My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2120 3%4 S Bristol St WCC02 - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bristol St
>
2120 3/4 S Bristol St Unit# WCC02
>
2120 3%4 S Bristol St WCC02 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 5:00:12 AM
Creation date
4/17/2026 5:00:06 AM
Metadata
Fields
Template:
Plan
Permit Number
20188147
Full Address
2120 3/4 S Bristol St Unit# WCC02
Street Number
2120
Partial
3/4
Street Direction
S
Street Name
Bristol
Street Suffix
St
Unit Number
WCC02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> Page 32 of 111 <br /> <br />Report No.: 2410B0143SHA-001 <br /> <br />TRF No. ANSI/CAN/UL 9540A_Unit <br /> <br />ANSI/CAN/UL 9540A <br />Clause Requirement – Test Result - Remark Verdict <br /> k) Separation distances from the initiating BESS unit <br />to target walls; See Attachment 3 Pass <br /> l) Separation distances from the initiating BESS unit <br />to target BESS units; See Attachment 3 Pass <br /> <br />m) The maximum wall surface and target BESS <br />temperatures achieved during the test and the <br />location of the measuring thermocouple; <br />See Attachment 6 Pass <br /> <br />n) The maximum ceiling or soffit surface <br />temperatures achieved during the indoor or <br />outdoor wall mounted test and the location of the <br />measuring thermocouple; <br />Ground mounted N/A <br /> o) The maximum incident heat flux on target wall <br />surfaces and target BESS units; See Attachment 7 Pass <br /> <br />p) The maximum incident heat flux on target ceiling or <br />soffit surfaces achieved during the indoor or <br />outdoor wall mounted test; <br />Ground mounted N/A <br /> q) Gas generation and composition data See Attachment 10 Pass <br /> r) Peak smoke release rate and total smoke release <br />data; See Attachment 11 Pass <br /> <br />s) Indication of the activation of integral fire protection <br />systems and if activated the time into the test at <br />which activation occurred; <br />No Integral fire protection <br />systems installed for the test. N/A <br /> t) Observation of flying debris or explosive discharge <br />of gases; See Attachment 5 Pass <br /> u) Observation of re-ignition(s) from thermal runaway <br />events; See Attachment 5 Pass <br /> v) Observation(s) of sparks, electrical arcs, or other <br />electrical events; See Attachment 5 Pass <br /> w) Observations of the damage to: See Attachment 1 Pass <br /> 1) The initiating BESS unit; See Attachment 1 Pass <br /> 2) Target BESS units; See Attachment 1 Pass <br /> 3) Adjacent walls, ceilings, or soffits; and See Attachment 1 Pass <br /> x) Photos and video of the test. See Attachment 1 and video <br />2410B0143SHA-001-1~-3.mp4 Pass <br />9.8 Performance at unit level testing -- <br />9.8.1 Installation level testing in Section 10 is not required if the performance conditions outlined <br />in Table 9.1 are met during the unit level test. Pass <br /> Non-Residential Installations -- <br />Indoor <br />Floor <br />Mounted <br />a) Flaming outside the initiating BESS unit is not <br />observed; N/A <br />b) Surface temperatures of modules within the target <br />BESS units adjacent to the initiating BESS unit do N/A
The URL can be used to link to this page
Your browser does not support the video tag.