Laserfiche WebLink
<br /> <br /> Page 31 of 111 <br /> <br />Report No.: 2410B0143SHA-001 <br /> <br />TRF No. ANSI/CAN/UL 9540A_Unit <br /> <br />ANSI/CAN/UL 9540A <br />Clause Requirement – Test Result - Remark Verdict <br />gases need not be measured. <br />9.7 Unit level test report -- <br />9.7.1 The report on the unit level testing shall identify the type of installation being tested, as <br />follows: Pass <br /> a) Indoor floor mounted non-residential use BESS; N/A <br /> b) Indoor floor mounted residential use BESS; N/A <br /> c) Outdoor ground mounted non-residential use <br />BESS; Pass <br /> d) Outdoor ground mounted residential use BESS; N/A <br /> e) Indoor wall mounted non-residential use BESS; N/A <br /> f) Indoor wall mounted residential use BESS; N/A <br /> g) Outdoor wall mounted non-residential use BESS; N/A <br /> h) Outdoor wall mounted residential use BESS; N/A <br /> i) Rooftop installed non-residential use BESS; or Pass <br /> j) Open garage installed non-residential use BESS. Pass <br />9.7.2 If testing is intended to represent more than one <br />installation type, this shall be noted in the report. See unit information Pass <br />9.7.3 The report shall include the following, as applicable: Pass <br /> a) Unit manufacturer name and model number (and <br />whether UL 9540 compliant); See Unit information Pass <br /> b) Number of modules in the initiating BESS unit; See Unit information Pass <br /> c) The construction of the initiating BESS unit per 5.3; See Unit information Pass <br /> d) Fire protection features/detection/suppression <br />systems within unit; <br />Smoke detector and temperature <br />sensor within unit Pass <br /> e) Module voltage(s) corresponding to the tested <br />SOC; See Attachment 2 Pass <br /> f) The thermal runaway initiation method used; See Attachment 4 Pass <br /> g) Location of the initiating module within the BESS <br />unit; See Attachment 3 Pass <br /> <br />h) Diagram and dimensions of the test setup including <br />mounting location of the initiating and target BESS <br />units, and the locations of walls, ceilings, and <br />soffits; <br />See Attachment 3 Pass <br /> <br />i) Observation of any flaming outside the initiating <br />BESS enclosure and the maximum flame <br />extension; <br />See Attachment 5 Pass <br /> j) Chemical and convective heat release rate versus <br />time data; <br />See Attachment 8 and attachment <br />9 Pass