SINGLE LINE DIAGRAM LEGEND:
<br />CONDUIT TURNING DOWN
<br />CONDUIT TURNING UP
<br />ELECTRICAL LEGEND:
<br />20A, 125V GFCI DUPLEX RECEPTACLE
<br />NEW WORK KEY NOTE#
<br />ANNOTATION
<br />100 AF / 60 AT
<br />100/90
<br />208/120V
<br />480V
<br />500KVAY
<br />GROUND CONNECTION
<br />FUSED SWITCH
<br /><SWITCH AMPS>/<FUSE AMPS>/<POLES>
<br />POWER TRANSFORMER
<br />VOLTAGES, WINDINGS AND SIZE AS INDICATED
<br />UNFUSED SWITCH
<br /><SWITCH AMPS>/<POLES>
<br />CIRCUIT BREAKER - MOLDED CASE TYPE
<br /><AMP FRAME>/<AMP TRIP>
<br />CIRCUIT BREAKER - DRAW-OUT TYPE
<br /><FRAME AMPS>/<TRIP AMPS>
<br />CURRENT TRANSFORMER
<br />NUMBER AND RATIO AS INDICATED
<br />XXX/5
<br />3
<br />TRANSFORMER
<br />UNFUSED DISCONNECT SWITCH, MOUNT 48" AFF
<br /><SWITCH AMPS>/<POLES>, VOLTAGE RATING AS REQUIRED
<br />FUSED DISCONNECT SWITCH
<br /><SWITCH AMPS>/<FUSE AMPS>/<POLES>, VOLTAGE RATING AS REQUIRED
<br />SURFACE MOUNTED PANELBOARD
<br />MOUNT 48" AFF
<br />T
<br />HANDHOLEH
<br />FEEDER TAG
<br />POTENTIAL TRANSFORMER
<br />MV CIRCUIT BREAKER
<br />SURGE ARRESTER
<br />SPD SURGE PROTECTIVE DEVICE
<br />EM#ELECTRICAL MANHOLE
<br />G GROUND BUS
<br />N NEUTRAL BUS
<br />Y
<br />DELTA
<br />GROUNDED WYE
<br />GROUND LEVEL ELECTRICAL CONDUIT
<br />COMMUNICATION CONDUIT
<br />ELECTRICAL ENCLOSURE
<br />VOLTAGE
<br />CLASS
<br />DUTY CLASS
<br />MCOV
<br />UNDERGROUND CONDUIT DUCTBANK
<br />GROUND ROD WITH TEST WELL
<br />G
<br />ELECTRICAL CONNECTION
<br />BEFORE YOU DIG
<br />CALL TOLL FREE
<br />IN CALIFORNIA
<br />811
<br />TWO DAYS BEFORE YOU DIG
<br />UNDERGROUND ELECTRICAL CONDUIT
<br />ELECTRICAL ABBREVIATIONS:
<br />LIGHT FIXTURE. SEE LIGHTING FIXTURE SCHEDULE.
<br />A = DESIGNATIONA
<br />A, AMP AMPERE
<br />AERS ARC ENERGY REDUCTION SYSTEM
<br />AF AMP FRAME
<br />AFF ABOVE FINISHED FLOOR
<br />AG ABOVE GRADE
<br />AIC AMPERE INTERRUPTING CAPACITY
<br />APPROX APPROXIMATE(LY)
<br />AT AMP TRIP
<br />AL ALUMINIUM
<br />AWG AMERICAN WIRE GAUGE
<br />BG BELOW GRADE
<br />BKR BREAKER
<br />C CONDUIT
<br />CB CIRCUIT BREAKER
<br />CKT CIRCUIT
<br />CMS CABLE MANAGEMENT SYSTEM
<br />CU COPPER
<br />CT CURRENT TRANSFORMER
<br />DAS DATA ACQUISITION SYSTEM
<br />DS DISCONNECT SWITCH
<br />DWG DRAWING
<br />(E)EXISTING
<br />EC ELECTRICAL CONTRACTOR
<br />ELEC ELECTRICAL
<br />EMT ELECTRICAL METALLIC TUBING
<br />EM EMERGENCY
<br />ENC ENCLOSURE, ENCLOSED
<br />(ER)EXISTING TO BE RELOCATED
<br />EV ELECTRIC VEHICLE
<br />EVCS ELECTRIC VEHICLE CHARGING STATION
<br />EVDP ELECTRIC VEHICLE DISTRIBUTION
<br />PANEL
<br />EVSE ELECTRIC VEHICLE SUPPLY EQUIPMENT
<br />F FUSE
<br />FMC FLEXIBLE METAL CONDUIT
<br />FT FEET, FOOT
<br />G, GND GROUND OR GROUNDING
<br />GA GALVANIZED
<br />GFCI GROUND FAULT CIRCUIT INTERRUPTER
<br />GFP GROUND FAULT PROTECTION
<br />IN INCHES
<br />J, JB JUNCTION BOX
<br />KCMIL THOUSAND CIRCULAR MILS
<br />KV KILOVOLT
<br />KVA KILOVOLT-AMPERE
<br />KW KILOWATT
<br />LSIG LONG TIME, SHORT TIME,
<br />INSTANTANEOUS, GFP
<br />MAX MAXIMUM
<br />MBJ MAIN BONDING JUMPER
<br />MC METAL CLAD
<br />MCB MAIN CIRCUIT BREAKER
<br />MDB MINI-DAUGHTER BOX
<br />MDP MAIN DISTRIBUTION PANEL
<br />MFR MANUFACTURER
<br />MIN MINIMUM
<br />MLO MAIN LUGS ONLY
<br />MNB MINI-NETWORK BOX
<br />MOV METAL-OXIDE VARISTOR
<br />MTG MOUNTING
<br />N, NEUT NEUTRAL
<br />(N)NEW
<br />NEC NATIONAL ELECTRICAL CODE
<br />NEMA NATIONAL ELECTRICAL
<br />MANUFACTURERS ASSOCIATION
<br />NGOM NET GENERATION OUTPUT METER
<br />NTS NOT TO SCALE
<br />P POLE
<br />PG&E PACIFIC GAS & ELECTRIC
<br />PH PHASE
<br />PNL PANEL OR PANELBOARD
<br />PT POTENTIAL TRANSFORMER
<br />PVC POLYVINYL CHLORIDE
<br />PWR POWER
<br />(R)REMOVE
<br />(RE)RELOCATED EXISTING EQUIPMENT
<br />RELT REDUCED ENERGY LET THROUGH
<br />REQ'D REQUIRED
<br />RGS RIGID GALVANIZED STEEL
<br />RMC RIGID METAL CONDUIT
<br />SCE SOUTHERN CALIFORNIA EDISON
<br />SP SPARE
<br />SPD SURGE PROTECTIVE DEVICE
<br />ST SHUNT TRIP
<br />STC STANDARD TEST CONDITIONS
<br />SW SWITCH
<br />SWBD SWITCHBOARD
<br />SWGR SWITCHGEAR
<br />T TRANSFORMER
<br />TB TERMINAL BLOCK
<br />TBD TO BE DETERMINED
<br />TYP TYPICAL
<br />UON UNLESS OTHERWISE NOTED
<br />UL UNDERWRITERS LABORATORIES
<br />V VOLT
<br />W WIRE, WATT
<br />W/WITH
<br />WP WEATHERPROOF (3R RATING, MINIMUM)
<br />WS WEATHER STATION
<br />XFMR TRANSFORMER
<br />XHHW XLPE HIGH HEAT-RESISTANT
<br />WATER-RESISTANT
<br />XLPE CROSS-LINKED POLYETHYLENE
<br />%PERCENT
<br />Δ DELTA
<br />Y WYE
<br />UNDERGROUND EXISTING CONDUIT
<br />UNDERGROUND WATER LINE
<br />FENCE LINE
<br />DATA CONNECTION - ONE (1) CAT6A IN 3/4" EMT TO
<br />NEAREST MDB OR MNB
<br />OVERHEAD ELECTRICAL CONDUIT
<br />GENERAL NOTES
<br />1.THESE DRAWINGS ARE PRESENTED TO THE ELECTRICAL CONTRACTOR WITH THE
<br />UNDERSTANDING THAT THE ELECTRICAL CONTRACTOR IS LICENSED AND EXPERIENCED TO
<br />PROVIDE SERVICES AND IS COMPETENT IN THE PREPARATION OF CONTRACT BID PRICES ON
<br />THE BASIS OF INFORMATION SUCH AS IS CONTAINED IN THESE DOCUMENTS. IT IS THE INTENT
<br />OF THE DRAWINGS AND SPECIFICATIONS TO CALL FOR FINISHED WORK, TESTED AND READY
<br />FOR OPERATION AND IN COMPLETE CONFORMANCE WITH ALL APPLICABLE CODES, RULES, AND
<br />REGULATIONS. MINOR ITEMS NOT USUALLY SHOWN OR SPECIFIED, BUT MANIFESTLY
<br />NECESSARY FOR THE PROPER INSTALLATION AND OPERATION OF THE VARIOUS SYSTEMS,
<br />SHALL BE INCLUDED IN THE WORK AND IN THE PROPOSAL THE SAME AS IF SPECIFIED OR
<br />SHOWN ON THE DRAWINGS. IF ANY DEPARTURES FROM THE DRAWINGS ARE DEEMED
<br />NECESSARY, DETAILS OF SUCH DEPARTURES AND THE REASONS THEREFORE SHALL BE
<br />SUBMITTED TO THE ENGINEER FOR APPROVAL. NO DEPARTURES SHALL BE MADE WITHOUT
<br />PRIOR APPROVAL OF THE ENGINEER AND OWNER.
<br />2.DEFINITION: UNLESS OTHERWISE NOTED, ALL WORK SPECIFIED HEREIN OR NOTED ON
<br />DRAWINGS, SHALL BE BY THE ELECTRICAL CONTRACTOR. ALL REFERENCES TO
<br />"CONTRACTOR" OR "THIS CONTRACTOR" ON DRAWINGS OR SPECIFICATIONS ARE ADDRESSED
<br />TO THE ELECTRICAL CONTRACTOR. THE TERM "PROVIDE" WHENEVER ENCOUNTERED ON
<br />DRAWINGS OR IN THESE SPECIFICATIONS, SHALL MEAN "FURNISH AND INSTALL."
<br />3.THE ELECTRICAL CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL DIMENSIONS IN THE
<br />FIELD, AND SHALL ADVISE THE ENGINEER AND THE OWNER OF ANY DISCREPANCIES BEFORE
<br />PERFORMING THE WORK.
<br />4.DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND
<br />WORK. CONDUIT ROUTING IS SHOWN DIAGRAMMATICALLY AND DOES NOT SHOW ALL BENDS,
<br />OFFSETS, DROPS AND RISES OF RUNS. THE CONTRACTOR SHALL ALLOW FOR ROUTING OF
<br />CONDUIT TO AVOID OBSTRUCTIONS. COORDINATE WITH OTHER TRADES, AS REQUIRED. THE
<br />EXACT LOCATIONS OF DEVICES AND EQUIPMENT ARE SUBJECT TO THE APPROVAL OF THE
<br />OWNER.
<br />5.CUT CONDUIT ENDS SQUARE. REAM SMOOTH. PAINT MALE THREAD OF FIELD THREADED
<br />RACEWAYS WITH GRAPHITE BASE PIPE COMPOUND. DRAW UP TIGHT WITH RACEWAY
<br />COUPLING.
<br />6.LEAVE WIRES WITH SUFFICIENT SLACK TO PERMIT MAKING FINAL CONNECTIONS. RACEWAYS
<br />OVER 10' LONG IN WHICH WIRING IS NOT INSTALLED: FURNISH NYLON PULL STRING. FOR ANY
<br />RACEWAY OVER 25' PROVIDE PULL STRING WITH CONDUIT MEASURING TAPE AND INDICATE
<br />DESIGNATION OF THE RACEWAY ON EACH END.
<br />7.COVERS OF JUNCTION AND PULLBOXES SHALL BE ACCESSIBLE.
<br />8.PROVIDE PULLBOXES WHERE INDICATED, REQUIRED BY CODE AND WHEREVER NECESSARY TO
<br />FACILITATE PULLING OF WIRE.
<br />9.PULL NO THERMOPLASTIC WIRES AT AMBIENT TEMPERATURES LOWER THAN 32°F (0°C).
<br />PROVIDE CABLE SUPPORTS FOR WIRE IN RISER CONDUITS AS REQUIRED BY CODE.
<br />10.THE CONTRACTOR IS RESPONSIBLE FOR REPORTING INCONSISTENCIES TO THE ENGINEER IN
<br />FORM OF "RFI" REQUEST FOR INFORMATION BEFORE ANY INACCURATE WORK IS EXECUTED.
<br />11.IN THE EVENT OF CONFLICT BETWEEN THE CONTRACT DRAWINGS AND THE SPECIFICATIONS,
<br />THE MOST RIGID REQUIREMENTS SHALL GOVERN.
<br />12.CONTRACTOR/INSTALLER SHALL PROVIDE ALL MATERIALS, LABOR, EQUIPMENT AND SERVICES
<br />AND PERFORM ALL OPERATIONS IN CONNECTION WITH THE ELECTRICAL WORK.
<br />13.CONTRACTOR/INSTALLER SHALL COMPLY WITH THE REQUIREMENTS OF THE AUTHORITY
<br />HAVING JURISDICTION, INCLUDING THE NATIONAL ELECTRICAL CODE (NEC), NEMA, ANSI, AND
<br />IEEE STANDARDS THROUGHOUT THE PROJECT. ALL WORK SHALL COMPLY WITH ALL LOCAL,
<br />STATE AND FEDERAL CODES AND THE REQUIREMENTS OF ANY OTHER AUTHORITIES HAVING
<br />JURISDICTION. CONTRACTOR SHALL SUBMIT DOCUMENTATION THAT ALL NEW WORK PROVIDED
<br />UNDER THIS PROJECT WAS INSPECTED AND APPROVED BY THE AHJ TO BE IN COMPLIANCE
<br />WITH THE LATEST APPROVED VERSION OF THE NEC (NFPA 70).
<br />14.THE CONTRACTOR/INSTALLER SHALL VERIFY ALL EXISTING INFORMATION SHOWN
<br />(DIMENSIONS, OBSTRUCTIONS, ETC ) AND NOTIFY THE ENGINEER OF ANY DISCREPANCIES
<br />PRIOR TO INSTALLATION.
<br />15.CONTRACTOR/INSTALLER SHALL BE RESPONSIBLE FOR MAINTAINING A RECORD SET OF
<br />INSTALLATION PRINTS. THE CONTRACTOR SHALL NEATLY AND CLEARLY RECORD ALL
<br />DEVIATIONS FROM THE CONTRACT DOCUMENTS. AT THE COMPLETION OF WORK, THE
<br />CONTRACTOR SHALL RETURN MARKED PRINTS WITH INFORMATION MAINTAINED DURING
<br />CONSTRUCTION TO THE ENGINEER.
<br />16.CONTRACTOR/INSTALLER SHALL RETAIN ALL TESTING REPORTS PERFORMED AND PROVIDE TO
<br />OWNER AT COMPLETION OF WORK
<br />17.CONTRACTOR/INSTALLER SHALL AT THE COMPLETION OF THE WORK, SECURE CERTIFICATES
<br />OF APPROVAL FROM THE VARIOUS AUTHORITIES HAVING JURISDICTION AND DELIVER TO
<br />OWNER.
<br />18.EXISTING EQUIPMENT, BUILDING AREA, OR SURFACES DAMAGED SHALL BE RESTORED TO ITS
<br />ORIGINAL CONDITION OR REPLACED.
<br />19.THE CONTRACTOR SHALL REMOVE, RELOCATE, REINSTALL, REROUTE, EXTEND, AND/OR
<br />ABANDON ALL EXISTING ELECTRICAL EQUIPMENT WHICH INTERFERES WITH THE NEW
<br />ELECTRICAL LAYOUTS. ALL SYSTEMS WHICH ARE NO LONGER REQUIRED TO FUNCTION SHALL
<br />BE DE-ENERGIZED AND DISCONNECTED AT THE SOURCE OF POWER SUPPLY.
<br />20.INSTALL NEW WORK AND CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO
<br />EXISTING FACILITIES. TEMPORARY SHUTDOWNS OF EXISTING SERVICES SHALL BE
<br />PERFORMED AT NO ADDITIONAL CHARGES, AT TIMES NOT TO INTERFERE WITH NORMAL
<br />OPERATION OF EXISTING FACILITIES AND ONLY WITH WRITTEN CONSENT OF OWNER.
<br />NOTIFICATION MUST BE GIVEN AT LEAST 7 DAYS PRIOR TO SHUT DOWN. ALARM AND
<br />EMERGENCY SYSTEMS SHALL NOT BE INTERRUPTED. MAINTAIN CONTINUOUS OPERATION OF
<br />EXISTING FACILITIES AS REQUIRED WITH NECESSARY TEMPORARY CONNECTIONS BETWEEN
<br />NEW AND EXISTING WORK. CONNECT NEW WORK TO EXISTING WORK IN NEAT AND
<br />ACCEPTABLE MANNER. RESTORE EXISTING DISTURBED WORK TO ORIGINAL CONDITION,
<br />INCLUDING MAINTENANCE OF WIRING CONTINUITY AS REQUIRED.
<br />21.ALL EXISTING MATERIAL AND EQUIPMENT IN USABLE CONDITION, WHICH IS TO BE REMOVED
<br />UNDER THIS CONTRACT, SHALL REMAIN THE PROPERTY OF THE OWNER OR SHALL BE
<br />DISPOSED OF IN A LEGAL MANNER BY THE ELECTRICAL CONTRACTOR, AS DIRECTED BY THE
<br />OWNER. ITEMS OF SALVAGE SHALL BE CAREFULLY REMOVED AND STORED AT LOCATIONS
<br />DIRECTED BY THE OWNER.
<br />22.ARRANGE TO WORK CONTINUOUSLY, INCLUDING OVERTIME, IF REQUIRED, TO ASSURE THAT
<br />SYSTEMS WILL BE SHUT DOWN ONLY DURING THE TIME ACTUALLY REQUIRED TO MAKE THE
<br />NECESSARY CONNECTIONS TO THE EXISTING SYSTEMS.
<br />23.WHERE WIRING IS OVERSIZED TO ACCOMMODATE VOLTAGE DROP OR OTHER FACTORS,
<br />CONTRACTOR SHALL SPLICE DOWN TO LARGEST ACCEPTABLE CONDUCTOR SIZE THE
<br />TERMINATION ALLOWS. PROVIDE JUNCTION BOXES AS REQUIRED. SPLICE SHALL BE AS CLOSE
<br />AS PRACTICABLE TO FINAL TERMINATION.
<br />24.CONTRACTOR SHALL COORDINATE INSTALLATION OF NEW UNDERGROUND WORK WITH
<br />EXISTING SUBSURFACE UTILITIES AND OBSTRUCTIONS. REROUTE AND OR RELOCATE
<br />EQUIPMENT AS REQUIRED.
<br />25.ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A NATIONALLY
<br />RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATES OCCUPATIONAL
<br />SAFETY HEALTH ADMINISTRATION.
<br />26.THE MAXIMUM COMBINED VOLTAGE DROP ON BOTH INSTALLED FEEDER CONDUCTORS AND
<br />BRANCH CIRCUIT CONDUCTORS TO THE FARTHEST CONNECTED LOAD OR OUTLET SHALL NOT
<br />EXCEED 5 PERCENT.
<br />27.LINEWEIGHTS:
<br />LIGHT LINEWEIGHT INDICATES EXISTING WORK OR WORK BY OTHERS.
<br />HEAVY DASHED LINEWEIGHT INDICATES EXISTING TO BE REMOVED OR
<br />DEMOLISHED.
<br />HEAVY LINEWEIGHT INDICATES NEW WORK.
<br />28.ALL ELECTRICAL WORK SHALL BE DESIGNED PER 2022 CALIFORNIA ELECTRICAL CODE, 2020
<br />NATIONAL ELECTRICAL CODE, AND 2022 BUILDING ENERGY EFFICIENCY STANDARDS.
<br />
<br />100AS/3P
<br />100AS/100AF/3P
<br />30AS/3P
<br />100AS/60AF/3P
<br />COMMUNICATIONS CABLE LABELING:
<br />EQUIPMENT TO BE LABELED IN ORDER OF PATHWAY FROM INTERNET SERVICE PROVIDER
<br />(ISP) TOWARD ELECTRIC VEHICLE (EV) CHARGER. ELECTRADA TO PROVIDE NETWORK
<br />DIAGRAM SHOWING HOW EQUIPMENT WILL BE CONNECTED. LABEL SCHEME WILL FOLLOW
<br />THE FORMAT OF <NAME OF EQUIPMENT><PORT OF CONNECTION IN SWITCH> - <NAME OF
<br />EQUIPMENT DOWNSTREAM><PORT CONNECTION NUMBER OR EVSE # PER EV SITE PLAN>.
<br />TEXT TO BE ONE LINE PER LABEL. BOTH SIDES OF CABLE TO BE LABELED THE SAME. USE
<br />BROTHER P-TOUCH CABLE, BRADY M210 LABEL MAKER, OR SIMILAR.
<br />COMMUNICATIONS CABLE TESTING:
<br />ALL CHARGERS TO BE TESTED FOR CONTINUITY AND CORRECT PAIRS USING A KLEIN TOOLS
<br />LAN EXPLORER DATA CABLE TESTER WITH REMOTE OR SIMILAR. ALL TEST RESULTS TO BE
<br />DOCUMENTED WITH ONE PHOTO PER TESTED CABLE, SHOWING THE CABLE CONNECTED TO
<br />THE TESTER, WITH LABEL CLEARLY VISIBLE AND THE SCREEN INDICATING A “PASS” RESULT.
<br />RESULTS TO BE COMPILED BY ELECTRADA DURING CLOSEOUT PROCESS AND ARE
<br />MANDATORY FOR PROJECT COMPLETION.
<br />J:
<br />\
<br />2
<br />0
<br />2
<br />4
<br />b
<br />\
<br />2
<br />0
<br />2
<br />4
<br />-
<br />0
<br />0
<br />6
<br />7
<br />.
<br />1
<br />1
<br />-
<br />r
<br />e
<br />d
<br />_
<br />b
<br />u
<br />l
<br />l
<br />_
<br />e
<br />l
<br />e
<br />c
<br />t
<br />r
<br />a
<br />d
<br />a
<br />_
<br />s
<br />a
<br />n
<br />t
<br />a
<br />_
<br />a
<br />n
<br />a
<br />\
<br />1
<br />0
<br />-
<br />d
<br />e
<br />s
<br />i
<br />g
<br />n
<br />\
<br />D
<br />r
<br />a
<br />w
<br />i
<br />n
<br />g
<br />s
<br />\
<br />w
<br />o
<br />r
<br />k
<br />i
<br />n
<br />g
<br />d
<br />o
<br />c
<br />u
<br />m
<br />e
<br />n
<br />t
<br />s
<br />\
<br />S
<br />H
<br />E
<br />E
<br />T
<br />S
<br />\
<br />L
<br />A
<br />
<br />M
<br />I
<br />R
<br />A
<br />D
<br />A
<br />\
<br />E
<br />L
<br />E
<br />C
<br />T
<br />R
<br />I
<br />C
<br />A
<br />L
<br />\
<br />E
<br />V
<br />-
<br />0
<br />6
<br />.
<br />d
<br />w
<br />g
<br />
<br />
<br />2
<br />0
<br />2
<br />6
<br />-
<br />0
<br />1
<br />-
<br />1
<br />4
<br />Project Title:
<br />Drawing Title:
<br />RevisionDateNo.
<br />Date:
<br />Drawn:
<br />Checked:
<br />Job No:
<br />Scale:
<br />Drawing No:
<br />SHT:OF
<br />BURNS ENGINEERING, INC. | 310-439-5643
<br />300 NORTH CONTINENTAL BLVD SUITE 540
<br />EL SEGUNDO, CA 90245
<br />10
<br />RED BULL
<br />ELECTRADA
<br />EV CHARGING
<br />SANTA ANA
<br />1900 EAST DEERE AVE, SANTA ANA, CA92705
<br />ADDRESS:
<br />1 06/24/2025 CD30
<br />2 07/02/2025 CD90
<br />3 07/15/2025 ISSUE FOR PERMIT
<br />4 01/14/2026 PLAN CHECK COMMENTS
<br />ELECTRICAL NOTES
<br />1/14/2026
<br />AS NOTED
<br />CS
<br />IB
<br />2024.0067.11
<br />EV-06