Laserfiche WebLink
8.0 <br />Our Job 81-20-00 Page B- 14 <br />on the site. The Contractor shal1 provide erosion control <br />measures and take remedial measures to prevent erosion <br />of freshly graded areas. After completion of grading and <br />after the Consultant has finished his observations of the <br />work, Do further excavation or filling sha11 be done except <br />with the approval of the Consultant. <br />CUT SLOPES <br />A11 cut slopes which nay be affected by geologic <br />conditions will be inspected by the Consultant at vertical <br />intervals not exceeding ten feet. It sha11 be the respon- <br />sibility of the Contractor to notif,v the Consultant when <br />cut slopes are started and when the ten-feet intervals are <br />ant i cipated. <br />If, during the work, adverse or potentially adverse <br />geologic conditions are encountered which were not anticipated <br />in the investigation report, the Consultant sha11 pronptll' <br />investigate, analyze, and make recommendations for treatment. <br />Unless otherwise specified in the investigation <br />report, Do cut slopes shall be excavated higher or steePer <br />than that allowed by the ordinances of controlling govern- <br />mental agencies.