Laserfiche WebLink
Our Job 81-20-00 <br />the body <br />prepared <br />4.? <br />Page <br />of this report or in the plans and specifications <br />by the Project Engineer. <br />All stripping and removal operations are to be <br />under the inspection and testing of the Consultant.performed <br />STR, IPPING <br />Stripping shal1 be considered to be the removal of <br />soil and rock material which is unsuitable for use in its <br />present condition. Unless otherwise specified in the <br />gation report, the material may be considered suitable <br />use as compacted f i11. lt'here stripping is recommended <br />investigation report, either detailed criteria will be <br />included or reference to one or more of the follor+ing <br />will be provided: <br />Plate B-6.1 - Stripping Detail - Removal of <br />Daylight Line <br />Plate B-6.2 - Stripping Detail - Existing <br />Canyon Fi11 <br />1n\rest1- <br />for <br />in the <br />standards <br />Plate B-6.3 St ripping Detai 1 <br />Canyon Fi 1 1 <br />Existing <br />Plate B- 6.4 Stabil Lzation <br />4.3 TREATMENT OF AREAS TO RECE IVE F I LL <br />The ground surface to receive fill shall be Pre- <br />pared by plouing or scarifying to a minimum depth of six <br />inches and/or until it is free of ruts, hummocks or other <br />uneven features which would inhibit uniform comPaction. <br />The scarified zone should then be brought to near optimun <br />moisture content, rnixed as required and compacted to a <br />St ripping Det a i 1 <br />Fi11 <br />-6