />3. CONTRACTORS SHALL COORDINATE THEIR WORK WITH UTILITIES COMPANIES AND OTHER TRADES. ANY CONFLICTS SHALL BE <br />BROUGHT TO THE ARCHITECT'S ATTENTION PRIOR TO THE WORK BEING INSTALLED. FAILURE TO DO SO WILL MAKE THE CONTRACTOR <br />RESPONSIBLE FOR THE COST TO CORRECT THE WORK. <br />4. EACH CONTRACTOR SHOULD VISIT THE SITE OF THE PROPOSED WORK, VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS, <br />INCLUDING EASEMENTS, NOTIFY THE ARCHITECT OF ANY DISCREPANCIES, AND FULLY ACQUAINT THEMSELF WITH THE SITE CONDITIONS <br />RELATING TO CONSTRUCTION. <br />5. EACH CONTRACTOR WILL BE REQUIRED TO PROVIDE CERTIFICATES OF INSURANCE ISSUED BY AN ACCEPTABLE COMPANY PRIOR TO <br />COMMENCEMENT OF WORK ON THE SITE. <br />6. MAINTAIN AREAS FREE OF WASTE MATERIALS, DEBRIS, AND RUBBISH. MAINTAIN SITE IN A CLEAN AND ORDERLY CONDITION. THE <br />CONTRACTOR SHALL DISPOSE OF ALL DEMOLITION AND CONSTRUCTION DEBRIS OFF SITE AND IN AN APPROVED MANNER, <br />ACCORDING TO STATE AND CITY CODES. NOTIFY ARCHITECT AT ONCE IF ANY HAZARDOUS MATERIALS ARE ENCOUNTERED. <br />7. COMPLETE FINAL CLEANING PRIOR TO WALK-THROUGH AND PREPARATION OF PUNCH LIST. CLEAN ALL SURFACES EXPOSED TO VIEW. <br />REMOVE WASTE AND SURPLUS MATERIALS, RUBBISH, AND CONSTRUCTION FACILITIES FROM SITE. <br />8. ALL EXIT DOORS SHALL BE OPENABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. NO <br />DEADBOLTS, SLIDING BOLTS, ETC. PROVIDE SELF RELEASING LOCKING DEVICES ON EXIT DOORS. <br />9. ALL PRIMARY ENTRANCES AND ALL FACILITIES IN THE BUILDING SHALL BE MADE ACCESSIBLE TO THE HANDICAPPED PER CBC CHAPTER <br />11B. <br />10. CONTRACTOR TO SECURE PERMIT AS REQUIRED BY THE CITY FIRE MARSHALL, PRIOR TO OCCUPYING THIS SPACE. <br />11. POST OCCUPANT LOAD SIGNS COMPLYING WITH CFC 1003 AND CBC 1004.3 AS REQUIRED. <br />12. FINISH CONTRACTORS SHALL ENSURE ALL FINISH MATERIALS WILL BE FLUSH AND WASHABLE. INTERIOR FINISH MUST CONFORM TO THE <br />REQUIREMENTS OF CBC. <br />13. FIRE EXTINGUISHERS TO BE PROVIDED, PER CFC 906 & TABLE 906.3(1). TO BE TYPE 2A10BC WITH CURRENT FIRE MARSHALL SERVICE <br />TAG, MOUNTED IN VISIBLE LOCATION, NOT MORE THAN 75 FT. FROM ANY POINT IN THE SPACE, AS INDICATED ON DWG.S. PROVIDE <br />SEMI RECESSED CABINET INSTALLATION: J.L. INDUSTRIES STOCK CABINET <br />W/ FIRE EXTINGUISHER - ABC #5. <br />14. ALL ELECTRICAL INSTALLATIONS, MAINS SERVICE AND PANEL BOARDS SHALL BE PER U.E.C.17. PROVIDE FIRE DAMPERS IN ALL DUCTS <br />PENETRATING FIRE RATED WALLS AND CEILINGS. SEE MECHANICAL SERIES DRAWINGS. <br />15. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART OF THE WORK TO BE DONE, DETAILS SHOULD BE SAME <br />AS FOR OTHER SIMILAR WORK. <br />16. APPROVED HARDWIRED SMOKE DETECTORS ARE TO BE INSTALLED IN ALL OFFICES, STORAGE ROOMS AND HALLWAYS, PER CODE. <br />17. SITE SECURITY: PROJECT SITE SHALL BE SECURED AND MONITORED AT ALL TIMES. PROVIDE. TEMPORARY PORTABLE CHAIN-LINK <br />FENCING AS REQUIRED; MINIMUM 6 FEET HIGH. <br />18. PROVIDE AND PAY FOR ALL TEMPORARY UTILITIES, INCLUDING POWER, TELEPHONE, WATER AND TOILETS, AS REQUIRED. <br />GENERAL CONSTRUCTION <br />17. ALL STEEL FABRICATIONS TO BE PRIMED WITH BEST QUALITY RUST PROOFING PRIMER. <br />18. ALL POWER ACTUATED PINS/ANCHORS SHALL BE "RAMSET" #2330 AT 32" O.C. FOR INTERIOR, NON-LOAD BEARING PARTITIONS PER <br />ICC #ESR-1799. <br />19. ALL METAL FASTENERS SHALL BE MIN. HOT DIPPED GALVANIZED AFTER THEIR FABRICATION. ALL NAILS, SCREWS AND BOLTS TO BE <br />CORROSION RESISTANT. <br />20. ALL SUBSTRATES TO BE PAINTED OR OTHERWISE FINISHED, SHALL BE THOROUGHLY PREPARED AND CLEANED, AND SHALL BE <br />COMPATIBLE WITH PAINTS SELECTED. <br />21. DRYWALL CONTRACTOR SHALL PROVIDE ALL REQUIRED ACCESS PANELS WHERE NECESSARY TO PROVIDE ACCESS TO FIRE <br />DAMPERS, ELECTRICAL DISCONNECTS, PUMPS, VALVES, ETC. THE PAINTING CONTRACTOR WILL BE RESPONSIBLE TO PAINT ALL ACCESS <br />DOORS TO MATCH ADJACENT SURFACE. <br />22. INSTALL SUPPLEMENTARY FRAMING, BLOCKING, AND BRACING AT TERMINATIONS IN GYPSUM BOARD ASSEMBLIES TO SUPPORT <br />CABINETRY, FIXTURES, EQUIPMENT SERVICES <br />DIVISION 2 <br />DIVISION 3 <br />CONCRETE FLOOR REPAIRS <br />1. CONTRACTOR SHALL DETERMINE LOCATION OF EXISTING UTILITY LINES BELOW EXISTING FLOOR SLAB AND CONDUCT CORING FOR <br />CONNECTION OF NEW UTILITIES. WORK SHALL BE CARRIED OUT TO MINIMIZE DISTURBANCE TO EXISTING FLOOR SLAB. COORDINATE WITH <br />BEAM / REINFORCEMENT LOCATIONS. COORDINATE ALL SUCH WORK WITH PLUMBING AND ELECTRICAL SUBCONTRACTORS, AND FILL <br />GAPS AROUND PIPEWORK WITH FIRE RATED CAULKING / SAFING MATERIAL TO MAINTAIN 2-HOUR FIRE RATING AT CONCRETE SLAB. <br />PROVIDE CEMENTITIOUS FLOAT / FILL TO ENSURE NEW / EXISTING FLOORING SURFACE IS SMOOTH AND LEVEL AND APPLY MOISTURE <br />SEALANT AT ALL AREAS WHERE MOISTURE PRESSURE EXCEEDS FLOORING MANUFACTURER INSTALLATION RECOMMENDATIONS, AS <br />REQUIRED. <br />2. PENETRATION THRU RATED WALLS SHALL BE SEALED WITH A MATERIAL CAPABLE OF PREVENTING THE PASSAGE OF FLAMES AND HOT <br />GASES WHEN SUBJECTED TO THE REQUIREMENTS OF THE TEST STANDARD SPECIFIC OF FIRE STOPS ASTM-E-814 (U.L. SYSTEM #WL1001 FOR <br />WALLS & #CAJ1001 FOR FLOORS). <br />DIVISION 6 <br />INTERIOR CABINETRY <br />1.INSTALL ALL ITEMIZED PREFABRICATED CABINETRY AS NOTED ON PLANS, PER MANUFACTURER'S DIRECTIONS AND MAKE ALL UTILITY <br />CONNECTIONS AS REQUIRED. <br />2.CABINET SUBCONTRACTOR TO VERIFY ALL CABINET WIDTH DIMENSIONS PRIOR TO FABRICATION. COMPLY WITH AWI STANDARDS <br />FOR CUSTOM GRADE AND PREMIUM GRADE FOR PLASTIC LAMINATE. SUBMIT SHOP DRAWINGS IN CONJUNCTION WITH OTHER <br />SUBMITTALS COVERING FABRICATION, INSTALLATION AND FINISH FOR CONFORMANCE W/ DESIGN INTENT, ETC. <br />3.CUSTOM CABINET INTERIORS TO BE CONSTRUCTED OF WHITE MELAMINE SURFACED HIGH DENSITY <br />PARTICLEBOARD, PER ANSI 208.1 GRADE M-2, EXCEPT AT AREAS BELOW SINKS, WHICH SHALL BE SURFACED WITH WHITE HIGH DENSITY <br />PLASTIC LAMINATE OVER 3/4" PLYWOOD. ALL EXPOSED INTERIOR EDGES TO BE COVERED WITH MELAMINE UNLESS NOTED OTHERWISE. <br />ALL CABINET BASES TO BE PLASTIC LAMINATE. <br />4.CABINET DRAWER GLIDES TO BE 100LB FULL EXTENSION GLIDES - GRANT GR 329 (OR EQUAL) GLIDE LENGTH TO BE AS REQUIRED <br />BY CABINET DEPTH (2"-4" SHORTER THAN OVERALL DEPTH OF CABINET.) CABINET STANDARDS TO BE KV FLUSH SHELF STANDARDS: <br />KV255WH72 (STEEL WHITE EPOXY COAT) WITH KV CLIPS KV256WH (STEEL WHITE EPOXY COAT), OR APPROVED EQUAL SYSTEM. <br />5. CABINET DOOR HINGES TO BE BLUM MODUL FULL OVERLAY 110O FULLY CONCEALED HINGE. REFER TO MANUF. SPECIFICATIONS <br />FOR NUMBER PER DOOR AND MOUNTING STYLE APPLICATION REQUIRED. LOCKS WHERE REQUIRED, TO BE BEST LOCKS 5L SERIES <br />LATCHBOLT 3/4" UTILITY CYLINDERS, SATIN CHROME FINISH. SUPPLY TWO KEYS PER LOCK. INTERIOR SURFACE HEAD AND FOOT BOLTS <br />TO BE 4" IVES IV40-4BR. EXCEPT WHERE PUSH-CATCHES ARE REQUIRED, DOOR AND DRAWER PULLS TO BE STANDARD 4" WIRE PULLS; <br />BRUSHED ALUMINUM FINISH. VERIFY W/ OWNER PRIOR TO INSTALLATION. <br />6. CUSTOM CABINET BODIES, DOORS, DRAWER FRONTS AND SIDE PANELS TO BE HIGH PRESSURE PLASTIC LAMINATE OVER 3/4" HIGH <br />DENSITY FIBERBOARD PER ANSI 208.2, EXCEPT AT ALL TOPS AND WET AREAS (SINK LOCATIONS, ETC.) WHERE 3/4 PLYWOOD SHALL BE <br />USED. PROVIDE PLASTIC LAMINATE TOPS AS NOTED ON CABINET ELEVATIONS. TOPS AND EDGING TO BE CHEMICAL-RESISTANT <br />PLASTIC LAMINATE MIN. .050" THK. PER NEMA LD-3. VERTICAL SURFACES MAY EMPLOY .028" THK. LAMINATE. GROMMETS TO BE <br />HAFELE - HA429.93.322 (OR EQ.) BLACK ROUND PLASTIC GROMMETS.(LOUIS & CO. (214) 647-8811). FINAL LOCATION OF <br />GROMMETS TO BE APPROVED BY OWNER PRIOR TO INSTALLATION <br />7. ALL STORAGE SHELVING TO BE 6 TIER X 12" WIDE (OR AS NOTED), CONSTRUCTED OF WHITE MELAMINE SURFACED HIGH DENSITY <br />FIBERBOARD. COVER EXPOSED EDGES WITH MELAMINE UNLESS NOTED OTHERWISE. INSTALL ON STANDARD METAL KNIFE-EDGE <br />BRACKETS SET ON VERTICAL STANDARDS @ MIN. 24" ON CENTER. <br />8. REFER TO FINISH SCHEDULE ON THIS SHEET FOR ALL LAMINATE AND COUNTERTOP FINISH SELECTIONS, ETC. <br />DIVISION 7 <br />INSULATION AND SEALANTS <br />1. PROVIDE INSULATION WITH FIRE PERFORMANCE PER TEST METHODS ASTM E 84, ASTM E 119 AND ASTM E 136. <br />2. FOR ALL INTERIOR WALLS FULL HT. TYPE I (BLANKETS WITHOUT MEMBRANE FACING), AS USG <br />"THERMAFIBER" OR EQUAL HAVING BEST SOUND DEADENING PROPERTIES (MIN. R-11). <br />3. INTERIOR PLUMBING FIXTURES; 1- PART SANITARY, MILDEW RESISTANT, AS DOW CORNING 786 OR EQ. <br />4. R-11 FOR MISSING WALL INSULATION. INSULATION TO COMPLY WITH ASTM C 665 FOR TYPE III, CLASS A : BLANKETS WITH KRAFT <br />MEMBRANE FACING. SET FACED UNITS WITH KRAFT TOWARDS OUTSIDE. <br />5. SEALANT FOR THRESHOLDS; SINGLE COMPONENT POLYSULPHIDE, BY PECORA, DAP, OR EQUAL. <br />6. INTERIOR PAINTED AREAS; ACRYLIC LATEX CAULK BY TREMCO, OR EQUAL. <br />7. INTERIOR CABINETRY AND VINYL WALL COVERING;1-PART SILICONE AS DOW CORNING 795 OR EQ. <br />8. INTERIOR PLUMBING FIXTURES;1- PART SANITARY, MILDEW RESISTANT, AS DOW CORNING 786 OR EQ. <br />ROOFING REPAIRS <br />9. MAKE ALL REQUIRED REPAIRS AT NEW PENETRATIONS, EQUIPMENT-MOUNTINGS, ETC. OR ESTABLISHED LEAKS OR DETERIORATED <br />AREAS, USING 4-PLY CLASS A / I-60 BUILT-UP ASPHALT/ PLY SYSTEM WITH WHITE (GRANULAR) CAP SHEET TO MATCH EXISTING SYSTEM. <br />FIELD VERIFY AND REPORT TO ARCHITECT ON ALL PRE-EXISTING NEGATIVE ROOFING CONDITIONS: ACCOUNT FOR THIS WORK AS A <br />PART OF YOUR BID. CONTRACTOR MAY SLIT MEMBRANES IF PROPER PATCHES ARE PROVIDED. DURING ROOFING REPAIR <br />OPERATIONS PROVIDE PROTECTIONS TO ENSURE AGAINST BITUMEN SPILLS ON SIDING OR PAVING BELOW. CLEAN UP ANY SPILLS OR <br />SPATTERS IMMEDIATELY. <br />10. EXTEND ALL NEW VENT PIPES TO 12" ABOVE SHEATHING. ADD METAL FLASHING COLLARS TO ALL NEW PIPES AFTER COMPLETION <br />OF BUILT UP ROOFING REPAIRS. <br />11. PROVIDE 22 GAGE GALVANIZED SHEET METAL FLASHINGS, WITH PAINT FINISH AT ROOF EDGES, ETC. <br />DIVISION 8 <br />INTERIOR WINDOWS / VISION PANELS <br />1. SUBMIT SHOP DRAWINGS IN CONJUNCTION WITH OTHER SUBMITTALS COVERING FABRICATION, INSTALLATION AND FINISH FOR <br />CONFORMANCE W/ DESIGN INTENT, ETC. VERIFY QUANTITIES AND SIZES PRIOR TO ORDERING. <br />2. INTERIOR WINDOWS SHALL BE SINGLE GLAZED WITH 1/4" THICK, CLEAR TEMPERED PANES WITH TINTS, FILMS, ETC. OR OTHER SPECIAL <br />GLAZING PRODUCTS AS SPECIFIED AND NOTED ON THE PLANS. NON-RATED GLAZING SHALL BE SET IN HIDDEN C-CHANNEL <br />ALUMINUM FRAMES AND STOPS. <br />INTERIOR DOORS <br />4. CONTRACTOR TO COORDINATE AND REVIEW DOOR SUBMITTALS (INCL. HARDWARE SCHEDULES) FOR CONFORMANCE WITH <br />DESIGN INTENT, ETC. VERIFY QUANTITIES/ SIZES PRIOR TO ORDERING. <br />5a. INTERIOR DOORS TO BE 'WESTERN INTEGRATED' FLUSH SLAB SOLID CORE, WOOD DOORS, WITH FINISH AS DIRECTED IN THE FINISH <br />SCHEDULE. INTERIOR FRAMES SHALL BE EITHER 'WESTERN INTEGRATED' KNOCK-DOWN METAL FRAME, COLOR: BLACK ANNOD. <br />INCLUDING CLEAR ALUM SNAP-ON TRIM OR EZYCONCEPTS EZYJAMB FLUSH METAL FRAME SYSTEM W/ MUD EDGE. NO TRIM. <br />5b. INTERIOR VISION PANELS IN DOORS TO BE GLAZED W/ 1/4" THICK, CLEAR TEMPERED GLASS (OR LEADED) PER SCHEDULE. ALL <br />FRAMES AND STOPS TO BE PAINTED STEEL. <br />6. WINDOWS AND ENTRY / EXIT DOORS TO REMAIN WHERE EXISTING. ANY REPLACEMENTS SHALL MATCH EXISTING: PROVIDE <br />BUILDING STANDARD DOORS, PRE-FINISHED CLEAR, OR COLOR AS DIRECTED BY LANDLORD. ENTRY DOOR FRAMES SHALL BE PROFILE, <br />STYLE AND FINISH AS DIRECTED BY LANDLORD. <br />7. MOUNT HARDWARE UNITS AT HEIGHTS INDICATED IN FOLLOWING APPLICABLE PUBLICATIONS, EXCEPT AS SPECIFICALLY INDICATED <br />OR REQUIRED TO COMPLY WITH CBC GUIDELINES AND CBC 1008.1.8 AND HANDICAP ACCESSIBILITY REGULATIONS <br /> 1. "RECOMMENDED LOCATIONS FOR BUILDERS HARDWARE FOR STANDARD STEEL DOORS AND FRAMES" BY THE DOOR AND <br />HARDWARE INSTITUTE. <br />8. WHERE CLOSERS ARE INDICATED FOR DOORS REQUIRED TO BE ACCESSIBLE TO THE PHYSICALLY HANDICAPPED, PROVIDE <br />ADJUSTABLE UNITS COMPLYING WITH ANSI A117.1 PROVISIONS FOR DOOR OPENING FORCE AND DELAYED ACTION CLOSING. FINISH <br />TO MATCH SPRAYED LAQUER US26D. ADJUST UNITS TO COMPLY WITH CBC PROVISIONS FOR DOOR OPENING FORCE AND DELAYED <br />ACTION CLOSING. <br />9. PROVIDE CBC APPROVED ALUM. / VINYL TRANSITION STRIPS AT DOORWAYS BETWEEN FLOORING OF <br />DIFFERENT TYPES. SEE ARCHITECT'S DETAIL. <br />10. AS REQUIRED BY MECHANICAL ENGINEER, UNDERCUT RESTROOM DOOR 1-1/2 FOR AIR CONDITIONING TRANSFER. <br />11. EQUIP LOCKS WITH INTERCHANGABLE CORE PIN TUMBLER INSERTS. PROVIDE 6-PIN CYLINDER HDWR. WITH 2 KEYS FOR EACH <br />LOCK. PROVIDE 2 MASTER KEYS. <br />12. PROVIDE SUBMITTAL DOCUMENTS FOR ALL HARDWARE REFERENCED TO EACH DOOR. HINGES TO BE 4-1/2" X 4-1/2" HINGE CO.; <br />LOCKS SHALL BE SCHLAGE AL / SPARTA D SERIES. MATCH EXISTING WHERE NECESSARY. PROVIDE MANUF. CATALOGUE CUTS FOR <br />OWNER SELECTION. <br />13. INTERIOR STOREFRONT GLASS DOORS (AND DOOR SIDELIGHT) TO BE 1/4" THICK SINGLE GLAZED, CLEAR TEMPERED. <br />14. SPECIALTY HARDWARE TYPES TO BE AS FOLLOWS: <br />STOREFRONT ENTRIES: <br />STOREFRONT HINGES / PIVOTS, <br />12" 'D' PULLS, <br />O/H DOOR CLOSER, <br />DEADLOCK: ADAMS RITE D.R. MS 1850, MS 4043, OR MS 4002, OR EQ. <br />WEATHER-STRIPPING, THRESHOLD AND STOPS <br />15.FINISH: PROVIDE POLISHED CHROME FINISH FOR ALL HARDWARE. HINGES TO BE MIN. 4" X 4" AS HAGER HINGE CO. OR EQUAL. <br />LOCKSETS TO BE SCHLAGE TRE-PLY DESIGN. STOPS, GASKETS (S88D), AND WEATHER -STRIPPING TO BE PEMKO MANUF. INC. PROVIDE <br />3 RUBBER SILENCERS PER SINGLE DOOR. <br /> STOREFRONT WINDOWS & DOORS <br /> 16. SUBMIT SHOP DRAWINGS COVERING FABRICATION, INSTALLATION AND FINISH. <br /> CONTRACTOR TO COORDINATE AND REVIEW SUBMITTALS (INCL. HARDWARE SCHEDULES) FOR <br /> CONFORMANCE W/ DESIGN INTENT, ETC. VERIFY QUANTITIES AND SIZES PRIOR TO ORDERING. <br /> 17. ALL NEW STORREFRONT WINDOWS AND DOORS TO BE KAWNEER TRIFAB 400 SERIES <br /> STOREFRONT SYSTEM, CENTER PLANE 1 ¾" X 4" WITH BLACK ANODIZED ALUMINUM FINISH. <br /> VERIFY FINISH WITH ARCHITECT PRIOR TO FABRICATION. PROVIDE MANUFACTURER'S <br /> STANDARD COLOR AND FINISH SAMPLES FOR ARCHITECT SELECTION. <br /> 18. ALL NEW STOREFRONT DOORS TO BE IR 350 ENTRANCE DOORS AS SUPPLIED BY KAWNEER <br /> INC. -UNITS TO BE FACTORY PRIMED AND FINISHED, AS NOTED ON SCHED. INSTALL PER <br /> MANUFACTURER'S INSTRUCTIONS, FOR WEATHERTIGHT INSTALLATION. COORDINATE WITH <br /> STUCCO AND PAINT. <br /> 19. CONTRACTOR TO COORDINATE AND VERIFY QUANTITIES AND SIZES PRIOR TO ORDERING. <br /> PROVIDE SUBMITTALS FOR ARCHITECT REVIEW. <br /> 20. ALL EXTERIOR WINDOWS SHALL BE SINGLE GLAZED WITH PANE OF PPG UV-PROTECTED, <br /> LOW-E CLEAR GLASS 1/4" THICK, WITH TEMPERED PANES AS NOTED ON THE ELEVATIONS. <br /> PROVIDE GLASS ASSEMBLIES WITH THE FOLLOWING MINIMUM VALUES: U-FACTOR = 1.190, <br /> SHGC = 0.830 <br />DIVISION 9 <br />METAL STUD FRAMING AND GYPSUM BOARD <br />1. PROVIDE FRAMING COMPONENTS OF SIZES INDICATED TO COMPLY WITH ASTM C 754 . ALL METAL COMPONENTS TO HAVE G40 <br />HOT-DIP GALVANIZED COATING PER ASTM A 525. PROVIDE SIZES AND GRADES INDICATED. ALL METAL FASTENERS TO BE CORROSION <br />RESISTANT. <br />2. ALL METAL WALL STUDS, INCLUDING SMOKE SEALED WALLS SHALL BE 16" ON CENTER, EXTENDING TO UNDERSIDE OF EXISTING GYP. <br />BD. PLENUM CEILING. WHERE FPAINTED GYP. BD. FINISH IS INDICATED, INSTALL 5/8" GYPSUM WALLBOARD (LEAD-LINED AS REQ'D.) <br />SCREWED TO 1/2" RESILIANT CHANNEL FURRING AT 16" O.C., WITH MAXIMUM SCREW SPACING OF 7". PARTITIONS INDICATED FULL HT. <br />ARE APPROX. 8'-0" HT. PROVIDE FIRE-RATED SEALANT CONT. AT TOP OF RATED WALLS. ISOLATE STEEL FRAMING FROM BUILDING <br />STRUCTURE TO PREVENT TRANSFER OF LOADING IMPOSED BY STRUCTURAL MOVEMENT. WALLS INDICATED SMOKE / SOUND SEALED <br />SHALL BE SET ON DOUBLE CONTINUOUS BED SEALANT. <br />3. STUD WALLS SHALL HAVE CONT. 20 GA. SHEET METAL BACKING AND HORIZONTAL BLOCKING WHERE WALL-HUNG CABINETS / <br />EQUIMENT INDICATED. PROVIDE DOUBLE 20 GA. STUDS AT ALL DOOR JAMBS. <br />4. ALL VERTICAL DRYWALL CORNERS / EDGES SHALL BE CONSTRUCTED WITH SQUARE METAL DRYWALL TRIM BEADS, TO BE <br />COORDINATED WITH PLANT-ON CORNER PROTECTION AS REQUIRED. <br />5. INTERIOR PARTITIONS: 1 LAYER 5/8" GYPSUM BOARD EACH SIDE 3 5/8" X 25 GAGE METAL STUDS AT 16" ON CENTER, EXCEPT THAT <br />WATER-RESISTANT GYP. BD. IS REQUIRED AT PLUMBING WALLS. REPAIRS TO DEMISING WALLS SHALL INCLUDE R-11 INSULATION. <br />6. ALL DRYWALL SHALL BE FINISHED WITH A SMOOTH TEXTURE. <br />SUSPENDED CEILING (NON-RATED OPEN PLENUM)/ T-BAR CEILINGS <br />7. APPLY ACOUSTICAL SEALANT IN A CONTINUOUS RIBBON CONCEALED ON BACK OF VERTICAL LEGS OF EDGE MEMBERS, AT <br />PRIVATE OFFICE ONLY. <br />8. PROVIDE ACM-7 CLIPS ETC. FOR ATTACHING HANGERS WITH CAPABILITY TO SUSTAIN A LOAD 10 TIMES THAT OF CEILING <br />CONSTRUCTION, PER ESR 1222. WIRE FOR HANGERS AND TIES: ASTM C636, CLASS 1 ZINC COATING, SOFT TEMPER. DO NOT ATTACH <br />HANGERS TO CONC. FLOOR DECK OR STEEL DECK TABS. ATTACH HANGERS TO STRUCTURAL MEMBERS. SPACE HANGERS MAX. 48" <br />O.C. AND NOT MORE THAN 8" FROM ENDS OF EACH MEMBER. <br />9. SUSPENSION SYSTEM FOR INTERIOR CEILINGS: USG DONN DX/DXL SUSPENDED T-BAR CEILING SYSTEM SET AT HEIGHTS SHOWN ON <br />CEILING PLAN, PER ASTM C 635 (MANUFACTURER'S STANDARD DIRECT-HUNG SUSPENSION SYSTEM FOR SUSPENDED GYPSUM BOARD <br />CEILINGS). MAIN BEAMS AND CROSS FURRING MEMBERS INCLUDING SEISMIC SPLAY-BRACING AND VERTICAL STRUTS THAT ARE <br />CROSS CONNECTED TO FORM A MODULAR SUPPORTING NETWORK. <br />10. CEILING TILES: WHITE 9 <br />16" X 24" X 24" NON-FIRE-RESISTANCE-RATED, WATER-FELTED, MINERAL-BASE TILE: TYPE III, FORM 2 ACOUSTICAL <br />TILES PER ASTM E 1264 IN ALL T-BAR LOCATIONS, AS 'ASTRO-CLIMA PLUS W/ RABBETED EDGE, OR EQUIVALENT. MATCH EXISTING <br />WHERE POSSIBLE. <br />13. STANDARD FOR CEILING SUSPENSION SYSTEM INSTALLATIONS: COMPLY WITH ASTM C 636 AND CBC 2506.2.1. CONFORM TO THE <br />LAYOUT SHOWN ON REFLECTED CEILING PLANS. SCREW EDGE SUPPORTS TO SUBSTRATE AT 16" O.C. AND AT 3" FROM ENDS, <br />LEVELING WITH CEILING SUSPENSION SYSTEM TO A TOLERANCE OF 1/8" IN 12 FEET. MITER CORNERS ACCURATELY AND CONNECT <br />SECURELY. DO NOT USE EXPOSED FASTENERS. <br />PAINTING / FINISHING <br />14. CONTRACTOR TO ENSURE ALL FINISH MATERIALS WILL BE FLUSH AND WASHABLE. INTERIOR FINISH TO CONFORM TO <br />REQUIREMENTS OF CBC 803.5 FLAME SPREAD INDEX 200 MAX. SMOKE DENSITY RATING 450 MAX. ALL DECORATIVE MATERIALS SHALL <br />BE MAINTAINED IN A FLAME RETARDANT CONDITION. ALLOW FOR 3-COLOR INTERIOR PAINT SCHEME, PER IPS #11 ENAMEL AND IPS <br />#9 EPOXY PAINT IN PROCEDURE ROOM, RE-USE ROOM, JANITOR AND MED WASTE ROOMS. <br />15. ALL FINISHED SURFACES SCHEDULED FOR PAINTING TO BE CLEAN AND FREE OF SURFACE DEFECTS AND READY FOR PAINTING. <br />ALL DRYWALL TO BE TAPED, FLOATED, SANDED AND FINISHED WITH A SMOOTH TEXTURE. INTERIOR PAINTING MAY BE APPLIED BY <br />BRUSH, ROLLER, OR SPRAY RIG METHOD ACCORDING TO MANUFACTURER'S SPECIFICATIONS. PAINT SPECS ARE BASED ON VISTA <br />CAREFREE PAINTS, BUT EQUALS ARE ACCEPTABLE (ALL PAINT COLORS TO BE AS SELECTED BY ARCHITECT/ OWNER) AS FOLLOWS: <br />INTERIOR PAINTS & CLEAR WOOD FINISH: <br />DRYWALL <br /> PRIMER- 1 COAT PVA (USG DRYWALL PRIMER) <br /> FINISH- 2 COATS - LATEX ACRYLIC EGGSHELL ENAMEL <br />PAINTED WOODWORK <br /> PRIMER - 1 COAT - LATEX ENAMEL <br /> FINISH- 2 COATS - SEMI GLOSS LATEX ACRYLIC ENAMEL <br />CLEAR WOOD FINISH <br /> STAIN - 1 COAT, INTERIOR STAIN <br /> FINISH - 2 COATS SATIN FINISH VARNISH <br /> SAND LIGHTLY BETWEEN COATS <br />VINYL WALL COVERING <br />16. WHERE INDICATED, PROVIDE VINYL WALLCOVERING AT SELECTED FOR ACCENT WALLS, ETC. COMPLY WITH FS CCC-W-408, <br />CLASS A, MEDIUM DUTY MIN. 19 OZ: TYPE II 54" WIDTH. REFER TO FINISH SCHEDULE AND VERIFY SELECTION WITH OWNER. USE MILDEW <br />RESISTANT, NON-STAINING, STRIPPABLE ADHESIVE COMPATIBLE WITH COVERING SELECTED. <br />FLOORING <br />17. COORDINATE DELIVERY AND INSTALLATION OF OWNER-SUPPLIED GLUE-DOWN COMMERCIAL CARPET AS SPECIFIED IN THE <br />MATERIALS AND COLOR SCHEDULE. ALLOW SUFFICIENT TIME FOR VERIFICATION THAT ACTUAL SELECTION IS AVAILABLE. <br />CONTRACTOR SHALL INSTALL SCHEDULE BASE MATERIAL AFTER CARPET INSTALLATION. <br />18. SHEET VINYL FLOORING SHALL BE COMMERCIAL GRADE PRODUCT, AS SPECIFIED ON THE FINISH SCHEDULE: ALLOW OWNER TO <br />CONFIRM SELECTION PRIOR TO ORDERING. <br />19. PROVIDE MIN. 3 COATS MANUFACTURER-RECOMMENDED FINISH WAX TO ALL NEW SHEET VINYL FLOORS. CLEAN AND BUFF <br />FINISHED INSTALLATIONS. <br />20. TILE WHERE REQUIRED SHALL BE PORCELAIN CERAMIC TILE,, THINSET OVER LEVELLING COMPOUND. ALLOW FOR SETTING OF <br />INDIVIDUAL TILE ACCENTS & LINERS PER ELEVS. <br />1 <br />A5.0 <br />SPECIFICATIONS <br />SCALE: NTS <br />A-5.0 <br />Dr <br />. <br /> <br />K <br />a <br />l <br />a <br />n <br />t <br />a <br />r <br />i <br /> <br />D <br />e <br />n <br />t <br />a <br />l <br /> <br />O <br />f <br />f <br />i <br />c <br />e <br /> <br />SHEET NO. <br />2509 <br />REVISIONS: <br />5/30/2025DATE: <br />PROJECT NO. <br />DE <br />N <br />T <br />A <br />L <br /> <br />O <br />F <br />F <br />I <br />C <br />E <br /> <br />T <br />E <br />N <br />A <br />N <br />T <br /> <br />I <br />M <br />P <br />R <br />O <br />V <br />E <br />M <br />E <br />N <br />T <br /> <br />P <br />R <br />O <br />J <br />E <br />C <br />T <br />22 <br />2 <br />2 <br /> <br />S <br />. <br /> <br />B <br />r <br />i <br />s <br />t <br />o <br />l <br /> <br />S <br />t <br />r <br />e <br />e <br />t <br />, <br /> <br />S <br />u <br />i <br />t <br />e <br /> <br />A <br />, <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4