Laserfiche WebLink
TE OLIRFFOAC <br />LANRP <br />E 23191 <br />STA <br />ER <br />REGIST <br />ED <br />INA <br />N <br />REENIGE <br />FO OISSE <br />E AICLCERTL <br />Exp. 06/30/26 <br />MIRASOPHOCLISGEORGY <br />IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO <br />THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAW ING <br />AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT <br />BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE <br />EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG. <br />©2024 IMEG CONSULTANTS CORP. <br />REF. SCALE IN INCHES <br />0 1 2 3 <br />222 S. HARBOR BOULEVARD <br />SUITE 800 <br />ANAHEIM, CA 92805 <br />P: 714.490.5555 F: 714.490.5560 <br />The FUTURE. Built Smarter www.imegcorp.com <br />PROJECT #24007312.00 <br />0 5' <br />GRAPHIC SCALES: <br />Issue Date <br />1/16" = 1'-0" <br />50' <br />1/8" = 1'-0"1/4" = 1'-0"1/2" = 1'-0"3/4" = 1'-0"1" = 1'-0"1-1/2" = 1'-0"3" = 1'-0" <br />0 5'25' 0 1'12' 0 1'6' 0 4' 0 3'1'0 2' 0 1' <br />Chckd By <br />Drwn By <br />Scale <br />Building ID: <br />KP Proj. No. <br />Permit No. <br />Sheet <br />SheetsOf <br />Sheet Title <br />Project <br />Facility <br />This document is the property of the Owner and is <br />Project Architect Approval: <br />Architect/Engineer Of Record: <br />IF THIS SHEET IS NOT 30"x42" , IT IS <br />A REDUCED PRINT - SCALE ACCORDINGLY <br />National Facilities Services <br />Post Office Box 12916 <br />Oakland California 94604 <br />not to be used without owner's written permission. <br />Floor Lev: Section: <br />HGW Proj. No. <br />© <br />A <br />R <br />C <br />H <br />I <br />T <br />E <br />C <br />T <br />S <br /> <br />h <br />a <br />n <br />n <br />a <br /> <br />g <br />a <br />b <br />r <br />i <br />e <br />l <br /> <br />w <br />e <br />l <br />l <br />s <br />, <br /> <br />a <br />l <br />l <br /> <br />r <br />i <br />g <br />h <br />t <br />s <br /> <br />r <br />e <br />s <br />e <br />r <br />v <br />ed <br />. <br /> <br /> <br />A <br />n <br />y <br /> <br />u <br />s <br />e <br /> <br />w <br />i <br />t <br />h <br />o <br />u <br />t <br /> <br />p <br />e <br />r <br />m <br />i <br />s <br />s <br />i <br />o <br />n <br /> <br />i <br />s <br /> <br />e <br />x <br />p <br />r <br />e <br />s <br />s <br />l <br />y <br /> <br />p <br />r <br />o <br />h <br />i <br />b <br />i <br />t <br />ed <br />. <br /> <br /> <br />P <br />l <br />o <br />t <br />t <br />e <br />d <br />CAP029271 <br />1955 Bacon Street. San Diego, CA 92107 <br />Office 619 523 8487 <br />www.hgwarchitecture.com <br />PROJECT #24007312.00 <br />Revisions <br />By Appr. <br />KAISER HARBOR MACARTHUR MOB <br />EXTERIOR SIGNAGE <br />KAISER PERMANENTE <br />HARBOR MACARTHUR MOB <br />1/ <br />2 <br />3 <br />/ <br />2 <br />0 <br />2 <br />6 <br /> <br />1 <br />2 <br />: <br />4 <br />5 <br />: <br />5 <br />2 <br /> <br />P <br />M <br />01/23/2026 <br />MG <br />CL <br />ES002 <br />ELECTRICAL SPECIFICATIONS <br />3401 South Harbor Boulevard, <br />Santa Ana, CA 92704 <br />10 <br />0 <br />% <br /> <br />C <br />D <br /> <br />S <br />E <br />T <br />2441 <br />SECTION 26 05 00 -BASIC ELECTRICAL <br />REQUIREMENTS <br />PART 1 -GENERAL <br />1.1 SECTION INCLUDES <br />A.REQUIREMENTS APPLICABLE TO ALL DIVISION 26 SECTIONS. ALSO REFER TO DIVISION 1 - <br />GENERAL REQUIREMENTS <br />B.ALL MATERIALS AND INSTALLATION METHODS SHALL CONFORM TO THE APPLICABLE <br />STANDARDS, GUIDELINES AND CODES REFERENCED HEREIN AND WITHIN EACH <br />SPECIFICATION SECTION. <br />1.2 REFERENCES <br />A.B.CEC CALIFORNIA ELECTRICAL CODE <br />C.CCR CALIFORNIA CODE OF REGULATION <br />D.CBC CALIFORNIA BUILDING CODE <br />E.CFC CALIFORNIA FIRE CODE <br />F.CMC CALIFORNIA MECHANICAL CODE <br />G.CPC CALIFORNIA PLUMBING CODE <br />1.3 SCOPE OF WORK <br />A.THIS SPECIFICATION AND THE ASSOCIATED DRAWINGS GOVERN FURNISHING, INSTALLING, <br />TESTING AND PLACING INTO SATISFACTORY OPERATION THE ELECTRICAL SYSTEMS. <br />B.THE CONTRACTOR SHALL FURNISH AND INSTALL ALL NEW MATERIALS AS INDICATED ON <br />THE DRAWINGS, AND/OR IN THESE SPECIFICATIONS, AND ALL ITEMS REQUIRED TO MAKE <br />THE PORTION OF THE ELECTRICAL WORK A FINISHED AND W ORKING SYSTEM. <br />C.DESCRIPTION OF SYSTEMS SHALL BE AS FOLLOWS: <br />1.ELECTRICAL POWER SYSTEM TO AND INCLUDING LUMINAIRES,, DEVICES, ETC. <br />2.REMOVAL WORK AND/OR RELOCATION AND REUSE OF EXISTING SYSTEMS AND <br />EQUIPMENT. <br />3.TELECOMMUNICATIONS ROUGH-IN, AS SHOWN ON DRAWINGS, FOR INSTALLATION OF <br />TELECOMMUNICATIONS EQUIPMENT BY OTHERS UNDER SEPARATE CONTRACT. <br />4.FURNISH AND INSTALL FIRESTOPPING SYSTEMS FOR PENETRATIONS OF FIRE-RATED <br />CONSTRUCTION ASSOCIATED WITH THIS CONTRACTOR'S WORK. <br />D.WORK NOT INCLUDED: <br />1.TELECOMMUNICATIONS CABLING WILL BE BY KPIT, IN RACEWAYS AND CONDUITS <br />FURNISHED AND INSTALLED AS PART OF THE ELECTRICAL W ORK. <br />1.4 WORK SEQUENCE <br />A.ALL WORK THAT WILL PRODUCE EXCESSIVE NOISE OR INTERFERENCE WITH NORMAL <br />BUILDING OPERATIONS, AS DETERMINED BY THE OWNER, SHALL BE SCHEDULED WITH THE <br />OWNER. IT MAY BE NECESSARY TO SCHEDULE SUCH WORK DURING UNOCCUPIED HOURS. <br />THE OWNER RESERVES THE RIGHT TO DETERMINE WHEN RESTRICTED CONSTRUCTION <br />HOURS ARE REQUIRED. <br />1.5 QUALITY ASSURANCE <br />A.CONTRACTOR'S RESPONSIBILITY PRIOR TO SUBMITTING PRICING/BID DATA: <br />1.THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING COMPLETE AND OPERATING <br />SYSTEMS. THE CONTRACTOR ACKNOWLEDGES AND UNDERSTANDS THAT THE <br />CONTRACT DOCUMENTS ARE A TWO-DIMENSIONAL REPRESENTATION OF A THREE- <br />DIMENSIONAL OBJECT, SUBJECT TO HUMAN INTERPRETATION. THIS REPRESENTATION <br />MAY INCLUDE IMPERFECT DATA, INTERPRETED CODES, UTILITY GUIDES, THREE- <br />DIMENSIONAL CONFLICTS, AND REQUIRED FIELD COORDINATION ITEMS. SUCH <br />DEFICIENCIES CAN BE CORRECTED WHEN IDENTIFIED PRIOR TO ORDERING MATERIAL <br />AND STARTING INSTALLATION. THE CONTRACTOR AGREES TO CAREFULLY STUDY AND <br />COMPARE THE INDIVIDUAL CONTRACT DOCUMENTS AND REPORT AT ONCE IN WRITING <br />TO THE ARCHITECT/ENGINEER ANY DEFICIENCIES THE CONTRACTOR MAY DISCOVER. <br />THE CONTRACTOR FURTHER AGREES TO REQUIRE EACH SUBCONTRACTOR TO <br />LIKEWISE STUDY THE DOCUMENTS AND REPORT AT ONCE ANY DEFICIENCIES <br />DISCOVERED. <br />2.THE CONTRACTOR SHALL RESOLVE ALL REPORTED DEFICIENCIES WITH THE <br />ARCHITECT/ENGINEER PRIOR TO AWARDING ANY SUBCONTRACTS, ORDERING <br />MATERIAL, OR STARTING ANY WORK WITH THE CONTRACTOR'S OWN EMPLOYEES. ANY <br />WORK PERFORMED PRIOR TO RECEIPT OF INSTRUCTIONS FROM THE <br />ARCHITECT/ENGINEER WILL BE DONE AT THE CONTRACTOR'S RISK. <br />B.QUALIFICATIONS: <br />1.ONLY PRODUCTS OF REPUTABLE MANUFACTURERS AS DETERMINED BY THE <br />ARCHITECT/ENGINEER ARE ACCEPTABLE. <br />2.ALL CONTRACTORS AND SUBCONTRACTORS SHALL EMPLOY ONLY WORKMEN WHO <br />ARE SKILLED IN THEIR TRADES. AT ALL TIMES, THE NUMBER OF APPRENTICES AT THE <br />JOB SITE SHALL BE LESS THAN OR EQUAL TO THE NUMBER OF JOURNEYMEN AT THE <br />JOB SITE. <br />C.COMPLIANCE WITH CODES, LAWS, ORDINANCES: <br />1.IF THERE IS A DISCREPANCY BETWEEN THE CODES AND REGULATIONS AND THESE <br />SPECIFICATIONS, THE ARCHITECT/ENGINEER SHALL DETERMINE THE METHOD OR <br />EQUIPMENT USED. <br />2.IF THE CONTRACTOR NOTES, AT THE TIME OF BIDDING, THAT ANY PARTS OF THE <br />DRAWINGS OR SPECIFICATIONS DO NOT COMPLY WITH THE CODES OR REGULATIONS, <br />CONTRACTOR SHALL INFORM THE ARCHITECT/ENGINEER IN W RITING, REQUESTING A <br />CLARIFICATION. IF THERE IS INSUFFICIENT TIME FOR THIS PROCEDURE, CONTRACTOR <br />SHALL SUBMIT WITH THE PROPOSAL A SEPARATE PRICE TO MAKE THE SYSTEM <br />COMPLY WITH THE CODES AND REGULATIONS. <br />3.ALL CHANGES TO THE SYSTEM MADE AFTER THE LETTING OF THE CONTRACT TO <br />COMPLY WITH CODES OR THE REQUIREMENTS OF THE INSPECTOR, SHALL BE MADE <br />BY THE CONTRACTOR WITHOUT COST TO THE OWNER. <br />D.EXAMINATION OF DRAWINGS: <br />1.THE DRAWINGS FOR THE ELECTRICAL WORK ARE COMPLETELY DIAGRAMMATIC, <br />INTENDED TO CONVEY THE SCOPE OF THE WORK AND TO INDICATE THE GENERAL <br />ARRANGEMENTS AND LOCATIONS OF EQUIPMENT, OUTLETS, ETC., AND THE <br />APPROXIMATE SIZES OF EQUIPMENT. <br />2.CONTRACTOR SHALL DETERMINE THE EXACT LOCATIONS OF EQUIPMENT AND ROUGH- <br />INS, AND THE EXACT ROUTING OF RACEWAYS TO BEST FIT THE LAYOUT OF THE JOB. <br />CONDUIT ENTRY POINTS FOR ELECTRICAL EQUIPMENT INCLUDING, BUT NOT LIMITED <br />TO, PANELBOARDS SHALL BE DETERMINED BY THE CONTRACTOR UNLESS NOTED IN <br />THE CONTRACT DOCUMENTS. <br />3.SCALING OF THE DRAWINGS WILL NOT BE SUFFICIENT OR ACCURATE FOR <br />DETERMINING THESE LOCATIONS. <br />4.WHERE JOB CONDITIONS REQUIRE REASONABLE CHANGES IN ARRANGEMENTS AND <br />LOCATIONS, SUCH CHANGES SHALL BE MADE BY THE CONTRACTOR AT NO <br />ADDITIONAL COST TO THE OWNER. <br />5.BECAUSE OF THE SCALE OF THE DRAWINGS, CERTAIN BASIC ITEMS, SUCH AS <br />JUNCTION BOXES, PULL BOXES, CONDUIT FITTINGS, ETC., MAY NOT BE SHOWN, BUT <br />WHERE REQUIRED BY OTHER SECTIONS OF THE SPECIFICATIONS OR REQUIRED FOR <br />PROPER INSTALLATION OF THE WORK, SUCH ITEMS SHALL BE FURNISHED AND <br />INSTALLED. <br />6.IF AN ITEM IS EITHER SHOWN ON THE DRAWINGS OR CALLED FOR IN THE <br />SPECIFICATIONS, IT SHALL BE INCLUDED IN THIS CONTRACT. <br />7.THE CONTRACTOR SHALL DETERMINE QUANTITIES AND QUALITY OF MATERIAL AND <br />EQUIPMENT REQUIRED FROM THE DOCUMENTS. WHERE DISCREPANCIES ARISE <br />BETWEEN DRAWINGS, SCHEDULES AND/OR SPECIFICATIONS, THE GREATER AND <br />BETTER-QUALITY NUMBER SHALL GOVERN. <br />8.WHERE USED IN ELECTRICAL DOCUMENTS THE WORD "FURNISH" SHALL MEAN SUPPLY <br />FOR USE, THE WORD "INSTALL" SHALL MEAN CONNECT UP COMPLETE AND READY FOR <br />OPERATION, AND THE WORD "PROVIDE" SHALL MEAN TO SUPPLY FOR USE AND <br />CONNECT UP COMPLETE AND READY FOR OPERATION. <br />9.ANY ITEM LISTED AS FURNISHED SHALL ALSO BE INSTALLED UNLESS OTHERWISE <br />NOTED. <br />10.ANY ITEM LISTED AS INSTALLED SHALL ALSO BE FURNISHED UNLESS OTHERWISE <br />NOTED. <br />E.ELECTRONIC MEDIA/FILES: <br />1.CONSTRUCTION DRAWINGS FOR THIS PROJECT HAVE BEEN PREPARED UTILIZING <br />REVIT. <br />2.CONTRACTORS AND SUBCONTRACTORS MAY REQUEST ELECTRONIC MEDIA FILES OF <br />THE CONTRACT DRAWINGS AND/OR COPIES OF THE SPECIFICATIONS. SPECIFICATIONS <br />WILL BE PROVIDED IN PDF FORMAT. <br />3.UPON REQUEST FOR ELECTRONIC MEDIA, THE CONTRACTOR SHALL COMPLETE AND <br />RETURN A SIGNED "ELECTRONIC FILE TRANSMITTAL" FORM PROVIDED BY IMEG. <br />4.IF THE INFORMATION REQUESTED INCLUDES FLOOR PLANS PREPARED BY OTHERS, <br />THE CONTRACTOR WILL BE RESPONSIBLE FOR OBTAINING APPROVAL FROM THE <br />APPROPRIATE DESIGN PROFESSIONAL FOR USE OF THAT PART OF THE DOCUMENT. <br />5.THE ELECTRONIC CONTRACT DOCUMENTS CAN BE USED FOR PREPARATION OF SHOP <br />DRAWINGS AND AS-BUILT DRAWINGS ONLY. THE INFORMATION MAY NOT BE USED IN <br />WHOLE OR IN PART FOR ANY OTHER PROJECT. <br />6.THE DRAWINGS PREPARED BY IMEG FOR BIDDING PURPOSES MAY NOT BE USED <br />DIRECTLY FOR DUCTWORK LAYOUT DRAWINGS OR COORDINATION DRAWINGS. <br />7.THE INFORMATION IS PROVIDED TO EXPEDITE THE PROJECT AND ASSIST THE <br />CONTRACTOR WITH NO GUARANTEE BY IMEG AS TO THE ACCURACY OR <br />CORRECTNESS OF THE INFORMATION PROVIDED. IMEG ACCEPTS NO RESPONSIBILITY <br />OR LIABILITY FOR THE CONTRACTOR'S USE OF THESE DOCUMENTS. <br />F.FIELD MEASUREMENTS: <br />1.VERIFY ALL PERTINENT DIMENSIONS AT THE JOB SITE BEFORE ORDERING ANY <br />CONDUIT, CONDUCTORS, WIREWAYS, BUS DUCT, FITTINGS, ETC. <br />1.6 SUBMITTALS <br />A.SUBMITTALS SHALL BE REQUIRED FOR THE FOLLOWING ITEMS SHOWN ON DRAWINGS <br />AND FOR ADDITIONAL ITEMS WHERE REQUIRED ELSEWHERE IN THE SPECIFICATIONS. <br />1.SUBMITTALS LIST: <br />REFERENCED SPECIFICATION SECTION SUBMITTAL ITEM <br />26 05 13 WIRE AND CABLE <br />26 05 26 GROUNDING AND BONDING <br />26 05 33 CONDUIT AND BOXES <br />26 05 53 ELECTRICAL IDENTIFICATION <br />26 09 33 LIGHTING CONTROL SYSTEM <br />26 27 26 WIRING DEVICES <br />26 51 19 LED LIGHTING <br />B.GENERAL SUBMITTAL PROCEDURES: IN ADDITION TO THE PROVISIONS OF DIVISION 1, THE <br />FOLLOWING ARE REQUIRED: <br />1.TRANSMITTAL: EACH TRANSMITTAL SHALL INCLUDE THE FOLLOWING: <br />a.DATE <br />b.PROJECT TITLE AND NUMBER <br />c.CONTRACTOR'S NAME AND ADDRESS <br />d.DIVISION OF WORK (E.G., ELECTRICAL, PLUMBING, HEATING, VENTILATING, ETC.) <br />e.DESCRIPTION OF ITEMS SUBMITTED AND RELEVANT SPECIFICATION NUMBER <br />f.NOTATIONS OF DEVIATIONS FROM THE CONTRACT DOCUMENTS <br />g.OTHER PERTINENT DATA <br />2.SUBMITTAL COVER SHEET: EACH SUBMITTAL SHALL INCLUDE A COVER SHEET <br />CONTAINING: <br />a.DATE <br />b.PROJECT TITLE AND NUMBER <br />c.ARCHITECT/ENGINEER <br />d.CONTRACTOR AND SUBCONTRACTORS' NAMES AND ADDRESSES <br />e.SUPPLIER AND MANUFACTURER'S NAMES AND ADDRESSES <br />f.DIVISION OF WORK (E.G., ELECTRICAL, PLUMBING, HEATING, VENTILATING, ETC.) <br />g.DESCRIPTION OF ITEM SUBMITTED (USING PROJECT NOMENCLATURE) AND <br />RELEVANT SPECIFICATION NUMBER <br />h.NOTATIONS OF DEVIATIONS FROM THE CONTRACT DOCUMENTS <br />i.OTHER PERTINENT DATA <br />j.PROVIDE SPACE FOR CONTRACTOR'S REVIEW STAMPS <br />3.COMPOSITION: <br />a.SUBMITTALS SHALL BE SUBMITTED USING SPECIFICATION SECTIONS AND THE <br />PROJECT NOMENCLATURE FOR EACH ITEM. <br />b.INDIVIDUAL SUBMITTAL PACKAGES SHALL BE PREPARED FOR ITEMS IN EACH <br />SPECIFICATION SECTION. ALL ITEMS WITHIN A SINGLE SPECIFICATION SECTION <br />SHALL BE PACKAGED TOGETHER WHERE POSSIBLE. AN INDIVIDUAL SUBMITTAL <br />MAY CONTAIN ITEMS FROM MULTIPLE SPECIFICATIONS SECTIONS IF THE ITEMS <br />ARE INTIMATELY LINKED (E.G., PUMPS AND MOTORS). <br />c.ALL SETS SHALL CONTAIN AN INDEX OF THE ITEMS ENCLOSED WITH A GENERAL <br />TOPIC DESCRIPTION ON THE COVER. <br />4.CONTENT: SUBMITTALS SHALL INCLUDE ALL FABRICATION, ERECTION, LAYOUT, AND <br />SETTING DRAWINGS; MANUFACTURERS' STANDARD DRAWINGS; SCHEDULES; <br />DESCRIPTIVE LITERATURE, CATALOGS AND BROCHURES; PERFORMANCE AND TEST <br />DATA; WIRING AND CONTROL DIAGRAMS; DIMENSIONS; SHIPPING AND OPERATING <br />WEIGHTS; SHIPPING SPLITS; SERVICE CLEARANCES; AND ALL OTHER DRAWINGS AND <br />DESCRIPTIVE DATA OF MATERIALS OF CONSTRUCTION AS MAY BE REQUIRED TO <br />SHOW THAT THE MATERIALS, EQUIPMENT OR SYSTEMS AND THE LOCATION THEREOF <br />CONFORM TO THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. <br />5.CONTRACTOR'S APPROVAL STAMP: <br />a.THE CONTRACTOR SHALL THOROUGHLY REVIEW AND APPROVE ALL SHOP <br />DRAWINGS BEFORE SUBMITTING THEM TO THE ARCHITECT/ENGINEER. THE <br />CONTRACTOR SHALL STAMP, DATE AND SIGN EACH SUBMITTAL CERTIFYING IT HAS <br />BEEN REVIEWED. <br />b.UNSTAMPED SUBMITTALS WILL BE REJECTED. <br />c.THE CONTRACTOR'S REVIEW SHALL INCLUDE, BUT NOT BE LIMITED TO, <br />VERIFICATION OF THE FOLLOWING: <br />1)ONLY APPROVED MANUFACTURERS ARE USED. <br />2)ADDENDA ITEMS HAVE BEEN INCORPORATED. <br />3)CATALOG NUMBERS AND OPTIONS MATCH THOSE SPECIFIED. <br />4)PERFORMANCE DATA MATCHES THAT SPECIFIED. <br />5)ELECTRICAL CHARACTERISTICS AND LOADS MATCH THOSE SPECIFIED. <br />6)EQUIPMENT CONNECTION LOCATIONS, SIZES, CAPACITIES, ETC. HAVE BEEN <br />COORDINATED WITH OTHER AFFECTED TRADES. <br />7)DIMENSIONS AND SERVICE CLEARANCES ARE SUITABLE FOR THE INTENDED <br />LOCATION. <br />8)EQUIPMENT DIMENSIONS ARE COORDINATED WITH SUPPORT STEEL, <br />HOUSEKEEPING PADS, OPENINGS, ETC. <br />9)CONSTRUCTABILITY ISSUES ARE RESOLVED (E.G., WEIGHTS AND DIMENSIONS <br />ARE SUITABLE FOR GETTING THE ITEM INTO THE BUILDING AND INTO PLACE, <br />SINKS FIT INTO COUNTERTOPS, ETC.). <br />d.THE CONTRACTOR SHALL REVIEW, STAMP AND APPROVE ALL SUBCONTRACTORS' <br />SUBMITTALS AS DESCRIBED ABOVE. <br />e.THE CONTRACTOR'S APPROVAL STAMP IS REQUIRED ON ALL SUBMITTALS. <br />APPROVAL WILL INDICATE THE CONTRACTOR'S REVIEW OF ALL MATERIAL AND A <br />COMPLETE UNDERSTANDING OF EXACTLY WHAT IS TO BE FURNISHED. <br />CONTRACTOR SHALL CLEARLY MARK ALL DEVIATIONS FROM THE CONTRACT <br />DOCUMENTS ON ALL SUBMITTALS. IF DEVIATIONS ARE NOT MARKED BY THE <br />CONTRACTOR, THEN THE ITEM SHALL BE REQUIRED TO MEET ALL DRAWING AND <br />SPECIFICATION REQUIREMENTS. <br />6.SUBMITTAL IDENTIFICATION AND MARKINGS: <br />a.THE CONTRACTOR SHALL CLEARLY MARK EACH ITEM WITH THE SAME <br />NOMENCLATURE APPLIED ON THE DRAWINGS OR IN THE SPECIFICATIONS. <br />b.THE CONTRACTOR SHALL CLEARLY INDICATE THE SIZE, FINISH, MATERIAL, ETC. <br />c.WHERE MORE THAN ONE MODEL IS SHOWN ON A MANUFACTURER'S SHEET, THE <br />CONTRACTOR SHALL CLEARLY INDICATE EXACTLY WHICH ITEM AND WHICH DATA <br />IS INTENDED. <br />d.ALL MARKS AND IDENTIFICATIONS ON THE SUBMITTALS SHALL BE UNAMBIGUOUS. <br />7.SCHEDULE SUBMITTALS TO EXPEDITE THE PROJECT. COORDINATE SUBMISSION OF <br />RELATED ITEMS. <br />8.IDENTIFY VARIATIONS FROM THE CONTRACT DOCUMENTS AND PRODUCT OR SYSTEM <br />LIMITATIONS THAT MAY BE DETRIMENTAL TO THE SUCCESSFUL PERFORMANCE OF <br />THE COMPLETED WORK. <br />9.REPRODUCTION OF CONTRACT DOCUMENTS ALONE IS NOT ACCEPTABLE FOR <br />SUBMITTALS. <br />10.INCOMPLETE SUBMITTALS WILL BE REJECTED WITHOUT REVIEW. PARTIAL SUBMITTALS <br />WILL ONLY BE REVIEWED WITH PRIOR APPROVAL FROM THE ARCHITECT/ENGINEER. <br />11.SUBMITTALS NOT REQUIRED BY THE CONTRACT DOCUMENTS MAY BE RETURNED <br />WITHOUT REVIEW. <br />12.THE ARCHITECT/ENGINEER'S RESPONSIBILITY SHALL BE TO REVIEW ONE SET OF SHOP <br />DRAWING SUBMITTALS FOR EACH PRODUCT. IF THE FIRST SUBMITTAL IS INCOMPLETE <br />OR DOES NOT COMPLY WITH THE DRAWINGS AND/OR SPECIFICATIONS, THE <br />CONTRACTOR SHALL BE RESPONSIBLE TO BEAR THE COST FOR THE <br />ARCHITECT/ENGINEER TO RECHECK AND HANDLE THE ADDITIONAL SHOP DRAWING <br />SUBMITTALS. <br />13.SUBMITTALS SHALL BE REVIEWED AND APPROVED BY THE ARCHITECT/ENGINEER <br />BEFORE RELEASING ANY EQUIPMENT FOR MANUFACTURE OR SHIPMENT. <br />14.CONTRACTOR'S RESPONSIBILITY FOR ERRORS, OMISSIONS OR DEVIATION FROM THE <br />CONTRACT DOCUMENTS IN SUBMITTALS IS NOT RELIEVED BY THE <br />ARCHITECT/ENGINEER'S APPROVAL. <br />15.SCHEDULE SHALL ALLOW FOR ADEQUATE TIME TO PERFORM ORDERLY AND PROPER <br />REVIEW OF SUBMITTALS, INCLUDING TIME FOR CONSULTANTS AND OWNER IF <br />REQUIRED, AND RESUBMITTALS BY CONTRACTOR IF NECESSARY, AND TO CAUSE NO <br />DELAY IN WORK OR IN ACTIVITIES OF OWNER OR OTHER CONTRACTORS. <br />a.ALLOW AT LEAST TWO WEEKS FOR ARCHITECT'S/ENGINEER'S REVIEW AND <br />PROCESSING OF EACH SUBMITTAL, EXCLUDING MAILING. <br />16.ARCHITECT/ENGINEER RESERVES THE RIGHT TO WITHHOLD ACTION ON A SUBMITTAL <br />WHICH, IN THE ARCHITECT/ENGINEER'S OPINION, REQUIRES COORDINATION WITH <br />OTHER SUBMITTALS UNTIL RELATED SUBMITTALS ARE RECEIVED. THE <br />ARCHITECT/ENGINEER WILL NOTIFY THE CONTRACTOR, IN WRITING, WHEN THEY <br />EXERCISE THIS RIGHT. <br />1.7 CHANGE ORDERS <br />A.A DETAILED MATERIAL AND LABOR TAKEOFF SHALL BE PREPARED FOR EACH CHANGE <br />ORDER, ALONG WITH LABOR RATES AND MARKUP PERCENTAGES. CHANGE ORDERS <br />SHALL BE BROKEN DOWN BY SHEET OR ASSOCIATED INDIVIDUAL LINE ITEM INDICATED IN <br />THE CHANGE ASSOCIATED NARRATIVE, WHICHEVER PROVIDES THE MOST DETAILED <br />BREAKDOWN. CHANGE ORDERS WITH INADEQUATE BREAKDOWN WILL BE REJECTED. <br />B.ITEMIZED PRICING WITH UNIT COST SHALL BE PROVIDED FROM ALL DISTRIBUTORS AND <br />ASSOCIATED SUBCONTRACTORS. <br />C.CHANGE ORDER WORK SHALL NOT PROCEED UNTIL AUTHORIZED. <br />1.8 PRODUCT DELIVERY, STORAGE, HANDLING AND MAINTENANCE <br />A.EXERCISE CARE IN TRANSPORTING AND HANDLING TO AVOID DAMAGE TO MATERIALS. <br />STORE MATERIALS ON THE SITE TO PREVENT DAMAGE. <br />B.KEEP ALL MATERIALS CLEAN, DRY AND FREE FROM DAMAGING ENVIRONMENTS. <br />C.CONTRACTOR IS RESPONSIBLE FOR MOVING EQUIPMENT INTO THE BUILDING AND/OR <br />SITE. CONTRACTOR SHALL REVIEW SITE PRIOR TO BID FOR PATH LOCATIONS AND ANY <br />REQUIRED BUILDING MODIFICATIONS TO ALLOW MOVEMENT OF EQUIPMENT. <br />CONTRACTOR SHALL COORDINATE THE WORK WITH OTHER TRADES. <br />1.9 WARRANTY <br />A.PROVIDE ONE-YEAR WARRANTY FOR ALL FIXTURES, EQUIPMENT, MATERIALS, AND <br />WORKMANSHIP. <br />B.THE WARRANTY PERIOD FOR ALL WORK IN THIS SPECIFICATION DIVISION SHALL <br />COMMENCE ON THE DATE OF SUBSTANTIAL COMPLETION OR SUCCESSFUL SYSTEM <br />PERFORMANCE WHICHEVER OCCURS LATER. THE WARRANTY MAY ALSO COMMENCE IF A <br />WHOLE OR PARTIAL SYSTEM OR ANY SEPARATE PIECE OF EQUIPMENT OR COMPONENT IS <br />PUT INTO USE FOR THE BENEFIT OF ANY PARTY OTHER THAN THE INSTALLING <br />CONTRACTOR WITH PRIOR WRITTEN AUTHORIZATION OF THE OWNER. IN THIS INSTANCE, <br />THE WARRANTY PERIOD SHALL COMMENCE ON THE DATE WHEN SUCH WHOLE SYSTEM, <br />PARTIAL SYSTEM OR SEPARATE PIECE OF EQUIPMENT OR COMPONENT IS PLACED IN <br />OPERATION AND ACCEPTED IN WRITING BY THE OWNER. <br />C.WARRANTY REQUIREMENTS EXTEND TO CORRECTION, WITHOUT COST TO THE OWNER, <br />OF ALL WORK FOUND TO BE DEFECTIVE OR NONCONFORMING TO THE CONTRACT <br />DOCUMENTS. THE CONTRACTOR SHALL BEAR THE COST OF CORRECTING ALL DAMAGE <br />DUE TO DEFECTS OR NONCONFORMANCE WITH CONTRACT DOCUMENTS EXCLUDING <br />REPAIRS REQUIRED AS A RESULT OF IMPROPER MAINTENANCE OR OPERATION, OR OF <br />NORMAL WEAR AS DETERMINED BY THE ARCHITECT/ENGINEER. <br />1.10 INSURANCE <br />A.THIS CONTRACTOR SHALL MAINTAIN INSURANCE COVERAGE AS SET FORTH IN DIVISION 1 <br />OF THESE SPECIFICATIONS. <br />1.11 MATERIAL SUBSTITUTION <br />A.WHERE SEVERAL MANUFACTURERS’NAMES ARE GIVEN, THE MANUFACTURER FOR WHICH <br />A CATALOG NUMBER IS GIVEN IS THE BASIS FOR JOB DESIGN AND ESTABLISHES THE <br />QUALITY. <br />B.EQUIVALENT EQUIPMENT MANUFACTURED BY THE OTHER LISTED MANUFACTURERS MAY <br />BE USED. CONTRACTOR SHALL ENSURE THAT ALL ITEMS SUBMITTED BY THESE OTHER <br />MANUFACTURERS MEET ALL REQUIREMENTS OF THE DRAWINGS AND SPECIFICATIONS <br />AND FITS IN THE ALLOCATED SPACE. WHEN USING OTHER LISTED MANUFACTURERS, THE <br />CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ANY AND ALL MODIFICATIONS <br />NECESSARY (INCLUDING, BUT NOT LIMITED TO STRUCTURAL SUPPORTS, ELECTRICAL <br />CONNECTIONS AND ROUGH-IN, AND REGULATORY AGENCY APPROVAL, ETC.) AND <br />COORDINATE SUCH WITH OTHER CONTRACTORS. THE ARCHITECT/ENGINEER SHALL MAKE <br />THE FINAL DETERMINATION OF WHETHER A PRODUCT IS EQUIVALENT. <br />C.ANY MATERIAL, ARTICLE OR EQUIPMENT OF OTHER UNNAMED MANUFACTURERS WHICH <br />WILL ADEQUATELY PERFORM THE SERVICES AND DUTIES IMPOSED BY THE DESIGN AND IS <br />OF A QUALITY EQUAL TO OR BETTER THAN THE MATERIAL, ARTICLE OR EQUIPMENT <br />IDENTIFIED BY THE DRAWINGS AND SPECIFICATIONS MAY BE USED IF APPROVAL IS <br />SECURED IN WRITING FROM THE ARCHITECT/ENGINEER VIA ADDENDUM. THE <br />CONTRACTOR ASSUMES ALL COSTS INCURRED AS A RESULT OF USING THE OFFERED <br />MATERIAL, ARTICLE OR EQUIPMENT, ON THE CONTRACTORS PART OR ON THE PART OF <br />OTHER CONTRACTORS WHOSE WORK IS AFFECTED. <br />D.VOLUNTARY ADD OR DEDUCT PRICES FOR ALTERNATE MATERIALS MAY BE LISTED ON THE <br />BID FORM. THESE ITEMS WILL NOT BE USED IN DETERMINING THE LOW BIDDER. THIS <br />CONTRACTOR ASSUMES ALL COSTS INCURRED AS A RESULT OF USING THE OFFERED <br />MATERIAL OR EQUIPMENT ON THE CONTRACTORS PART OR ON THE PART OF OTHER <br />CONTRACTORS WHOSE WORK IS AFFECTED. <br />E.ALL MATERIAL SUBSTITUTIONS REQUESTED AFTER THE FINAL ADDENDUM MUST BE <br />LISTED AS VOLUNTARY CHANGES ON THE BID FORM. <br />1.12 PROJECT COMMISSIONING <br />A.THE CONTRACTOR SHALL WORK WITH THE COMMISSIONING AGENT (CXA) AND PROVIDE <br />ALL SERVICES AS DESCRIBED IN THE COMMISSIONING PLAN. <br />PART 2 -PRODUCTS <br />2.1 GENERAL <br />A.ALL ITEMS OF MATERIAL HAVING A SIMILAR FUNCTION SHALL BE OF THE SAME <br />MANUFACTURER UNLESS SPECIFICALLY STATED OTHERWISE ON DRAWINGS OR <br />ELSEWHERE IN SPECIFICATIONS. <br />PART 3 -EXECUTION <br />3.1 JOBSITE SAFETY <br />A.NEITHER THE PROFESSIONAL ACTIVITIES OF THE ARCHITECT/ENGINEER, NOR THE <br />PRESENCE OF THE ARCHITECT/ENGINEER OR THE EMPLOYEES AND SUBCONSULTANTS AT <br />A CONSTRUCTION SITE, SHALL RELIEVE THE CONTRACTOR AND ANY OTHER ENTITY OF <br />THEIR OBLIGATIONS, DUTIES AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, <br />CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES <br />NECESSARY FOR PERFORMING, SUPERINTENDING OR COORDINATING ALL PORTIONS OF <br />THE WORK OF CONSTRUCTION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND <br />ANY HEALTH OR SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES. THE <br />ARCHITECT/ENGINEER AND PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY <br />CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR OTHER ENTITY OR THEIR <br />EMPLOYEES IN CONNECTION WITH THEIR WORK OR ANY HEALTH OR SAFETY <br />PRECAUTIONS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOBSITE SAFETY. THE <br />ARCHITECT/ENGINEER AND THE ARCHITECT/ENGINEER'S CONSULTANTS SHALL BE <br />INDEMNIFIED AND SHALL BE MADE ADDITIONAL INSUREDS UNDER THE CONTRACTOR'S <br />GENERAL LIABILITY INSURANCE POLICY. <br />3.2 ARCHITECT/ENGINEER OBSERVATION OF WORK <br />A.THE CONTRACTOR SHALL PROVIDE SEVEN (7) CALENDAR DAYS' NOTICE TO THE <br />ARCHITECT/ENGINEER PRIOR TO: <br />1.COVERING EXTERIOR WALLS, INTERIOR PARTITIONS AND CHASES. <br />2.INSTALLING HARD OR SUSPENDED CEILINGS AND SOFFITS. <br />B.THE ARCHITECT/ENGINEER WILL REVIEW THE INSTALLATION AND PROVIDE A WRITTEN <br />REPORT NOTING DEFICIENCIES REQUIRING CORRECTION. THE CONTRACTOR'S SCHEDULE <br />SHALL ACCOUNT FOR THESE REVIEWS AND SHOW THEM AS LINE ITEMS IN THE APPROVED <br />SCHEDULE. <br />C.ABOVE-CEILING FINAL OBSERVATION: <br />1.ALL WORK ABOVE THE CEILINGS MUST BE COMPLETE PRIOR TO THE <br />ARCHITECT/ENGINEER'S REVIEW. THIS INCLUDES, BUT IS NOT LIMITED TO: <br />a.ALL JUNCTION BOXES ARE CLOSED AND IDENTIFIED IN ACCORDANCE WITH <br />SECTION 26 05 53 ELECTRICAL IDENTIFICATION. <br />b.LUMINAIRES, INCLUDING CEILING-MOUNTED EXIT AND EMERGENCY LIGHTS, ARE <br />INSTALLED AND OPERATIONAL. <br />c.LUMINAIRE WHIPS ARE SUPPORTED ABOVE THE CEILING. <br />d.CONDUIT IDENTIFICATION IS INSTALLED IN ACCORDANCE W ITH SECTION 26 05 53 <br />ELECTRICAL IDENTIFICATION. <br />e.LUMINAIRES ARE SUSPENDED INDEPENDENTLY OF THE CEILING SYSTEM WHEN <br />REQUIRED BY THESE CONTRACT DOCUMENTS. <br />f.ALL WALL PENETRATIONS HAVE BEEN SEALED. <br />2.TO PREVENT THE ABOVE-CEILING FINAL OBSERVATION FROM OCCURRING TOO EARLY, <br />THE CONTRACTOR SHALL REVIEW THE STATUS OF THE WORK AND CERTIFY, IN <br />WRITING, THAT THE WORK IS READY FOR THE ABOVE-CEILING FINAL OBSERVATION. <br />3.IT IS UNDERSTOOD THAT IF THE ARCHITECT/ENGINEER FINDS THE CEILINGS HAVE <br />BEEN INSTALLED PRIOR TO THIS REVIEW AND PRIOR TO SEVEN DAYS ELAPSING, THE <br />ARCHITECT/ENGINEER MAY NOT RECOMMEND FURTHER PAYMENTS TO THE <br />CONTRACTOR UNTIL FULL ACCESS HAS BEEN PROVIDED. <br />3.3 PROJECT CLOSEOUT <br />A.FINAL JOBSITE OBSERVATION: <br />1.TO PREVENT THE FINAL JOBSITE OBSERVATION FROM OCCURRING TOO EARLY, THE <br />CONTRACTOR SHALL REVIEW THE COMPLETION STATUS OF THE PROJECT AND <br />CERTIFY THAT THE JOB IS READY FOR THE FINAL JOBSITE OBSERVATION. <br />2.ATTACHED TO THE END OF THIS SECTION IS A TYPICAL LIST OF ITEMS THAT <br />REPRESENT THE DEGREE OF JOB COMPLETENESS EXPECTED PRIOR TO REQUESTING <br />A REVIEW. THE CONTRACTOR SHALL SIGN THE ATTACHED CERTIFICATION AND <br />RETURN IT TO THE ARCHITECT/ENGINEER SO THAT THE FINAL OBSERVATION CAN BE <br />SCHEDULED. <br />3.IT IS UNDERSTOOD THAT IF THE ARCHITECT/ENGINEER FINDS THE JOB NOT READY <br />FOR THE FINAL OBSERVATION AND ADDITIONAL TRIPS AND OBSERVATIONS ARE <br />REQUIRED TO BRING THE PROJECT TO COMPLETION, THE COST OF THE ADDITIONAL <br />TIME AND EXPENSES INCURRED BY THE ARCHITECT/ENGINEER WILL BE DEDUCTED <br />FROM THE CONTRACTOR'S FINAL PAYMENT. <br />4.CONTRACTOR SHALL NOTIFY ARCHITECT/ENGINEER 72 HOURS PRIOR TO <br />INSTALLATION OF CEILINGS OR LAY-IN CEILING TILES. <br />B.THE FOLLOWING MUST BE SUBMITTED BEFORE ARCHITECT/ENGINEER RECOMMENDS <br />FINAL PAYMENT: <br />1.OPERATION AND MAINTENANCE MANUALS WITH COPIES OF APPROVED SHOP <br />DRAWINGS. <br />2.RECORD DOCUMENTS INCLUDING MARKED-UP DRAWINGS AND SPECIFICATIONS. <br />3.PROVIDE SPARE PARTS, MAINTENANCE, AND EXTRA MATERIALS IN QUANTITIES <br />SPECIFIED IN INDIVIDUAL SPECIFICATION SECTIONS. <br />4.INSPECTION AND TESTING REPORT BY THE FIRE ALARM SYSTEM MANUFACTURER. <br />C.CIRCUIT DIRECTORIES: <br />1.PROVIDE CUSTOM TYPED CIRCUIT DIRECTORY FOR EACH BRANCH CIRCUIT <br />PANELBOARD. PROVIDE UPDATED CUSTOM TYPED CIRCUIT DIRECTORY FOR EACH <br />EXISTING BRANCH CIRCUIT PANELBOARD WITH NEW OR REVISED CIRCUITS PER THE <br />SCOPE OF WORK. LABEL SHALL INCLUDE EQUIPMENT NAME OR FINAL APPROVED <br />ROOM NAME, ROOM NUMBER, AND LOAD TYPE FOR EACH CIRCUIT (EXAMPLES: SUMP <br />SP-1 OR ROOM 101 RECEPT). REVISE DIRECTORY TO REFLECT CIRCUIT CHANGES <br />REQUIRED TO BALANCE PHASE LOADS. PRINTED COPIES OF THE BID DOCUMENT <br />PANEL SCHEDULES ARE NOT ACCEPTABLE AS CIRCUIT DIRECTORIES. <br />3.4 OPERATION AND MAINTENANCE MANUALS <br />A.GENERAL: <br />1.PROVIDE AN ELECTRONIC COPY OF THE O&M MANUALS AS DESCRIBED BELOW FOR <br />ARCHITECT/ENGINEER'S REVIEW AND APPROVAL. THE ELECTRONIC COPY SHALL BE <br />CORRECTED AS REQUIRED TO ADDRESS THE ARCHITECT/ENGINEER'S COMMENTS. <br />ONCE CORRECTED, ELECTRONIC COPIES AND PAPER COPIES SHALL BE DISTRIBUTED <br />AS DIRECTED BY THE ARCHITECT/ENGINEER. <br />2.APPROVED O&M MANUALS SHALL BE COMPLETED AND IN THE OWNER'S POSSESSION <br />PRIOR TO OWNER'S ACCEPTANCE AND AT LEAST 10 DAYS PRIOR TO INSTRUCTION OF <br />OPERATING PERSONNEL. <br />3.5 RECORD DOCUMENTS <br />A.THE FOLLOWING PARAGRAPHS SUPPLEMENT DIVISION 1 REQUIREMENTS. <br />B.MAINTAIN AT THE JOB SITE A SEPARATE AND COMPLETE SET OF ELECTRICAL DRAWINGS <br />AND SPECIFICATIONS WITH ALL CHANGES MADE TO THE SYSTEMS CLEARLY AND <br />PERMANENTLY MARKED IN COMPLETE DETAIL. <br />B.ALL ELECTRICAL CONDUIT AND EQUIPMENT, FITTINGS, HANGERS, STRUCTURAL <br />SUPPORTS, ETC., IN UNFINISHED AREAS, SUCH AS EQUIPMENT AND STORAGE ROOM <br />AREA, SHALL BE PAINTED TWO (2) COATS OF OIL PAINT OF COLORS SELECTED BY THE <br />ARCHITECT. <br />C.DO NOT PAINT ELECTRIC CONDUITS IN CRAWL SPACES, TUNNELS, OR SPACES ABOVE <br />SUSPENDED CEILINGS EXCEPT THAT WHERE CONDUIT IS IN A DAMP LOCATION GIVE <br />EXPOSED THREADS AT JOINTS TWO COATS OF SEALER AFTER JOINT IS MADE UP. <br />3.7 ADJUST AND CLEAN <br />A.THOROUGHLY CLEAN ALL EQUIPMENT AND SYSTEMS PRIOR TO THE OWNER'S FINAL <br />ACCEPTANCE OF THE PROJECT. <br />B.CLEAN ALL FOREIGN PAINT, GREASE, OIL, DIRT, LABELS, STICKERS, ETC. FROM ALL <br />EQUIPMENT. <br />C.REMOVE ALL RUBBISH, DEBRIS, ETC., ACCUMULATED DURING CONSTRUCTION FROM THE <br />PREMISES. <br />3.8 SPECIAL REQUIREMENTS <br />A.ADHESIVES AND SEALANTS: ALL SEALERS, ADHESIVES, AND SEALANTS SHALL COMPLY <br />WITH THE LOW EMITTING MATERIAL LIMITS OF THE FOLLOW ING STANDARDS: <br />1.CDPH STANDARD METHOD V1.1-2010 -STANDARD METHOD FOR THE TESTING AND <br />EVALUATION OF VOLATILE ORGANIC CHEMICAL EMISSIONS VOC FROM INDOOR <br />SOURCES USING ENVIRONMENTAL CHAMBERS VERSION 1.1. <br />2.SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1168 -ADHESIVE AND <br />SEALANT APPLICATIONS. ALL ADHESIVES AND SEALANTS WET-APPLIED ON SITE SHALL <br />COMPLY WITH THE APPLICABLE CHEMICAL CONTENT REQUIREMENTS OF SCAQMD <br />RULE 1168. <br />3.SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE SCAQMD 1113 -WET <br />APPLIED PAINTS AND COATINGS. ALL PAINTS AND COATINGS WET-APPLIED ON SITE <br />MUST MEET THE APPLICABLE VOC LIMITS OF SCAQMD RULE 1113. <br />3.9 FIELD QUALITY CONTROL <br />A.GENERAL: <br />1.CONDUCT ALL TESTS REQUIRED DURING AND AFTER CONSTRUCTION. SUBMIT TEST <br />RESULTS IN NETA FORMAT, OR EQUIVALENT FORM, THAT SHOWS THE TEST <br />EQUIPMENT USED, CALIBRATION DATE, TESTER'S NAME, AMBIENT TEST CONDITIONS, <br />HUMIDITY, CONDUCTOR LENGTH, AND RESULTS CORRECTED TO 40°C. <br />2.SUPPLY NECESSARY INSTRUMENTS, METERS, ETC., FOR THE TESTS. SUPPLY <br />COMPETENT TECHNICIANS WITH TRAINING IN THE PROPER TESTING TECHNIQUES. <br />3.ALL CABLES AND WIRES SHALL BE TESTED FOR SHORTS AND GROUNDS FOLLOWING <br />INSTALLATION AND CONNECTION TO DEVICES. REPLACE SHORTED OR GROUNDED <br />WIRES AND CABLES. <br />4.ANY WIRING DEVICE, ELECTRICAL APPARATUS OR LUMINAIRE, IF GROUNDED OR <br />SHORTED ON ANY INTEGRAL "LIVE" PART, SHALL HAVE ALL DEFECTIVE PARTS OR <br />MATERIALS REPLACED. <br />5.TEST CABLE INSULATION OF SERVICE AND PANEL FEEDER CONDUCTORS FOR PROPER <br />INSULATION VALUES. TESTS SHALL INCLUDE THE CABLE, ALL SPLICES, AND ALL <br />TERMINATIONS. EACH CONDUCTOR SHALL BE TESTED AND SHALL TEST FREE OF <br />SHORT CIRCUITS AND GROUNDS AND HAVE AN INSULATION VALUE NOT LESS THAN <br />ELECTRICAL CODE STANDARDS. TAKE READINGS BETWEEN CONDUCTORS, AND <br />BETWEEN CONDUCTORS AND GROUND. <br />6.IF THE RESULTS OBTAINED IN THE TESTS ARE NOT SATISFACTORY, MAKE <br />ADJUSTMENTS, REPLACEMENTS, AND CHANGES AS NEEDED. THEN REPEAT THE <br />TESTS, AND MAKE ADDITIONAL TESTS, AS THE ARCHITECT/ENGINEER OR AUTHORITY <br />HAVING JURISDICTION DEEMS NECESSARY. <br />B.IF ANY TEST RESULTS ARE NOT SATISFACTORY, MAKE ADJUSTMENTS, REPLACEMENTS <br />AND CHANGES AS NEEDED AND REPEAT THE TESTS AND MAKE ADDITIONAL TESTS AS THE <br />ARCHITECT/ENGINEER OR AUTHORITY HAVING JURISDICTION DEEM NECESSARY. <br />C.CONTRACTOR SHALL THERMOGRAPHIC STUDY ALL PANELBOARDS AT THE END OF <br />CONSTRUCTION TO IDENTIFY ANY UNUSUAL CONDITIONS/HEATING WITHIN THE <br />EQUIPMENT. COORDINATE WITH OWNER/ARCHITECT/ENGINEER TO HAVE AN <br />OWNER/ARCHITECT/ENGINEER REPRESENTATIVE PRESENT DURING TESTING. <br />READINESS CERTIFICATION PRIOR TO FINAL JOBSITE OBSERVATION <br />TO PREVENT THE FINAL JOB OBSERVATION FROM OCCURRING TOO EARLY, WE REQUIRE THAT THE <br />CONTRACTOR REVIEW THE COMPLETION STATUS OF THE PROJECT AND, BY COPY OF THIS DOCUMENT, <br />CERTIFY THAT THE JOB IS INDEED READY FOR THE FINAL JOB OBSERVATION. THE FOLLOWING IS A <br />TYPICAL LIST OF ITEMS THAT REPRESENT THE DEGREE OF JOB COMPLETENESS EXPECTED PRIOR TO <br />YOUR REQUESTING A FINAL JOB OBSERVATION. <br />1. PENETRATIONS OF FIRE-RATED CONSTRUCTION FIRE SEALED IN ACCORDANCE WITH SPECIFICATIONS. <br />2. ELECTRICAL PANELS HAVE TYPED CIRCUIT IDENTIFICATION. <br />3. PER SECTION 26 05 00, CABLE INSULATION TEST RESULTS HAVE BEEN SUBMITTED. <br />ACCEPTED BY: <br />PRIME CONTRACTOR _______________________________________________ <br />BY ___________________________________ DATE ___________________ <br />UPON CONTRACTOR CERTIFICATION THAT THE PROJECT IS COMPLETE AND READY FOR A FINAL JOB <br />OBSERVATION, WE REQUIRE THE CONTRACTOR TO SIGN THIS AGREEMENT AND RETURN IT TO THE <br />ARCHITECT/ENGINEER SO THAT THE FINAL OBSERVATION CAN BE SCHEDULED. <br />END OF SECTION <br />ELECTRICAL SPECIFICATIONS TABLE OF CONTENT <br />• SECTION 26 05 00 -BASIC ELECTRICAL REQUIREMENTS <br />• SECTION 26 05 05 -ELECTRICAL DEMOLITION FOR REMODELING <br />C.MARK DRAWINGS AND SPECIFICATIONS TO INDICATE APPROVED SUBSTITUTIONS; CHANGE <br />ORDERS, AND ACTUAL EQUIPMENT AND MATERIALS USED. ALL CHANGE ORDERS, RFI <br />RESPONSES, CLARIFICATIONS AND OTHER SUPPLEMENTAL INSTRUCTIONS SHALL BE <br />MARKED ON THE DOCUMENTS. RECORD DOCUMENTS THAT MERELY REFERENCE THE <br />EXISTENCE OF THE ABOVE ITEMS ARE NOT ACCEPTABLE. SHOULD THIS CONTRACTOR FAIL <br />TO COMPLETE RECORD DOCUMENTS AS REQUIRED BY THIS CONTRACT, THIS <br />CONTRACTOR SHALL REIMBURSE ARCHITECT/ENGINEER FOR ALL COSTS TO DEVELOP <br />RECORD DOCUMENTS THAT COMPLY WITH THIS REQUIREMENT. REIMBURSEMENT SHALL <br />BE MADE AT THE ARCHITECT/ENGINEER'S HOURLY RATES IN EFFECT AT THE TIME OF <br />WORK. <br />D.RECORD CHANGES DAILY AND KEEP THE MARKED DRAWINGS AVAILABLE FOR THE <br />ARCHITECT/ENGINEER'S EXAMINATION AT ANY NORMAL WORK TIME. <br />E.UPON COMPLETING THE JOB, AND BEFORE FINAL PAYMENT IS MADE, GIVE THE MARKED- <br />UP DRAWINGS TO THE ARCHITECT/ENGINEER. <br />3.6 PAINTING <br />A.PAINT ALL EQUIPMENT THAT IS MARRED OR DAMAGED PRIOR TO THE OWNER'S <br />ACCEPTANCE. PAINT AND COLOR SHALL MATCH ORIGINAL EQUIPMENT PAINT AND SHALL <br />BE OBTAINED FROM THE EQUIPMENT SUPPLIER IF AVAILABLE. ALL EQUIPMENT SHALL <br />HAVE A FINISHED COAT OF PAINT APPLIED UNLESS SPECIFICALLY ALLOWED TO BE <br />PROVIDED WITH A PRIME COAT ONLY. <br />SECTION 26 05 05 -ELECTRICAL DEMOLITION FOR <br />REMODELING <br />PART 1 -GENERAL <br />1.1 SECTION INCLUDES <br />A.ELECTRICAL DEMOLITION <br />PART 2 -PRODUCTS <br />2.1 MATERIALS AND EQUIPMENT <br />A.MATERIALS AND EQUIPMENT FOR PATCHING AND EXTENDING WORK SHALL BE AS <br />SPECIFIED IN INDIVIDUAL SECTIONS. <br />PART 3 -EXECUTION <br />3.1 EXAMINATION <br />A.THE DRAWINGS ARE INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO <br />NOT INDICATE EVERY BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE <br />CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING <br />CONDITIONS. <br />B.WHERE WALLS, CEILINGS, STRUCTURES, ETC., ARE INDICATED AS BEING REMOVED ON <br />GENERAL OR ELECTRICAL DRAWINGS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />THE REMOVAL OF ALL ELECTRICAL EQUIPMENT, DEVICES, FIXTURES, RACEWAYS, WIRING, <br />SYSTEMS, ETC., FROM THE REMOVED AREA. <br />C.COORDINATE SCOPE OF WORK WITH ALL OTHER CONTRACTORS AND THE OWNER AT THE <br />PROJECT SITE. SCHEDULE REMOVAL OF EQUIPMENT AND ELECTRICAL SERVICE TO AVOID <br />CONFLICTS. <br />D.BID SUBMITTAL SHALL MEAN THE CONTRACTOR HAS VISITED THE PROJECT SITE AND HAS <br />VERIFIED EXISTING CONDITIONS AND SCOPE OF WORK. <br />3.2 PREPARATION <br />A.THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE OWNER BEFORE TURNING OFF <br />POWER TO CIRCUITS, FEEDERS, PANELS, ETC. COORDINATE ALL OUTAGES WITH OWNER. <br />B.PROVIDE TEMPORARY WIRING AND CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN <br />SERVICE DURING CONSTRUCTION. WHEN WORK MUST BE PERFORMED ON ENERGIZED <br />EQUIPMENT OR CIRCUITS, USE PERSONNEL EXPERIENCED IN SUCH OPERATIONS. ASSUME <br />ALL EQUIPMENT AND SYSTEMS MUST REMAIN OPERATIONAL UNLESS SPECIFICALLY <br />NOTED OTHERWISE ON DRAWINGS. <br />C.DISCONNECT ELECTRICAL SYSTEMS IN WALLS, FLOORS, STRUCTURES, AND CEILINGS <br />SCHEDULED FOR REMOVAL. <br />3.3 DEMOLITION AND EXTENSION OF EXISTING ELECTRICAL WORK <br />A.DEMOLISH AND EXTEND EXISTING ELECTRICAL WORK UNDER PROVISIONS OF DIVISION 1 <br />OF SPECIFICATIONS AND THIS SECTION. <br />B.REMOVE, RELOCATE, AND EXTEND EXISTING INSTALLATIONS TO ACCOMMODATE NEW <br />CONSTRUCTION. <br />C.REMOVE EXPOSED ABANDONED RACEWAY, INCLUDING ABANDONED RACEWAY ABOVE <br />ACCESSIBLE CEILING FINISHES. CUT RACEWAY FLUSH WITH WALLS AND FLOORS, AND <br />PATCH SURFACES. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ETC. <br />ASSOCIATED WITH RACEWAY REMOVAL. <br />D.DISCONNECT AND REMOVE OUTLETS AND DEVICES THAT ARE TO BE DEMOLISHED. <br />REMOVE OUTLET OR DEVICES' ASSOCIATED BACK BOX, SUPPORTS, AND CONDUIT AND <br />CONDUCTORS BACK TO SOURCE. PATCH OPENING CREATED FROM REMOVAL OF DEVICE <br />TO MATCH SURROUNDING FINISHES. <br />E.REPAIR ADJACENT CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION AND <br />EXTENSION WORK. PATCH OPENINGS TO MATCH EXISTING SURROUNDING FINISHES. <br />F.MAINTAIN ACCESS TO EXISTING ELECTRICAL INSTALLATIONS THAT REMAIN ACTIVE. <br />MODIFY INSTALLATION OR PROVIDE JUNCTION BOXES AND ACCESS PANEL AS <br />APPROPRIATE. <br />G.EXTEND EXISTING INSTALLATIONS USING MATERIALS AND METHODS COMPATIBLE WITH <br />EXISTING ELECTRICAL INSTALLATIONS, OR AS SPECIFIED. EXTENDED CONDUIT AND <br />CONDUCTORS TO MATCH EXISTING SIZE AND MATERIAL. <br />H.THIS CONTRACTOR IS RESPONSIBLE FOR ALL COSTS INCURRED IN REPAIR, RELOCATIONS, <br />OR REPLACEMENT OF ANY CABLES, CONDUITS, OR OTHER SERVICES IF DAMAGED <br />WITHOUT PROPER INVESTIGATION. <br />3.4 CLEANING AND REPAIR <br />A.CLEAN AND REPAIR EXISTING MATERIALS AND EQUIPMENT THAT REMAIN OR ARE TO BE <br />REUSED. <br />B.PANELBOARDS: CLEAN EXPOSED SURFACES AND CHECK TIGHTNESS OF ELECTRICAL <br />CONNECTIONS. REPLACE DAMAGED CIRCUIT BREAKERS AND PROVIDE CLOSURE PLATES <br />FOR VACANT POSITIONS. PROVIDE TYPED CIRCUIT DIRECTORY SHOWING REVISED <br />CIRCUITING ARRANGEMENT. <br />C.ELECTRICAL ITEMS (E.G., LIGHTING FIXTURES, RECEPTACLES, SWITCHES, CONDUIT, WIRE, <br />ETC.) REMOVED AND NOT RELOCATED REMAIN THE PROPERTY OF THE OWNER. <br />CONTRACTOR SHALL PLACE ITEMS RETAINED BY THE OWNER IN A LOCATION <br />COORDINATED WITH THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE <br />DISPOSAL OF MATERIAL THE OWNER DOES NOT WANT. <br />3.5 INSTALLATION <br />A.INSTALL RELOCATED MATERIALS AND EQUIPMENT UNDER THE PROVISIONS OF DIVISION 1 <br />OF SPECIFICATIONS. <br />END OF SECTION <br />No. Revisions Date <br />pl <br />a <br />n <br /> <br />c <br />h <br />e <br />c <br />k <br /> <br />s <br />u <br />b <br />m <br />i <br />t <br />t <br />a <br />l