ISSUED
<br />DATE:
<br />REVISIONS
<br />DRAWINGS, SPECIFICATIONS AND OTHER VISUAL AIDS, AS
<br />INSTRUMENTS OF SERVICE ARE THE PROPERTY OF THE
<br />DRAFTER/DESIGNER WHETHER THE PROJECT FOR
<br />WHICH THEY ARE MADE BE EXECUTED OR NOT, AND
<br />THEY ARE NOT TO BE USED FOR ANY OTHER SITE THAN
<br />THE ONE FOR WHICH THEY ARE PREPARED, EXCEPT BY
<br />AGREEMENT IN WRITING.
<br />NO
<br />.
<br />
<br />D
<br />E
<br />S
<br />C
<br />R
<br />I
<br />P
<br />T
<br />I
<br />O
<br />N
<br />
<br />D
<br />A
<br />T
<br />E
<br />DRAFTER/DESIGNER:
<br />LUIS N OROZCO
<br />562.661.9281
<br />LUIS.OROZCO.A@LIVE.COM
<br />DATE:
<br />G102
<br />GENERAL NOTES
<br />PR
<br />O
<br />P
<br />E
<br />R
<br />T
<br />Y
<br />
<br />O
<br />W
<br />N
<br />E
<br />R
<br />:
<br />
<br />S
<br />I
<br />L
<br />V
<br />I
<br />A
<br />
<br />T
<br />O
<br />R
<br />R
<br />E
<br />S
<br />15
<br />1
<br />1
<br />
<br />S
<br />.
<br />
<br />B
<br />I
<br />R
<br />C
<br />H
<br />
<br />S
<br />T
<br />.
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />0
<br />7
<br />2
<br />7
<br />GA
<br />R
<br />A
<br />G
<br />E
<br />
<br />C
<br />O
<br />N
<br />V
<br />E
<br />R
<br />S
<br />I
<br />O
<br />N
<br />
<br />T
<br />O
<br />
<br />A
<br />N
<br />AC
<br />C
<br />E
<br />S
<br />S
<br />O
<br />R
<br />Y
<br />
<br />D
<br />W
<br />E
<br />L
<br />L
<br />I
<br />N
<br />G
<br />
<br />U
<br />N
<br />I
<br />T
<br />09/10/2024
<br />GENERAL NOTES:
<br />1) ALL MEASUREMENTS AND JOB CONDITIONS ARE SUBJECT TO VERIFICATION AND
<br />ANY DISCREPANCIES MUST BE CALLED ATTENTION TO THE DESIGNER IMMEDIATELY.
<br />2) ANY ERRORS, AMBIGUITIES AND OMISSIONS IN DRAWINGS AND SPECIFICATIONS
<br />SHALL BE REPORTED TO DESIGNER FOR CORRECTIONS BEFORE ANY PART OF THE
<br />WORK IS STARTED. UNLESS EXPRESSLY STIPULATED, NO ADDITIONAL ALLOWANCE
<br />WILL BE MADE IN FAVOR OF THE CONTRACTOR/SUBCONTRACTOR AND/OR THE
<br />MANUFACTURER BY VIRTUE OF ERRORS, AMBIGUITIES AND/OR OMISSIONS WHICH
<br />SHOULD HAVE BEEN DISCOVERED DURING THE PREPARATION OF BID ESTIMATE AND
<br />DIRECTED TO THE ATTENTION OF THE DESIGNER IN A TIMELY MANNER.
<br />3) IF DUE TO THE NATURE OF MATERIAL OR METHOD OF CONSTRUCTION DETAILS AS
<br />SHOWN ON DRAWINGS OR SPECIFIED CANNOT BE SATISFACTORILY ACHIEVED, THE
<br />CONTRACTOR SHALL IMMEDIATELY ADVISE THE DESIGNER, IN WRITING, AND REQUEST
<br />AN ADJUSTMENT CONSIDERED NECESSARY FOR THE PROPER EXECUTION OF WORK.
<br />THIS REQUEST SHALL BE MADE BEFORE ANY MATERIAL IS ORDERED OR FABRICATED.
<br />ANY UNSATISFACTORY WORK THAT DEVELOPS DURING FABRICATION OR
<br />INSTALLATION SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE.
<br />4) THE CONTRACTOR AND SUB-CONTRACTORS SHALL COORDINATE THEIR WORK
<br />WITH ADJACENT WORK AND SUB-CONTRACTORS AND COOPERATE WITH EACH OTHER
<br />SO AS TO FACILITATE GENERAL PROGRESS OF WORK. EACH TRADE SHALL AFFORD
<br />OTHER TRADES OTHER REASONABLE OPPORTUNITY FOR INSTALLATION OF THEIR
<br />WORK AND FOR STORAGE OF THEIR MATERIALS. THE CONTRACTOR SHALL
<br />COORDINATE ALL WORK AT THE SITE.
<br />5) SHOULD THE DRAWINGS DISAGREE WITH THEMSELVES OR THE SPECIFICATIONS,
<br />THE BETTER QUALITY OR THE GREATEST QUANTITY OF WORK OR MATERIALS SHALL
<br />BE INCLUDED IN THE PROPOSAL, AND UNLESS OTHERWISE ORDERED BY THE
<br />DESIGNER, IN WRITING, SHALL BE PERFORMED OR FURNISHED.
<br />6) ALL WORK SHALL BE IN COMPLIANCE WITH APPLICABLE ORDINANCES AND
<br />REGULATIONS OF ALL PUBLIC AUTHORITIES BEARING THE PERFORMANCE OF THE
<br />WORK.
<br />7) IF THE CONTRACT DOCUMENTS ARE AT VARIANCE WITH THE ABOVE, THE
<br />CONTRACTOR SHALL NOTIFY THE DESIGNER PRIOR TO THE PERFORMANCE OF SUCH
<br />WORK, AND ANY NECESSARY ADJUSTMENTS SHALL BE MADE BY APPROPRIATE
<br />MODIFICATION.
<br />8) THE CONSTRUCTION DOCUMENTS ARE NOT TO BE REPRODUCED OR USED FOR
<br />ANY OTHER PURPOSE THAN ORIGINALLY INTENDED EXCEPT AS AUTHORIZED IN
<br />WRITING BY THE DESIGNER.
<br />9) THE ABOVE NOTES ARE TO BE SUPERSEDED WHEN CONSTRUCTION DOCUMENTS
<br />ARE ACCOMPANIED BY "INSTRUCTIONS TO BIDDERS" AND/OR "GENERAL CONDITIONS".
<br />10) THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL EXISTING CONDITIONS
<br />AND DIMENSIONS. THE CONTRACTOR SHALL CHECK ALL DIMENSIONS AND NOTIFY THE
<br />DESIGNER OF ANY DISCREPANCIES BEFORE COMMENCING WORK.
<br />11) ALL FOOTINGS, NAILING, REINFORCING, ANCHOR BOLTS, STRAPS AND
<br />STRUCTURAL MEMBERS SHALL BE IN COMPLIANCE WITH THE UNIFORM BUILDING
<br />CODE (UBC), OTHER APPLICABLE CODES, AND AS SHOWN ON STRUCTURAL
<br />DRAWINGS.
<br />12) THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR, EQUIPMENT,
<br />TRANSPORTATION AND SERVICES NECESSARY FOR COMPLETION OF WORK EXCEPT
<br />AS PROVIDED BY OWNER AND AS OTHERWISE NOTED.
<br />13) THE CONTRACTOR SHALL PROVIDE FOR ALL NECESSARY PERMITS AND
<br />INSPECTIONS, OTHER THAN THE PLAN CHECK AND BUILDING PERMIT FEES TO BE
<br />PROVIDED BY THE OWNER. SUB-CONTRACTORS WHOSE WORK IS NOT NORMALLY
<br />COVERED BY THE BUILDING PERMIT, SUCH AS, BUT NOT LIMITED TO, ELECTRICAL,
<br />MECHANICAL, PLUMBING, OFF-SITE WORK AND SO FORTH, SHALL OBTAIN AND PAY
<br />FOR THEIR APPROPRIATE PERMITS.
<br />14) THE CONTRACTOR SHALL MAINTAIN LIABILITY INSURANCE TO PROTECT
<br />HIMSELF/HERSELF AND HOLD THE OWNER AND THE DESIGNER HARMLESS FROM ANY
<br />AND ALL CLAIMS FOR DAMAGES FOR PERSONAL OR BODILY INJURY OR DEATH OR FOR
<br />PROPERTY DAMAGE DURING THE COURSE OF THE CONTRACT (FIRE INSURANCE
<br />SHALL BE MAINTAINED BY THE OWNER).
<br />15) CONTRACTOR SHALL PROVIDE SUFFICIENT MEANS FOR PROTECTING THE PUBLIC
<br />FROM INJURY AS WELL AS ADJACENT PROPERTY AND VEGETATION FROM DAMAGE.
<br />16) THE CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL WORK WITH THE
<br />APPROVAL OF THE OWNER AND WITH MINIMUM DISRUPTION. ANY DEMOLITION SHALL
<br />BE KEPT TO A MINIMUM AND ALL DEBRIS SHALL BE REMOVED FROM THE SITE. THE
<br />OWNER SHALL BE CONSULTED BEFORE ANY BUILDING SERVICE IS TEMPORARILY CUT
<br />OFF. TEMPORARY RE-ROUTE UTILITIES REQUIRED BY THE OWNER FOR CONTINUOUS
<br />SERVICE.
<br />17) ALL DUST AND NOISE CREATED BY THE WORK SHALL BE KEPT TO A MINIMUM.
<br />18) UPON COMPLETION OF THE DAILY WORK AND COMPLETION OF ALL WORK, ALL
<br />WORK AREAS SHALL BE LEFT BROOM CLEAN AND ALL DEBRIS REMOVED FROM THE
<br />SITE BY THE CONTRACTOR. DURING CONSTRUCTION THE CONTRACTOR SHALL
<br />REMOVE AND DISPOSE OF ANY DEBRIS OR UNAPPROVED MATERIALS. THE SITE SHALL
<br />BE KEPT IN A NEAT AND SAFE CONDITION.
<br />19) CONTRACTOR SHALL PROVIDE SUFFICIENT MEANS FOR PROTECTING EXPOSED
<br />FINISHES, NEW CONSTRUCTION AND MATERIALS FROM DAMAGE BY WEATHER OR
<br />VANDALS FOR THE COURSE OF THE PROJECT. CONTRACTOR SHALL PROVIDE ALL
<br />BARRICADES, FENCES AND ANY OTHER ITEMS REQUIRED BY LOCAL ORDINANCES OR
<br />CODES.
<br />20) ALL WEATHER EXPOSED JOINTS SHALL BE FLASHED AND SET IN MASTIC.
<br />21) CAULK BETWEEN ALL PLASTER STOPS.
<br />22) INSTALL ALL CLOSING REQUIRED TO PROVIDE COMPLETE WATERTIGHT
<br />PROTECTION. FLASH DECK TO ROOF INTERSECTIONS, WALL TO ROOF INTERSECTIONS
<br />AND ALL VERTICAL TO HORIZONTAL SURFACES. FLASH AND COUNTER FLASH AND SET
<br />IN MASTIC TO PROVIDE FOR A WATERTIGHT CONNECTION. ALL SHEET METAL SHALL BE
<br />GALVANIZED IRON UNLESS OTHERWISE NOTED. GAUGES AND CONFIGURATIONS OR
<br />ASSEMBLIES SHALL BE AS RECOMMENDED BY SMACNA.
<br />23) WOOD STAIRS SHALL BE HOUSED, WEDGED AND FITTED WITH GLUE BLOCKS.
<br />24) FIRESTOPS: FIRESTOPPING SHALL BE PROVIDED TO CUT OFF ALL CONCEALED
<br />DRAFT OPENINGS (BOTH VERTICAL & HORIZONTAL) AND SHALL FORM AN EFFECTIVE
<br />BARRIER BETWEEN STORIES AND BETWEEN A TOP STORY AND A ROOF SPACE. IT
<br />SHALL BE USED IN SPECIFIC LOCATIONS, AS FOLLOWS:
<br />1 IN EXTERIOR OR INTERIOR STUD WALLS, AT CEILINGS AND FLOOR LEVELS.
<br />2 IN ALL STUD WALLS AND PARTITIONS, INCLUDING FURRED SPACES, SO PLACED
<br />THAT THE MAXIMUM DIMENSION OF ANY CONCEALED SPACE IS NOT OVER 10 FEET.
<br />3 BETWEEN STAIR STRINGERS AT TOP AND BOTTOM AND BETW EEN STUDS ALONG
<br />AND IN LINE WITH RUN OF STAIR ADJOINING STUD WALLS AND PARTITIONS.
<br />4 AROUND TOP, BOTTOM, SIDES AND ENDS OF SLIDING DOOR POCKETS.
<br />5 IN SPACES BETWEEN CHIMNEYS AND FLOOR OR CEILING FRAMING, LOOSE NON-
<br />COMBUSTIBLE SUPPORTS, OR A METAL COLLAR TIGHTLY FITTED TO THE CHIMNEY AND
<br />NAILED TO THE WOOD FRAMING MAY BE USED.
<br />6 ANY OTHER LOCATIONS NOT SPECIFICALLY MENTIONED ABOVE, SUCH AS HOLES
<br />FOR PIPES, SHAFTING, BEHIND FURRING STRIPS AND SIMILAR PLACES WHICH COULD
<br />AFFORD A PASSAGE FOR FLAMES.
<br />25) FIRESTOPS WHEN OF WOOD SHALL BE OF 2 INCH NOMINAL THICKNESS. IF THE
<br />WIDTH OF THE OPENING IS SUCH THAT MORE THAN ONE PIECE OF LUMBER IS
<br />NECESSARY, THERE SHALL BE TWO THICKNESSES OF 1 INCH PLYWOOD WITH JOINTS
<br />BACKED BY 3/4" PLYWOOD.
<br />26) FIRE STOPS MAY ALSO BE OF GYPSUM BOARD, CEMENT ASBESTOS BOARD,
<br />MINERAL WOOL OR OTHER APPROVED NON-COMBUSTIBLE MATERIALS SECURELY
<br />FASTENED IN PLACE.
<br />27) THE CONTRACTOR SHALL PROVIDE ALL SHORING AND BRACING REQUIRED TO
<br />ADEQUATELY PROTECT PERSONNEL AND PROPERTY AND TO INSURE SAFETY OF THE
<br />STRUCTURE THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL
<br />PROVIDE, AT HIS OWN EXPENSE, ALL ERECTION BRACING AND DRAWINGS REQUIRED
<br />BY LAW AND BY SAFE CONSTRUCTION PRACTICES.
<br />28) SPECIFIC NOTES AND DETAILS SHALL GOVERN OVER GENERAL NOTES AND
<br />TYPICAL DETAILS. SUBSTITUTION MAY BE MADE FOR PROPRIETARY ITEMS NOTED,
<br />SUBJECT TO PRIOR REVIEW AND APPROVAL IN WRITING BY THE DESIGNER.
<br />6) GENERAL CONTRACTOR SHALL PROVIDE FIRE EXTINGUISHERS AS REQUIRED BY
<br />THE FIRE DEPARTMENT.
<br />7) ALL SHEET METAL, COPING, FLASHING ETC. SHALL BE MINIMUM 24 GAUGE G.I.
<br />8) STUCCO - ALL HORIZONTAL SURFACE METAL DRIP SCREEDS @ ALL BALCONIES,
<br />PROJECTIONS AND ETC., (TYPICAL).
<br />UTILITIES, PLUMBING, DRAINAGE, ETC.
<br />1) CONTRACTOR SHALL COORDINATE WITH REPRESENTATIVES OF LOCAL UTILITIES,
<br />INCLUDING GAS, WATER, POWER, SEWER, TELEPHONE AND T.V. TO VERIFY AVAILABLE
<br />SERVICE AND, IF APPLICABLE, TO ESTABLISH TEMPORARY SERVICE. FINDINGS SHALL
<br />BE INDICATED ON THE RECORD DRAWINGS.
<br />2) CONTRACTOR/SUB-CONTRACTOR SHALL RE-ROUTE ANY EXISTING UTILITY LINES,
<br />CONDUITS OR EQUIPMENT IN CONFLICT WITH NEW CONSTRUCTION AND SHALL NOTE
<br />SUCH RE-ROUTING ON THE RECORD DRAWINGS.
<br />3) CONTRACTOR/SUB-CONTRACTOR SHALL PROVIDE AND INSTALL NEW
<br />UNDERGROUND WATER AND GAS SUPPLY LINES AND UPGRADES AS REQUIRED AND
<br />VERIFY THAT METER, MAIN AND LINE SIZES ARE ADEQUATE TO PROVIDE ACCEPTABLE
<br />PRESSURE AND VOLUME OF NEW CONSTRUCTION. CONTRACTOR MUST VERIFY IN
<br />FIELD PRIOR TO BID SUBMITTAL.
<br />4) CONTRACTOR SHALL PROVIDE NEW MAIN UNDERGROUND SEWER LINE AND NEW
<br />WASTE LINES OF SUFFICIENT SIZE AS REQUIRED, INCLUDING ACCESSIBLE CLEANOUTS
<br />AT CONNECTIONS, BENDS OR ELSEWHERE AS REQUIRED BY CODE. CONTRACTOR
<br />MUST VERIFY IN FIELD PRIOR TO BID SUBMITTAL.
<br />5) UNLESS OTHERWISE NOTED OR REQUIRED BY CODE, ALL UNDERGROUND STORM
<br />DRAIN LINES SHALL BE PVC SCHEDULE 40 MINIMUM 4" DIAMETER OR GREATER AS
<br />REQUIRED TO HANDLE LOAD. ALL CONNECTIONS SHALL BE PROPERLY JOINED AND
<br />SEALED SO THAT THEY ARE WATERTIGHT.
<br />N/A 6) CATCH BASINS SHALL BE PROVIDED WITH CAST IRON GRILLS WHERE
<br />INDICATED ON PLANS OR REQUIRED BY JOB SITE CONDITIONS.
<br />7) FLUSH OUT ALL NEW WATER SUPPLY LINES PRIOR TO CONNECTING FIXTURES.
<br />7) DRAINAGE SHALL NOT FLOW OVER PUBLIC PROPERTY OR ACROSS ADJACENT
<br />PRIVATE PROPERTY (UBC 2907(d) 5, 3027 (e) , 7012)
<br />N/A 9) DRY STANDPIPE LOCATIONS SHALL BE APPROVED BY FIRE INSPECTOR PRIOR
<br />TO INSTALLATION.
<br />10) ALL COPPER PIPING SHALL BE TYPE "L".
<br />11) REPLACE ALL EXISTING GALVANIZED PIPES WITH COPPER PIPING TYPE "L".
<br />ELECTRICAL
<br />1. UNLESS OTHERWISE NOTED, ALL CONDUITS SHALL BE CONCEALED IN STRUCTURE,
<br />ATTIC SPACES OR UNDERGROUND. ANY EXCEPTIONS SHALL BE AUTHORIZED BY THE
<br />DESIGNER.
<br />2. CONTRACTOR SHALL PROVIDE NEW METERS AND PANELS, BREAKERS, CIRCUITS,
<br />ETC. CONTRACTOR SHALL CONFIRM ALL ELECTRICAL LOADS AND REQUIREMENTS FOR
<br />APPLIANCES, HEATING AND VENTILATION SYSTEMS AND OTHER ELECTRICAL
<br />EQUIPMENT AND FIXTURES PRIOR TO PROVIDING NEW SERVICE. CONTRACTOR WILL
<br />CONFIRM ABOVE REQUIREMENTS PRIOR TO SUBMITTING BID.
<br />3. CONTRACTOR SHALL VERIFY CLEARANCES FOR ALL RECESSED FIXTURES AND
<br />ADVISE DESIGNER OF ANY CONFLICTS PRIOR TO ORDERING.
<br />4. CONTRACTOR SHALL CONFIRM FIXTURE TRIM SELECTION AND FINISH OPTIONS
<br />WITH DESIGNER PRIOR TO ORDERING.
<br />5. ALL WIRING SHALL BE COPPER
<br />6. CONTRACTOR SHALL CONFIRM MATERIAL AND COLOR OF ALL SWITCHES, OUTLETS
<br />AND COVER PLATES WITH DESIGNER PRIOR TO ORDERING.
<br />7. CONTRACTOR SHALL PROVIDE TITLE 24, FORM 5, IF REQUIRED.
<br />8. LIGHT CONTROLS SHALL BE 36" TO CENTER ABOVE FINISHED FLOOR UNLESS
<br />NOTED OTHERWISE. LIGHT CONTROLS SHALL BE 48" TO CENTER ABOVE FINISHED
<br />FLOOR FOR ADA REQUIRED SPACES. (ADA N/A)
<br />9. ALL WALL DUPLEX RECEPTACLES, TELEPHONE, T.V. AND OTHER OUTLETS SHALL BE
<br />MOUNTED 1'-0" TO CENTER ABOVE FINISHED FLOOR, EXCEPT AT COUNTER TOPS AND
<br />WHERE OTHERWISE NOTED. ALL WALL DUPLEX RECEPTACLES, TELEPHONE, T.V. AND
<br />OTHER OUTLETS SHALL BE MOUNTED 1'-3" TO CENTER ABOVE FINISHED FLOOR, FOR
<br />ADA REQUIRED SPACES EXCEPT AT COUNTER TOPS AND WHERE OTHERWISE NOTED.
<br />10.GROUND FAULT INTERRUPTER REQUIRED FOR ALL EXTERIOR OUTLETS,
<br />BATHROOMS, TEMPORARY PANELS AND OTHER WET AREAS AS REQUIRED BY CODE.
<br />11.DIMMERS SHALL BE SWITCH OR SLIDE TYPE CONTINUOUS DIMMERS. VERIFY
<br />SELECTION WITH DESIGNER PRIOR TO ORDERING.
<br />12.EVERY BEDROOM AND HALLWAY TO A BEDROOM SHALL BE PROVIDED WITH SMOKE
<br />DETECTORS CONFORMING TO UBC STANDARD 43-C. SMOKE DETECTORS SHALL BE
<br />MOUNTED ON THE CEILING OR THE WALL AT A POINT CENTRALLY LOCATED IN THE
<br />CORRIDOR OR AREA GIVING ACCESS TO ROOMS USED FOR SLEEPING PURPOSES.
<br />13.N/A IN AN EFFICIENCY DWELLING UNIT, THE DETECTOR SHALL BE LOCATED ON THE
<br />CEILING OF THE MAIN ROOM. WHERE SLEEPING ROOMS ARE ON AN UPPER LEVEL, A
<br />DETECTOR SHALL BE PLACED AT THE CENTER OF THE CEILING DIRECTLY ABOVE THE
<br />STAIRWAY. PROVIDE SMOKE DETECTORS AT WALL OR CEILING IN ALL SLEEPING
<br />ROOMS.
<br />14.ALL SMOKE DETECTORS SHALL BE LOCATED IN ACCORDANCE WITH APPROVED
<br />MANUFACTURER'S INSTRUCTIONS. WHEN ACTUATED, THE DETECTOR SHALL PROVIDE
<br />AN ALARM IN THE DWELLING UNIT. CONFIRM TYPE AND LOCATIONS OF ALL DEVISES
<br />WITH DESIGNER PRIOR TO ORDERING AND WIRING FOR UNIT.
<br />15.ALL WORK SHALL INCLUDE MATERIALS, EQUIPMENT AND ALL LABOR REQUIRED TO
<br />COMPLETE "ELECTRICAL" WORK AS SHOWN ON THE DRAWINGS AND HEREIN
<br />SPECIFIED.
<br />16.ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH THE CITY OF LOS
<br />ANGELES'S ELECTRICAL CODE, CURRENT RULES OF THE NATIONAL ELECTRICAL
<br />CODE, NATIONAL BOARD OF FIRE UNDERWRITERS, AND WITH ANY PREVAILING RULES
<br />AND REGULATIONS PERTAINING TO ADEQUATE PROTECTION AND/OR GUARDING OF
<br />ANY MOVING PARTS OR OTHERWISE OTHER HAZARDOUS LOCATIONS. MATERIALS
<br />SHALL COMPLY WITH UNDERWRITERS LABORATORIES REQUIREMENTS.
<br />17.VERIFY LOCATION OF ALL OUTLETS, SWITCHES, PANEL BOXES, LIGHTING FIXTURES,
<br />BUZZERS, INTERCOMS, SMOKE DETECTORS (AND ANY OTHER VISIBLE CONTROLS OR
<br />ELECTRICAL EQUIPMENT) WITH DESIGNER PRIOR TO INSTALLATION.
<br />18.ALL TOGGLE SWITCHES AND SWITCH PLATES, CONVENIENCE RECEPTACLES AND
<br />COVER PLATES, SMOKE DETECTORS AND BUZZERS SHALL BE WHITE IN COLOR
<br />UNLESS OTHERWISE NOTED OR DIRECTED BY OWNER OR DESIGNER. CONTRACTOR
<br />SHALL PROVIDE SAMPLE TO DESIGNER PRIOR TO ORDERING.
<br />N/A 19. PROVIDE EMERGENCY POWER
<br />SECURITY NOTES:
<br />1) EXTERIOR DOORS, DOORS BETWEEN GARAGE AND HOUSE, WINDOWS AND THEIR
<br />HARDWARE SHALL CONFORM TO CURRENT EDITION OF THE UBC.
<br />2) WINDOWS AND OPENINGS WITHIN 12" OF GROUND LEVEL AND WITH OVER 96
<br />SQUARE FEET IN AREA ARE DEEMED "ACCESSIBLE". GLAZING AND GLAZED
<br />ASSEMBLIES FOR "ACCESSIBLE" OPENINGS SHALL BE CERTIFIED AS MEETING TEST
<br />PROVISIONS OF UBC 41-2.
<br />3) LOUVERED WINDOWS ARE NOT PERMITTED IN "ACCESSIBLE" AREAS OR WITHIN 6'
<br />OF ANY BALCONY, LANDING OR PORCH.
<br />4) WINDOWS SHALL BE A MINIMUM OF 40" FROM THE DOOR LOCK WHEN THE DOOR IS
<br />IN THE CLOSED POSITION.
<br />5) DOOR LITES AND WINDOWS WITHIN 40" OF THE LOCKING DEVISE OF THE DOOR
<br />SHALL BE FULLY TEMPERED OR APPROVED BURGLARY RESISTANT.
<br />6) A SINGLE SWINGING DOOR, ACTIVE LEAF OF A PAIR OF DOORS OR THE BOTTOM
<br />LEAF OF DUTCH DOORS, SHALL BE EQUIPPED WITH A DEADBOLT AND A DEADLOCKING
<br />LATCH, BOTH KEY OPERATED FROM THE OUTSIDE.
<br />7) JAMBS SHALL BE INSTALLED WITH SOLID BACKING FOR A 6" VERTICAL DISTANCE ON
<br />EACH SIDE OF THE LOCK STRIKE AREA.
<br />8) TRIMMERS SHALL BE FULL DOOR LENGTH WITH SOLID BACKING AGAINST SOLE AND
<br />HEADER PLATES.
<br />9) HORIZONTAL BLOCKING SHALL BE PLACED BETWEEN STUDS AT LOCK STRIKE
<br />HEIGHT FOR 3 STUD SPACES.
<br />10) STRIKE PLATES SHALL BE A MINIMUM 16 US GAUGE STEEL, BRONZE OR BRASS AND
<br />SECURED BY A MINIMUM OF (2) 2" LENGTH SCREWS.
<br />11) DOUBLE DOORS, IN-ACTIVE LEAF, SHALL BE SECURED WITH BOTH HEAD AND BASE
<br />FLUSH BOLTS WITH A MINIMUM 5/8" EMBEDMENT.
<br />12) DOOR(S) WITH PANIC HARDWARE SHALL HAVE TWO LOCKING POINTS OR BE
<br />EQUIPPED WITH .125 THICK 2" WIDE ASTRAGAL.
<br />13) SWINGING DOORS ARE SECURITY OPENINGS. THE FOLLOWING ARE MINIMUM
<br />REQUIREMENTS. OTHER NOTES AND DETAILS SHALL SUPERSEDE WHEN EQUAL TO OR
<br />MORE SECURE THAN THESE REQUIREMENTS. SEE DOOR AND WINDOW SCHEDULES.
<br />1 INSTALL DEAD LOCKING LATCHES.
<br />2 INSTALL LOCK THAT IS KEY OPERATED FROM EXTERIOR AND OPENABLE FROM
<br />INTERIOR WITHOUT KEY, OR SPECIAL EFFORT OR SPECIAL KNOWLEDGE.
<br />3 DOOR STOPS OF THE IN-SWINGING DOORS SHALL BE OF A ONE-PIECE
<br />CONSTRUCTION WITH THE JAMB OR JOINTED BY RABBET TO THE JAMB.
<br />4 ALL PIN-TYPE HINGES WHICH ARE ACCESSIBLE FROM OUTSIDE THE SECURED
<br />AREAS WHEN THE DOOR IS CLOSED SHALL HAVE NON-REMOVABLE HINGE PINS. IN
<br />ADDITION THEY SHALL HAVE THE MINIMUM 1/4" DIAMETER STEEL JAMB STUDS WITH
<br />1/4" MINIMUM PROJECTION UNLESS THE HINGES ARE SHAPED TO PREVENT THE
<br />REMOVAL OF THE DOOR IF THE HINGES ARE REMOVED.
<br />5 THE STRIKE PLATE FOR LATCHES AND THE HOLDING DEVICE FOR PROJECTING
<br />DEADBOLTS IN WOOD CONSTRUCTION SHALL BE SECURED TO THE JAMB AND THE
<br />WALL FRAMING WITH SCREWS NOT LESS THAN 2 1/4" IN LENGTH.
<br />6 DEADBOLTS SHALL CONTAIN HARDENED INSERTS, HAVE CYLINDER GUARD AND
<br />MINIMUM 6 PIN TUMBLER LOCKS, AND USE MINIMUM 1/4" DIAMETER CONNECTING
<br />SCREWS.
<br />7 STRAIGHT DEADBOLTS SHALL HAVE A MINIMUM THROW OF 1" AND AN EMBEDMENT
<br />OF NOT LESS THAN 5/8" INTO THE STRIKE.
<br />8 A HOOK SHAPED OR AN EXPANDING-LUG DEADBOLT SHALL HAVE A MINIMUM
<br />THROW OF 3/4".
<br />9 WOOD FLUSH-TYPE DOORS SHALL BE 1 3/4" THICK MINIMUM WITH A SOLID CORE OF
<br />WOOD, OR PARTICLE BOARD OF 25 PCF DENSITY. SWINGING WOOD DOORS SHALL
<br />COMPLY WITH SECTION 6709 (A) FOR THICKNESS AND CONSTRUCTION.
<br />14) OVERHEAD AND SLIDING GARAGE DOORS SHALL BE SECURED WITH A CYLINDER
<br />LOCK, PADLOCK WITH HARDENED STEEL SHACKLE, METAL SLIDE BAR BOLT OR
<br />EQUIVALENT WHEN NOT OTHERWISE LOCKED BY ELECTRIC POWER OPERATION.
<br />15) DOORS SHALL BE HUNG IN A TRUE VERTICAL PLANE WITHOUT WARP OR WIND AND
<br />BE FITTED SO AS TO HAVE 1/16" CLEARANCE ABOVE THRESHOLDS WHERE DOORS
<br />OPEN INTO ROOMS. OTHERWISE, CLEARANCE SHALL BE 3/8" ABOVE THE FLOORS. THE
<br />CLEARANCE AT THE HINGE JAMB AND AT THE HEAD SHALL BE 3/32".
<br />16) FINISH DEPTH OF BOTTOM RAIL AND INSTALLATION OF JAMB AND SADDLE SHALL
<br />ACCOMMODATE FINISH FLOOR SURFACES.
<br />SPECIFIC RESIDENTIAL BUILDING REQUIREMENTS:
<br />1) ENTRANCE DOORS TO DWELLINGS AND RENTAL UNITS SHALL BE EQUIPPED WITH A
<br />180 DEGREE WIDE ANGLE DOOR VIEWER OR VISION PANEL.
<br />2) N/A HIGH CONTRASTING "STREET ADRESS NUMBERS" ARE REQUIRED ON BOTH
<br />STREET AND ALLEY ACCESSES.
<br />3) N/A ILLUMINATION OF ONE FOOT CANDLE OF LIGHT SHALL BE PROVIDED FOR
<br />RESIDENTIAL BUILDING ACCESSORY AREAS AS FOLLOWS:
<br />1 EXITWAYS, AISLES, PASSAGEWAYS AND RECESSES WITHIN THE BUILDING COMPLEX
<br />DURING HOURS OF DARKNESS.
<br />2 OPEN PARKING LOTS, GARAGES AND CARPORTS DURING HOURS OF DARKNESS.
<br />4) N/A MULTIPLE UNIT COMPLEXES SHALL PLACE AN ILLUMINATED DIAGRAMMATIC
<br />REPRESENTATION OF THE COMPLEX AT THE MAIN ENTRANCE WHICH SHOWS
<br />LOCATION AND UNIT DESIGNATIONS WITHIN THE COMPLEX. INDIVIDUAL UNITS
<br />REQUIRE A 4" HEIGHT I.D. DESIGNATION.(SEE ELECTRICAL ENGINERING PLANS)
<br />ENERGY INSULATION REQUIREMENTS:
<br />1) ALL SWINGING DOORS AND WINDOWS OPENING TO THE EXTERIOR OR TO
<br />UNCONDITIONED AREAS SUCH AS GARAGES, SHALL BE FULLY WEATHER-STRIPPED,
<br />GASKETED OR OTHERWISE TREATED TO LIMIT INFILTRATION. ALL MANUFACTURED
<br />WINDOWS AND SLIDING GLASS DOORS SHALL MEET THE AIR INFILTRATION
<br />STANDARDS OF THE CURRENT AMERICAN NATIONAL STANDARDS INSTITUTE (A.N.S.I.) A
<br />134.1 TO 134.4 WHEN TESTED IN ACCORDANCE WITH ASTM E 283-73. WINDOWS AND
<br />DOORS SHALL BE CERTIFIED AND LABELED.
<br />1) ALL F.A.U. SYSTEMS EXHAUSTING AIR FROM THE BUILDING ENVELOPE TO THE
<br />OUTSIDE SHALL BE PROVIDED WITH BACKDRAFT DAMPERS.
<br />3) RE-CIRCULATING HOT WATER PIPING AND ALL PLUMBING PIPES SHALL BE FULLY
<br />INSULATED THROUGHOUT TO PROVIDE MAXIMUM LOSS OF NOT MORE THAN (50)
<br />BTU/HR. LINEAR FOOT FOR LARGER SIZES (T-20-1406C).
<br />4) ALL GARAGE WALLS AND CEILINGS TO LIVING AREAS SHALL BE TREATED AS
<br />EXTERIOR WALLS FOR INSULATION.
<br />INSULATED.
<br />6) ALL INSULATION SHALL BE APPROVED AND COMPLY WITH STATE STANDARDS.
<br />7) THE CONTRACTOR SHALL SIGN AND POST IN THE STRUCTURE AN INSULATION
<br />CERTIFICATION PRIOR TO THE FINISH INSPECTION. THE INSULATION CERTIFICATE
<br />SHALL MEET THE STATE OF CALIFORNIA STANDARDS AS SHOWN IN THE DESIGN
<br />MANUAL.
<br />8) INSULATION IN WALLS SHALL BE R-19 (VERIFY)
<br /> INSULATION IN CEILINGS/ROOFS SHALL BE R-30, U.N.O. (VERIFY)
<br /> INSULATION IN FLOORS SHALL BE R-30, U.N.O. (VERIFY)
<br />9) FIREPLACES SHALL MEET THE FOLLOWING REQUIREMENTS:
<br /> A. FIREBOX OPENINGS SHALL BE COVERED WITH A TIGHT FITTING
<br /> CLOSABLE METAL OR GLASS DOOR.
<br /> B. FIREBOX MUST HAVE AN OUTSIDE AIR INTAKE OF A MINIMUM AREA OF 6
<br /> SQUARE INCHES WITH AN OPENABLE DAMPER, WITH EXCEPTIONS FOR
<br /> CLIMATE ZONES 5,6,7,8,9,10,14 AND 15 IF THE FIREBOX IS NOT LOCATED
<br /> NEAR AN EXTERIOR WALL OR IN ANY CLIMATE ZONE IF THE FIREPLACE
<br /> WILL BE INSTALLED OVER CONCRETE SLAB FLOORING AWAY FROM AN
<br /> EXTERIOR WALL.
<br /> C. CONTINUOUS BURNING GAS PILOT LIGHTS ARE PROHIBITED.
<br /> D. FIREPLACES MUST HAVE A TIGHT FITTING FLUE DAMPER WITH READILY
<br /> ACCESSIBLE CONTROL.
<br /> E. PRE-FABRICATED FIREPLACES SHALL BE I.C.B.O. LISTED AND INSTALLED
<br /> PER MANUFACTURER'S SPECIFICATIONS.
<br />10) INSULATION BLANKETS WITH A MINIMUM RATING OF R-12 MUST BE INSTALLED ON
<br />WATER HEATERS.
<br />11) INSULATION WITH A MINIMUM RATING OF R-3 MUST BE INSTALLED ON THE FIRST 5
<br />FEET OF HOT WATER OUTLET PIPE IN UNCONDITIONED SPACE FOR A HOT WATER
<br />HEATER.
<br />12) GAS FIRED HOUSHOLD COOKING APPLIANCES, SHOWER HEADS AND FAUCETS
<br />SHALL COMPLY WITH THE APPLIANCE EFFICIENCY STANDARDS.
<br />13) FLUORESCENT LIGHT FIXTURES USED IN KITCHENS AND BATHROOMS SHALL HAVE
<br />AN EFFICIENCY OF NOT LESS THAN 40 LUMENS PER WATT.
<br />14) THE BUILDING DESIGN SHALL MEET THE REQUIREMENTS OF TITLE 24, PART 2,
<br />CHAPTER 2-53.
<br />15) GLAZING SHALL HAVE MAX. U-VALUE <0.75
<br />16)
<br />a) DOORS AND WINDOWS BETWEEN CONDITIONED AND UNCONDITIONED SPACES
<br />SHALL BE FULLY WEATHERSTRIPPED (THIS INCLUDES DOORS BETWEEN RESIDENCE
<br />AND GARAGE)
<br />b) THE FOLLOWING OPENINGS IN THE EXTERIOR ENVELOPE OF THE BUILDING SHALL
<br />BE CAULKED OR OTHERWISE SEALED TO LIMIT INFILTRATION:
<br /> i) EXTERIOR JOINTS AROUND WINDOW DOOR FRAMES, BETWEEN WALL SOLE
<br />PLATE AND FLOORS AND BETWEEN EXTERIOR PANELS;
<br /> ii) OPENINGS FOR PLUMBING, ELECTRICAL AND GAS LINES IN WALLS, CEILINGS
<br />AND FLOORS;
<br /> iii) OPENINGS IN THE ATTIC, SUCH AS THE POINT WHERE THE CEILINGS MEET
<br />FIREPLACES.
<br />a) EXHAUST FANS SHALL BE PROVIDED WITH BACKDRAFT DAMPERS OR AUTOMATIC
<br />DAMPERS
<br />b) DUCTS SHALL BE CONSTRUCTED, INSTALLED AND INSULATED ACCORDING TO
<br />CHAPTER 6 OF THE CALIFORNIA MECHANICAL CODE.
<br />c) THERMOSTATICALLY CONTROLLED HEATING AND COOLING SYSTEMS, EXCEPT
<br />ELECTRIC HEAT PUMPS, SHALL HAVE AN AUTOMATIC THERMOSTAT SET POINTS FOR
<br />AT LEAST TWO PERIODS WITHIN 24 HOURS.
<br />d) ALL HEATING, VENTILATING, AIR CONDITIONING (HVAC) EQUIPMENT SHALL BE
<br />CERTIFIED BY CALIFORNIA ENERGY COMMISSION.
<br />e) WATER HEATERS SHALL BE CERTIFIED BY THE CALIFORNIA ENERGY COMMISSION.
<br />f) WRAP STORAGE TYPE WATER HEATERS AND STORAGE AND BACK-UP TANKS FOR
<br />SOLAR WATER HEATER SYSTEMS WITH MINIMUM R-12 INSULATION EXTERIOR AND
<br />R-16 FOR INTERIOR
<br />g) INSULATE PIPING IN UNCONDITIONED SPACES LEADING TO AND FROM WATER
<br />HEATERS WITH MINIMUM R-4 INSULATION FOR A DISTANCE OF 5'-0" FROM THE
<br />WATER HEATER.
<br />h) GENERAL LIGHTING IN KITCHENS AND BATHROOMS SHALL HAVE AN EFFICIENCY OF
<br />AT LEAST 40 LUMENS PER WATT.
<br />17) INSULATION INSTALLER AND THE CONTRACTOR SHALL POST A SIGNED
<br />CERTIFICATE OF COMPLIANCE IN A CONSPICUOUS LOCATION IN THE BUILDING. THIS
<br />CERTIFICATE SHALL STATE THAT THE INSTALLATIONS AND MATERIALS CONFORM TO
<br />THE APPROPRAITE SECTIONS OF THE CALIFORNIA ADMINISTRATIVE CODE, TITLES 20
<br />AND 24 AND SHALL SPECIFY THE MANUFACTURER'S NAME AND MATERIAL
<br />IDENTIFICATION, THE INSTALLED R-VALUE, AND WHEN LOOSE FILL IS INSTALLED,
<br />SHALL STATE THE MINIMUM INSTALLED WEIGHT PER SQUARE FOOT CONSISTENT WITH
<br />THE MANUFACTURER'S LABELED DENSITY FOR THE DESIRED R-VAULE.
<br />18) MANUFACTURED DOORS AND WINDOWS SHALL BE CERTIFIED AND LABELED IN
<br />COMPLIANCE WITH THE APPROPRIATE INFILTRATION STANDARDS.
<br />19) REFER TO TITLE-24 SHEETS FOR ADDITIONAL INFORMATION.
<br />SITE WORK:
<br />CONTRACTOR SHALL REMOVE FROM SITE ALL DEBRIS AND VEGETATION AS NOTED
<br />OR REQUIRED. FOLLOWING MAJOR REMOVAL WORK, PROVIDE FINAL CLEARANCE AND
<br />CLEAN UP BY SCARIFYING ALL EARTH SURFACE ON ENTIRE SITE OR AS NOTED ON
<br />SITE PLAN. REMOVE REFUSE AND DEBRIS GATHERED BY PROCESS FROM SITE.
<br />WHERE EXCESSIVE DUST OCCURS DURING EARTH MOVING OPERATIONS, PROVIDE
<br />SUFFICIENT SPRINKLERING OF THE AREA.
<br />THE CONTRACTOR SHALL PROVIDE AND COORDINATE SITE PLUMBING, DRAINAGE,
<br />ELECTRICAL, TELEPHONE ETC., WORK TO PROVIDE A COMPLETE WORKING AND
<br />OPERATING SYSTEM.
<br />SEE SHOP DRAWINGS BY CONTRACTOR AND/OR SUB-CONTRACTOR AND
<br />SPECIFICATIONS FOR BUILDING WORK. CONTRACTOR WILL PROVIDE ALL CABINET
<br />SHOP DRAWINGS.
<br />THE CONTRACTOR IS RESPONSIBLE FOR PLACING THE BUILDING ACCURATELY ON THE
<br />BUILDING SITE.
<br />CONTRACTOR SHALL PERFORM ALL EXCAVATING REQUIRED AS SHOWN ON THE
<br />DRAWINGS OR OTHERWISE SPECIFIED BY THE STRUCTURAL DRAWINGS AND/OR THE
<br />SOILS REPORT. EXCAVATIONS SHALL BE KEPT FREE OF STANDING WATER AND SHALL
<br />BE LEVEL AS REQUIRED.
<br />ALL FOOTINGS SHALL BE BELOW UNDISTURBED NATURAL SOIL OR APPROVED
<br />COMPACTED FILL.
<br />EXCAVATIONS, FILLING, BACKFILLING AND GRADING:
<br />NOTE: STRUCTURAL AND GEOLOGICAL NOTES AND DRAWINGS SHALL SUPERSED THE
<br />FOLLOWING.
<br />EXCAVATIONS SHALL BE MADE TO THE DIMENSIONS AND ELEVATIONS INDICATED ON
<br />THE DRAWINGS OR AS REQUIRED FOR THE BUILDING.
<br />IF UNSUITABLE BEARING IS ENCOUNTERED AT THE ELEVATIONS INDICATED,
<br />EXCAVATION SHALL BE CARRIED TO SUCH GREATER DEPTHS AS DIRECTED BY THE
<br />SOILS ENGINEER AND/OR THE STRUCTURAL ENGINEER, THE CONTRACT PRICE SHALL
<br />BE ADJUSTED ACCORDINGLY. EXCAVATIONS SHALL EXTEND A SUFFICIENT DISTANCE
<br />FROM WALLS AND FOOTINGS TO ALLOW FOR FORMS, INSULATION, WATERPROOFING,
<br />INSTALLATION OF SERVICES AND FOR INSPECTION.
<br />BACKFILL SHALL BE PLACED AFTER FOUNDATIONS, WALLS AND SLABS HAVE ATTAINED
<br />SUFFICIENT STRENGTH TO SUPPORT LATERAL SOIL PRESSURES.
<br />CONTRACTOR SHALL REFER TO STRUCTURAL DRAWINGS AND SOILS REPORT FOR
<br />DEPTH OF FOOTINGS AND OTHER PERTINENT INFORMATION.
<br />CONTRACTOR SHALL PERFORM REQUIREMENTS FOR EXCAVATIONS CONTAINED IN
<br />THE STATE CONSTRUCTION SAFETY ORDERS ENFORCED BY THE STATE DIVISION OF
<br />INDUSTRIAL SAFETY.
<br />APPROVAL FROM DEPARTMENT OF GENERAL SERVICES AND PUBLIC WORKS SHALL BE
<br />OBTAINED AS REQUIRED FOR EXCAVATIONS THAT WOULD REMOVE LATERAL
<br />SUPPORT OF THE PUBLIC WAY.
<br />SHORING, UNDERPINNING, AND/OR SLOT CUTTING OR OTHER METHODS SHALL BE
<br />PERFORMED UNDER THE INSPECTION AND APPROVAL OF THE FOUNDATION ENGINEER
<br />AS REQUIRED.
<br />CITY GRADING INSPECTOR SHALL INSPECT AND APPROVE BOTTOM OF EXCAVATIONS
<br />AS REQUIRED PRIOR TO BACKFILL INSTALLATION.
<br />CONTRACTOR SHALL GIVE NOTICE IN A TIMELY MANNER TO ADJACENT PROPERTY
<br />OWNERS REGARDING PROTECTION OF THEIR PROPERTY AND STRUCTURES AS
<br />NECESSARY DUE TO EXCAVATION AND CONSTRUCTION.
<br />29) UTILITIES: CONTRACTORS TO VERIFY WITH WATER, GAS, ELECTRIC, TELEPHONE,
<br />AND SEWER COMPANIES FOR LOCATION OF UTILITIES AND PROVIDE IN BID COSTS
<br />FOR INSTALLATION AND CONNECTION FOR WORKING ORDER. CONTRACTOR TO
<br />PROVIDE IN BID CONNECTION FEES FOR ALL UTILITIES.
<br />30) CONTRACTOR SHALL PROVIDE TEMPORARY SANITARY FACILITIES DURING
<br />CONSTRUCTION.
<br />31) T.V. ANTENNA CROSS ARMS OR ANY OTHER SIMILAR OBSTRUCTIONS SHALL BE
<br />LOCATED 7'-0" MINIMUM ABOVE THE ROOF SURFACE.
<br />32) CONDUCT ALL ROOF DRAINAGE TO STORM DRAIN OR EQUIVALENT MEANS IN A
<br />NON-EROSIVE MANNER.
<br />33) NO TRENCHES OR EXCAVATIONS 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON
<br />IS REQUIRED TO DESCEND SHALL BE PERMITTED UNLESS THE NECESSARY PERMIT
<br />FROM EACH STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY IS FIRST
<br />OBTAINED.
<br />34) GLASS DOORS, SIDELIGHTS WITHIN 40" OF LOCK, AND ALL GLAZED OPENINGS
<br />WITHIN 18" OF ADJACENT FLOOR SHALL BE APPROVED FOR IMPACT HAZARD.
<br />(TEMPERED GLASS)
<br />35) ALL GLAZING SHALL COMPLY WITH CITY REQUIREMENTS OF THE CURRENT
<br />UNIFORM BUILDING CODE (UBC).
<br />36) ON ALL DRAWINGS, DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE.
<br />37) ALL WATER HEATERS SHALL BE STRAPPED FOR LATERAL SUPPORT.
<br />38) SHOWER WALLS OVER BATHTUBS SHALL BE OF APPROVED NON-ABSORBENT
<br />WATERPROOF MATERIAL TO A HEIGHT OF 5'-0" MINIMUM ABOVE THE TUB UNLESS
<br />NOTED OTHERWISE. WAINSCOT SHALL ALSO EXTEND FULL HEIGHT AND BEYOND THE
<br />FACE OF THE TUB OR SHOWER PAN. SHOWER WALLS AND SHOWER DOORS SHALL BE
<br />6'-0" ABOVE FLOOR.
<br />39) ALL SHOWER AND SHOWER-TUB ENCLOSURES SHALL BE OF SHATTER-PROOF
<br />GLASS. (TEMPERED GLASS) "FRAMELESS" U.N.O
<br />40) ACCESS PANEL: PROVIDE A MINIMUM 12"X12" AT EACH TUB. SEE DRAWINGS FOR
<br />ANY SPECIAL ACCESS PANELS FOR ACCESS TO "WHIRLPOOL" TYPE TUBS.
<br />41) ALL TILED BATHROOM FLOORS SHALL HAVE ONE LAYER OF 30# FELT (BUILDING
<br />PAPER) SET IN WATERPROOF CEMENT AND TURNED 2" UP THE WALLS OR 2" ABOVE
<br />TILE WAINSCOT .
<br />42) PROVIDE MECHANICAL VENTILATION SYSTEM IN INTERIOR BATHROOMS AND
<br />LAUNDRY ROOM TO FURNISH FIVE AIR CHANGES PER HOUR DIRECT TO OUTSIDE.
<br />43) INSIDE FINISHED DIMENSIONS OF SHOWER AND/OR TOILET COMPARTMENT MUST
<br />BE 32" MINIMUM WIDTH AND 24" CLEAR IN FRONT OF TOILET.
<br />44) PLUMBING CLEANOUTS SHALL NOT BE VISIBLE FROM LIVING, DINING AND HALLS
<br />EXCEPT AS NOTED ON PLANS.
<br />45) ALL PORTIONS OF DRAIN PIPING SHALL BE CAST IRON UNLESS NOTED OTHERWISE.
<br />46) PLASTERED SURFACE ON WALLS, CEILINGS AND ROOF SOFFITS EXPOSED TO THE
<br />WEATHER SHALL HAVE EXTERIOR LATH AND PLASTER CONFORMING TO SECTION 4708
<br />& 4706 OF THE UBC RESPECTIVELY.
<br />47) INSPECTION IS REQUIRED FOR ALL INTERIOR AND EXTERIOR IN-PLACE LATH
<br />AND/OR WALLBOARD BEFORE ANY PLASTERING IS APPLIED OR ANY JOINTS AND
<br />FASTENERS HAVE BEEN TAPED AND FINISHED. INTERIOR DRYWALL SHALL BE 5/8"
<br />MINIMUM AND SCREWED, NOT NAILED. INSTALL PER UBC REQUIREMENTS FOR
<br />FASTENER SIZE, ETC.
<br />48) CLOTHES DRYER SHALL BE EXHAUSTED TO THE OUTSIDE. CLOTHES DRYER
<br />MOISTURE EXHAUST DUCT IS LIMITED TO 14 FEET WITH TWO ELBOWS FROM THE
<br />CLOTHES DRYER TO POINT OF TERMINATION. REDUCE THIS LENGTH BY 2' FOR EVERY
<br />ELBOW IN EXCESS OF TWO.
<br />49) MINERAL FIBER INSULATION WILL BE INSTALLED IN JOIST SPACES WHENEVER A
<br />PLUMBING PIPE OR DUCT PENETRATES A FLOOR-CEILING ASSEMBLY OR WHERE SUCH
<br />UNIT PASSES THROUGH THE PLANE OF THE FLOOR-CEILING ASSEMBLY FROM WITHIN
<br />A WALL. THE INSULATION SHALL BE INSTALLED TO A POINT OF 12" BEYOND THE PIPE
<br />OR DUCT.
<br />N/A 50) THE GARAGE SHALL BE MECHANICALLY VENTILATED IN ACCORDANCE WITH
<br />SECTION 705, UBC AND AS DIRECTED. (SEE MECHANICAL PLANS)
<br />51) ALL INTERIOR FINISH MATERIALS SHALL MEET CLASS III FLAME SPREAD
<br />CLASSIFICATION.
<br />52) ALL NEW WORK SHALL CONFORM WITH THE MINIMUM STANDARDS OF THE
<br />GOVERNMENTAL AUTHORITIES HAVING JURISDICTION OVER THIS PROJECT AND THE
<br />LATEST EDITION OF THE UNIFORM BUILDING CODE.
<br />53) PROVIDE ONE HOUR FIRE RESISTANT PROTECTION UNDER STAIRS AND WALLS
<br />WHEN AREA UNDER STAIRS IS ENCLOSED, AT PARTY WALLS, AND ALL WALL/FLOOR
<br />ASSEMBLIES COMMON TO GARAGE AREA. PROVIDE 5/8" TYPE "X" GYPSUM BOARD
<br />THROUGHOUT.
<br />N/A 54) PROVIDE A 22"X30" (MINIMUM) ATTIC ACCESS DOOR WITH A MINIMUM 30"
<br />CLEAR HEADROOM ABOVE OPENING. (U.N.O.)
<br />55) PROVIDE 24 GAUGE GALVANIZED IRON (CORROSION RESISTANT) WEEP SCREED AT
<br />MUDSILLS FOR ALL EXTERIOR STUCCO WALLS.
<br />56) PROVIDE A 24" WIDE X 18" HIGH CRAWL-HOLE OR DOOR TO UNDERFLOOR AREA,
<br />NOT MORE THAN 20 FEET FROM PLUMBING CLEANOUTS OR FORCED AIR UNIT. PIPES,
<br />DUCTS AND OTHER NON-STRUCTURAL CONSTRUCTION COMPONENTS SHALL NOT
<br />INTERFERE WITH ACCESSIBILITY.
<br />57) PRIOR TO INSTALLATION OF ANY STAIRS, THE CONTRACTOR SHALL VERIFY THE
<br />RISE, RUN, HEADROOM AND NUMBER OF TREADS AND RISERS, AND SHALL NOTIFY THE
<br />DESIGNER OF ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS.
<br />58) BELOW GRADE WATERPROOFING AT BLOCK WALLS, FOOTINGS AND AS
<br />REQUIRED SHALL BE "THOROSEAL" OR "PARASEAL" SYSTEMS AND INSTALLED PER
<br />MANUFACTURER'S SPECIFICATIONS. INSTALLATIONS SHALL BE STRICTLY ADHERED
<br />TO.
<br />59) 1 ½" LIGHT WEIGHT CONCRETE OVER 15# FELT OVER PLYWOOD SUBFLOOR.
<br />60) APPROVED SPARK ARRESTOR FOR CHIMNEYS, STOVE, BBQ AND OTHER
<br />APPLIANCES USING FUEL SHALL BE INSTALLED.
<br />61) CONSTRUCTION, SCAFFOLDING, DEMOLITION ETC. EXCEEDING 3 STORIES IN
<br />HEIGHT OR 36 FEET IN HEIGHT SHALL REQUIRE A PERMIT FROM THE DIVISION OF
<br />INDUSTRIAL SAFETY PRIOR TO OBTAINING THE BUILDING PERMIT.
<br />61) ALL SUBFLOOR VENTING SHALL BE WRAPPED WITH "JIFFY SEAL" AS IF IT WERE A
<br />WINDOW INSTALLATION.
<br />MECHANICAL, SHEET METAL
<br />1) ALL SHEET METAL WORK SHALL BE IN ACCORDANCE WITH SMACNA MANUAL
<br />STANDARDS AND ALL LOCAL CODES.
<br />2) CONTRACTOR SHALL PROVIDE GAS-FIRED FURNACE(S) AND/OR FORCED AIR
<br />HEATING SYSTEM AS INDICATED ON PLANS. FURNACES, DUCTS AND REGISTERS
<br />SHALL BE SIZED AND INSTALLED TO PROVIDE ADEQUATE AIR, TEMPERATURE,
<br />VOLUME, DISTRIBUTION AND CIRCULATION AT MINIMUM NOISE LEVELS. SYSTEM
<br />EQUIPMENT AND LAYOUT SHALL BE CONFIRMED WITH OWNER AND DESIGNER PRIOR
<br />TO ORDERING AND INSTALLATION.
<br />3) DUCT WORK CONSTRUCTION: ALL DUCT WORK AND PLENUM TO BE MADE OF
<br />GALVANIZED SHEET METAL IN ACCORDANCE WITH THE LATEST SMACNA STANDARDS
<br />AND APPLICABLE CODES. CONTRACTOR SHALL SIZE DUCT WORK FOR S.P. NOT TO
<br />EXCEED 0.1" PER 100' LENGTH FOR A GIVEN CFM. DUCTS MAY BE RECTANGULAR OR
<br />ROUND.
<br />4) DUCT INSULATION: INSULATE ALL SUPPLY AND RETURN AIR DUCT WORK AND
<br />PLENUM WITH MINIMUM 2" THICK FIBERGLASS INSULATION WRAPPED AROUND WITH 2"
<br />OVERLAP AND WIRED ON WITH #18 GALVANIZED WIRE @ 12" O.C.
<br />5) PROVIDE GALVANIC OR BITUMINOUS INSULATION AS APPROVED BY DESIGNER
<br />BETWEEN DISSIMILAR METALS.
|