My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3001 S Susan St - Soils Report
PBA
>
Building
>
Soils Reports
>
S
>
Susan St
>
3001 S Susan St
>
3001 S Susan St - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2021 11:10:02 AM
Creation date
9/16/2021 11:09:54 AM
Metadata
Fields
Template:
Soils Report
Full Address
3001 S Susan St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Our Job 81-20-00 Page B- 5 <br />After completion of the operations requiring <br />Consultant's services, a Final Report of Geotechnical <br />Inspection and Testing i+i11 be issued. This report ui11 <br />present a summary discussion of all work perforned and <br />include the Consultantrs conclusions relative to the suit- <br />ability of the r+ork and conpli ance r+ith geotechnical aspects <br />of plans and specifications. Recommendations for foundation <br />design and the results of laboratory and field tests per- <br />forned during the uork operation will also be presented. <br />4.0 S I TE PREPARAT I ON <br />4.1 DEBRIS REI',O\IAL <br />Al 1 deleterious rnaterial , e.8. , lumber, logs , <br />pipes, brush including roots and rubbish, shal1 be removed <br />from the site. <br />A11 soil or rock material deemed unsuitable as a <br />fill or structure foundation material or for placement in <br />a compacted fill sha11 be stripped and exported frorn the <br />job site. Any foreign material, such as concrete, asphaltic <br />concrete, plaster, or import material contemplated for <br />incorporation with soil rnaterial in fifl masses ' must be <br />specifically approved by the Consultant prior to placement. <br />Any existing underground structures, such as <br />cisterns, septic tanks, we11s irriSation 1ines, etc., are <br />to be renoved in accordance with criteria provided by the <br />Project Engineer and/or the Consultant. The removal of <br />existing underground structures is generall.y discussed in
The URL can be used to link to this page
Your browser does not support the video tag.