My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2120 3%4 S Bristol St WCC02 - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Bristol St
>
2120 3/4 S Bristol St Unit# WCC02
>
2120 3%4 S Bristol St WCC02 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 5:00:12 AM
Creation date
4/17/2026 5:00:06 AM
Metadata
Fields
Template:
Plan
Permit Number
20188147
Full Address
2120 3/4 S Bristol St Unit# WCC02
Street Number
2120
Partial
3/4
Street Direction
S
Street Name
Bristol
Street Suffix
St
Unit Number
WCC02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1 –Product Characteristics and Site Verification Aspects <br />Input Factor Specific Characteristic <br />Product energy capacity <br />and power <br />38.4 kWh,800 Ah,48.0 V (per B160,2 pcs of <br />B160 can be connected to one E6160) <br />Nature of the personnel <br />presence <br />Normally unattended location,on a rooftop of <br />an occupied building in a populated area,or <br />ground based at a protected <br />telecommunications cell site. <br />Energy types and <br />volatility <br />Batteries utilizing Lithium-Iron-Phosphate <br />(LFP)cells <br />Equipment <br />availability/redundancy <br />Due to small scale of the installation,no <br />equipment redundancy is anticipated. <br />Availability of water <br />supply <br />Assumed to be available for firefighting either <br />by first responder supplied water or municipal <br />system. <br />Capability of emergency <br />responders <br />As deployments are mostly in populated <br />areas,it is assumed capable first responders <br />are available. <br />Storage configuration <br />(e.g.,short term and long <br />term) <br />B160 Enclosures are shipped and installed at <br />the site without batteries.Short-term and <br />long-term storage risks are minimized by <br />battery delivery and installation only after the <br />enclosures are installed at the site and <br />protection measures are in place.The battery <br />shipments comply with UN 38.3 which <br />addresses the shipment of lithium-ion <br />batteries to further increase safety. <br />Historical loss <br />information/lessons <br />learned <br />Experience has shown that sealed cabinets <br />containing lithium-ion batteries create an <br />explosion risk when gasses from cell venting <br />are not dispersed.Therefore the B160 <br />cabinet is provided with four pressure relief <br />valves and fans to disperse cell vent gasses <br />from the enclosure for this reason. <br />Confidentiality Class External Confidentiality Label Document Type Page <br />Ericsson Internal Analysis 6 (27) <br />Prepared By (Subject Responsible)Approved By (Document Responsible)Checked <br />ERATLEN Thomas Lennholm <br />Document Number Revision Date Reference <br />1785-BFM 107 220/1 Uen PA2 2025-06-03
The URL can be used to link to this page
Your browser does not support the video tag.