My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1900 E Deere Ave - Plan
PBA
>
Building
>
ProjectDox
>
D
>
Deere Ave
>
1900 E Deere Ave
>
1900 E Deere Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2026 5:00:13 AM
Creation date
3/11/2026 5:00:06 AM
Metadata
Fields
Template:
Plan
Permit Number
20187494
101125872
Full Address
1900 E Deere Ave
Street Number
1900
Street Direction
E
Street Name
Deere
Street Suffix
Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br />1.SEE EV-04 FOR SINGLE LINE DIAGRAM AND FEEDER <br />SCHEDULE. <br />J: <br />\ <br />2 <br />0 <br />2 <br />4 <br />b <br />\ <br />2 <br />0 <br />2 <br />4 <br />- <br />0 <br />0 <br />6 <br />7 <br />. <br />1 <br />1 <br />- <br />r <br />e <br />d <br />_ <br />b <br />u <br />l <br />l <br />_ <br />e <br />l <br />e <br />c <br />t <br />r <br />a <br />d <br />a <br />_ <br />s <br />a <br />n <br />t <br />a <br />_ <br />a <br />n <br />a <br />\ <br />1 <br />0 <br />- <br />d <br />e <br />s <br />i <br />g <br />n <br />\ <br />D <br />r <br />a <br />w <br />i <br />n <br />g <br />s <br />\ <br />w <br />o <br />r <br />k <br />i <br />n <br />g <br />d <br />o <br />c <br />u <br />m <br />e <br />n <br />t <br />s <br />\ <br />S <br />H <br />E <br />E <br />T <br />S <br />\ <br />L <br />A <br /> <br />M <br />I <br />R <br />A <br />D <br />A <br />\ <br />E <br />L <br />E <br />C <br />T <br />R <br />I <br />C <br />A <br />L <br />\ <br />E <br />V <br />- <br />0 <br />5 <br />. <br />d <br />w <br />g <br /> <br /> <br />2 <br />0 <br />2 <br />6 <br />- <br />0 <br />1 <br />- <br />1 <br />4 <br />Project Title: <br />Drawing Title: <br />RevisionDateNo. <br />Date: <br />Drawn: <br />Checked: <br />Job No: <br />Scale: <br />Drawing No: <br />SHT:OF <br />BURNS ENGINEERING, INC. | 310-439-5643 <br />300 NORTH CONTINENTAL BLVD SUITE 540 <br />EL SEGUNDO, CA 90245 <br />10 <br />RED BULL <br />ELECTRADA <br />EV CHARGING <br />SANTA ANA <br />1900 EAST DEERE AVE, SANTA ANA, CA92705 <br />ADDRESS: <br />1 06/24/2025 CD30 <br />2 07/02/2025 CD90 <br />3 07/15/2025 ISSUE FOR PERMIT <br />4 01/14/2026 PLAN CHECK COMMENTS <br />PANEL SCHEDULE <br />1/14/2026 <br />AS NOTED <br />CS <br />IB <br />2024.0067.11 <br />EV-05 <br />EV <br />- <br />0 <br />5 <br />. <br />D <br />W <br />G <br />5 <br />SWITCHBOARD: EVDP-1 <br />VOLTAGE: 208Y/120V, 3Φ, 4W PHASE BUS RATING: 250A MOUNTING: SURFACE <br />MAIN TYPE: MCB NEUTRAL BUS RATING: 250A ENCLOSURE RATING: NEMA 1 <br />MAIN RATING: 250A GROUND BUS RATING: 250A LOCATION: <br />AIC RATING: 65kA SUB-FEED LUGS: NO FEED-THRU LUGS: NO <br />CKT NO. <br />BREAKER WIRE <br />DESCRIPTION <br />CONNECTED KVA PER PHASE <br />DESCRIPTION <br />WIRE BREAKER <br />CKT NO. <br />POLE AMPS PH NEUT GND A A B B C C PH NEUT GND POLE AMPS <br />1 2 60 SEE SINGLE LINE EVSE-1 5.0 -SPACE ---1 20 2 <br />3 ------5.0 -SPACE ---1 20 4 <br />5 2 60 SEE SINGLE LINE EVSE-2 5.0 -SPACE ---1 20 6 <br />7 ------5.0 -SPACE ---1 20 8 <br />9 2 60 SEE SINGLE LINE EVSE-3 5.0 -SPACE ---1 20 10 <br />11 ------5.0 -SPACE ---1 20 12 <br />13 2 60 SEE SINGLE LINE EVSE-4 5.0 -SPACE ---1 20 14 <br />15 ------5.0 -SPACE ---1 20 16 <br />17 2 60 SEE SINGLE LINE EVSE-5 5.0 -SPACE ---1 20 18 <br />19 ------5.0 -SPACE ---1 20 20 <br />21 2 60 SEE SINGLE LINE EVSE-6 5.0 -SPACE ---1 20 22 <br />23 ------5.0 -SPACE ---1 20 24 <br />25 1 20 ---SPACE -0.2 MNB-1 SEE SINGLE LINE 1 30 26 <br />27 1 20 ---SPACE --SPACE ---1 20 28 <br />29 1 20 -SPACE --SERVICE RECEPTACLE #12 #12 #12 1 20 30 <br />31 1 20 ---SPACE --SPACE ---1 20 32 <br />33 1 20 -SPACE --SPACE ---1 20 34 <br />35 1 20 ---SPACE --SPACE ---1 20 36 <br />37 1 20 -SPACE --SPACE ---1 20 38 <br />39 1 20 ---SPACE --SPACE ---1 20 40 <br />41 1 20 ---SPACE --SPACE ---1 20 42 <br />TOTAL CONNECTED KVA PER PHASE:20.1 20.0 20.0 TOTAL CONNECTED KVA:60.1 <br />TOTAL ESTIMATED DEMAND CURRENT PER PHASE:167.9 166.4 166.4 TOTAL CONNECTED CURRENT:166.8 <br />TOTAL ESTIMATED DEMAND KVA:75.6 <br />TOTAL ESTIMATED DEMAND CURRENT:209.9 <br />LOAD CALCULATIONS - MAIN SWITCHGEAR <br /> EQUIPMENT PEAK DEMAND (kW)CURRENT (A) <br />METER# V349N-006608 26kW (BETWEEN 02/24-04/25)31A <br />NEW EVDP-1 DEMAND 75.7kW 209.9 A <br />TOTAL DEMAND 101.7kW 240.0 A <br />3000A MAIN SWITCHGEAR CAPACITY 2493.0 kW 3000 A <br />LOAD CALCULATION CONFIRMS THAT THE EXISTING 3000A METER SECTION HAS <br />SUFFICIENT CAPACITY TO ACCOMMODATE THE NEW LOAD
The URL can be used to link to this page
Your browser does not support the video tag.