|
10
<br />
<br />
<br />E
<br />d
<br />e
<br />l
<br />m
<br />a
<br />n
<br />Ir
<br />v
<br />i
<br />n
<br />e
<br />,
<br />
<br />C
<br />A
<br />,
<br />
<br />9
<br />2
<br />6
<br />1
<br />8
<br />P
<br />9
<br />4
<br />9
<br />.
<br />6
<br />6
<br />0
<br />.
<br />9
<br />1
<br />2
<br />8
<br />
<br />
<br />
<br />JOB NO.:
<br />DRAWN BY.:
<br />PA/PM:
<br />SHEET
<br />TH
<br />E
<br />S
<br />E
<br />
<br />D
<br />R
<br />A
<br />W
<br />I
<br />N
<br />G
<br />S
<br />
<br />A
<br />N
<br />D
<br />
<br />S
<br />P
<br />E
<br />C
<br />I
<br />F
<br />I
<br />C
<br />A
<br />T
<br />I
<br />O
<br />N
<br />S
<br />
<br />A
<br />R
<br />E
<br />
<br />T
<br />H
<br />E
<br />
<br />P
<br />R
<br />O
<br />P
<br />E
<br />R
<br />T
<br />Y
<br />
<br />AN
<br />D
<br />
<br />C
<br />O
<br />P
<br />Y
<br />R
<br />I
<br />G
<br />H
<br />T
<br />
<br />O
<br />F
<br />
<br />W
<br />A
<br />R
<br />E
<br />
<br />M
<br />A
<br />L
<br />C
<br />O
<br />M
<br />B
<br />
<br />A
<br />N
<br />D
<br />
<br />S
<br />H
<br />A
<br />L
<br />L
<br />
<br />N
<br />O
<br />T
<br />
<br />B
<br />E
<br />
<br />U
<br />S
<br />E
<br />D
<br /> O
<br />N
<br />
<br />A
<br />N
<br />Y
<br />
<br />O
<br />T
<br />H
<br />E
<br />R
<br />
<br />W
<br />O
<br />R
<br />K
<br />
<br />E
<br />X
<br />C
<br />E
<br />PT
<br />
<br />B
<br />Y
<br />
<br />A
<br />G
<br />R
<br />E
<br />E
<br />M
<br />E
<br />N
<br />T
<br />
<br />W
<br />I
<br />T
<br />H
<br />
<br />W
<br />A
<br />R
<br />E
<br />
<br />M
<br />A
<br />L
<br />C
<br />O
<br />M
<br />B
<br />.
<br />
<br />W
<br />R
<br />I
<br />T
<br />T
<br />E
<br />N
<br />
<br />D
<br />I
<br />M
<br />E
<br />N
<br />S
<br />I
<br />O
<br />NS
<br />
<br />S
<br />H
<br />A
<br />L
<br />L
<br />
<br />T
<br />A
<br />K
<br />E
<br />
<br />P
<br />R
<br />E
<br />C
<br />E
<br />D
<br />E
<br />N
<br />C
<br />E
<br />
<br />O
<br />V
<br />E
<br />R
<br />
<br />S
<br />C
<br />A
<br />L
<br />E
<br />D
<br />
<br />D
<br />I
<br />M
<br />E
<br />N
<br />S
<br />I
<br />O
<br />N
<br />S
<br />
<br />A
<br />N
<br />D
<br /> S
<br />H
<br />A
<br />L
<br />L
<br />
<br />B
<br />E
<br />
<br />V
<br />E
<br />R
<br />I
<br />F
<br />I
<br />E
<br />D
<br />
<br />O
<br />N
<br />
<br />T
<br />HE
<br />
<br />J
<br />O
<br />B
<br />S
<br />I
<br />T
<br />E
<br />.
<br />
<br />A
<br />N
<br />Y
<br />
<br />D
<br />I
<br />S
<br />C
<br />R
<br />E
<br />P
<br />A
<br />N
<br />C
<br />Y
<br />
<br />S
<br />H
<br />A
<br />L
<br />L
<br />
<br />B
<br />E
<br />
<br />B
<br />R
<br />O
<br />U
<br />G
<br />H
<br />T
<br />
<br />T
<br />O
<br />
<br />T
<br />H
<br />E
<br />
<br />N
<br />O
<br />T
<br />IC
<br />E
<br />
<br />O
<br />F
<br />
<br />W
<br />A
<br />R
<br />E
<br />
<br />M
<br />A
<br />L
<br />C
<br />O
<br />M
<br />B
<br />
<br />P
<br />R
<br />I
<br />O
<br />R
<br />
<br />T
<br />O
<br />
<br />T
<br />H
<br />E
<br />
<br />C
<br />O
<br />M
<br />M
<br />E
<br />N
<br />C
<br />E
<br />M
<br />E
<br />N
<br />T
<br />
<br />O
<br />F
<br />
<br />A
<br />N
<br />Y
<br />W
<br />O
<br />R
<br />K
<br />CAUTION:IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT
<br />Au
<br />t
<br />o
<br />d
<br />e
<br />s
<br />k
<br />
<br />D
<br />o
<br />c
<br />s
<br />:
<br />/
<br />/
<br />I
<br />R
<br />V
<br />2
<br />5
<br />-
<br />6
<br />0
<br />1
<br />7
<br />-
<br />0
<br />0
<br />_
<br />F
<br />u
<br />j
<br />i
<br />
<br />F
<br />i
<br />s
<br />i
<br />
<br />-
<br />I
<br />r
<br />v
<br />i
<br />n
<br />e
<br />
<br />S
<br />c
<br />i
<br />
<br />2
<br />5
<br />0
<br />1
<br />
<br />P
<br />u
<br />l
<br />l
<br />m
<br />a
<br />n
<br />/
<br />6
<br />0
<br />1
<br />7
<br />_
<br />A
<br />R
<br />C
<br />H
<br />-
<br />T
<br />I
<br />.
<br />r
<br />v
<br />t
<br />3/
<br />5
<br />/
<br />2
<br />0
<br />2
<br />6
<br />
<br />1
<br />1
<br />:
<br />5
<br />1
<br />:
<br />0
<br />5
<br />
<br />A
<br />M
<br />Approver
<br />Author
<br />IRV25-6017
<br />CA
<br />L
<br />G
<br />R
<br />E
<br />E
<br />N
<br />
<br />N
<br />O
<br />T
<br />E
<br />S
<br />I032
<br />FU
<br />J
<br />I
<br />F
<br />I
<br />L
<br />M
<br />
<br />-
<br />FI
<br />S
<br />I
<br />25
<br />0
<br />1
<br />
<br />P
<br />U
<br />L
<br />L
<br />M
<br />A
<br />N
<br />
<br />S
<br />T
<br />
<br />S
<br />U
<br />I
<br />T
<br />E
<br />
<br />2
<br />0
<br />1
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />5
<br />5.505.1 INDOOR MOISTURE CONTROL
<br />N/A
<br />5.506.1 OUTSIDE AIR DELIVERY.
<br />N/A
<br />5.506.2 CARBON DIOXIDE (CO2) MONITORING.
<br />N/A
<br />5.507.4 ACOUSTICAL CONTROL
<br />N/A
<br />5.507.4.1 EXTERIOR NOISE TRANSMISSION, PRESCRIPTIVE
<br />METHOD
<br />BUILDINGS SHALL MEET OR EXCEED THE PROVISIONS OF CALIFORNIA BUILDING CODE,
<br />CCR, TITLE 24, PART 2, SECTIONS 1202 (VENTILATION) AND CHAPTER 14 (EXTERIOR
<br />WALLS). FOR ADDITIONAL MEASURES, SEE SECTION 5.407.2 OF THIS CODE.
<br />FOR MECHANICALLY OR NATURALLY VENTILATED SPACES IN BUILDINGS, MEET THE
<br />MINIMUM REQUIREMENTS OF SECTION 120.1 (REQUIREMENTS FOR VENTILATION) OF THE
<br />CALIFORNIA ENERGY CODE, OR THE APPLICABLE LOCAL CODE, WHICHEVER IS MORE
<br />STRINGENT, AND DIVISION 1, CHAPTER 4 OF CCR, TITLE 8.
<br />FOR BUILDINGS OR ADDITIONS EQUIPPED WITH DEMAND CONTROL VENTILATION, CO2
<br />SENSORS AND VENTILATION CONTROLS SHALL BE SPECIFIED AND INSTALLED IN
<br />ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENERGY CODE, SECTION
<br />120.1(c)(4).
<br />EMPLOY BUILDING ASSEMBLIES AND COMPONENTS WITH SOUND TRANSMISSION CLASS
<br />(STC) VALUES DETERMINED IN ACCORDANCE WITH ASTM E 90 AND ASTM E 413 OR
<br />OUTDOOR-INDOOR SOUND TRANSMISSION CLASS (OITC) DETERMINED IN ACCORDANCE
<br />WITH ASTM E 1332, USING EITHER THE PRESCRIPTIVE OR PERFORMANCE METHOD IN
<br />SECTION 5.507.4.1 OR 5.507.4.2.
<br />EXCEPTION:BUILDINGS WITH FEW OR NO OCCUPANTS OR WHERE OCCUPANTS ARE NOT
<br />LIKELY TO BE AFFECTED BY EXTERIOR NOISE, AS DETERMINED BY THE ENFORCEMENT
<br />AUTHORITY, SUCH AS FACTORIES, STADIUMS, STORAGE, ENCLOSED PARKING
<br />STRUCTURES AND UTILITY BUILDINGS.
<br />EXCEPTION: [DSA-SS]FOR PUBLIC SCHOOLS AND COMMUNITY COLLEGES, THE
<br />REQUIREMENTS OF THIS SECTION AND ALL SUBSECTIONS APPLY ONLY TO NEW
<br />CONSTRUCTION.
<br />WALL AND ROOF-CEILING ASSEMBLIES EXPOSED TO THE NOISE SOURCE MAKING UP
<br />THE BUILDING OR ADDITION ENVELOPE OR ALTERED ENVELOPE SHALL MEET A
<br />COMPOSITE STC RATING OF AT LEAST 50 OR A COMPOSITE OITC RATING OF NO LESS
<br />THAN 40, WITH EXTERIOR WINDOWS OF A MINIMUM STC OF 40 OR OITC OF 30 IN THE
<br />FOLLOWING LOCATIONS:
<br />1. WITHIN THE 65 CNEL NOISE CONTOUR OF AN AIRPORT.
<br />EXCEPTIONS:
<br />1. LDN OR CNEL FOR MILITARY AIRPORTS SHALL BE DETERMINED
<br /> BY THE FACILITY AIR INSTALLATION COMPATIBLE LAND USE ZONE
<br /> (AICUZ) PLAN.
<br />2. LDN OR CNEL FOR OTHER AIRPORTS AND HELIPORTS FOR
<br /> WHICH A LAND USE PLAN HAS NOT BEEN DEVELOPED SHALL BE
<br /> DETERMINED BY THE LOCAL GENERAL PLAN NOISE ELEMENT.
<br />2. WITHIN THE 65 CNEL OR LDN NOISE CONTOUR OF A FREEWAY OR
<br /> EXPRESSWAY, RAILROAD, INDUSTRIAL SOURCE OR FIXED-GUIDEWAY
<br /> SOURCE AS DETERMINED BY THE NOISE ELEMENT OF THE GENERAL PLAN.
<br />5.504.7 ENVIRONMENTAL TOBACCO SMOKE (ETS) CONTROL.
<br />WHERE OUTDOOR AREAS ARE PROVIDED FOR SMOKING, PROHIBIT SMOKING
<br />WITHIN 25 FEET OF BUILDING ENTRIES, OUTDOOR AIR INTAKES AND OPERABLE
<br />WINDOWS AND WITHIN THE BUILDING AS ALREADY PROHIBITED BY OTHER LAWS OR
<br />REGULATIONS; OR AS ENFORCED BY ORDINANCES, REGULATIONS OR POLICIES OF
<br />ANY CITY, COUNTY, CITY AND COUNTY, CALIFORNIA COMMUNITY COLLEGE,
<br />CAMPUS OF THE CALIFORNIA STATE UNIVERSITY, OR CAMPUS OF THE UNIVERSITY
<br />OF CALIFORNIA, WHICHEVER ARE MORE STRINGENT. WHEN ORDINANCES,
<br />REGULATIONS OR POLICIES ARE NOT IN PLACE, POST SIGNAGE TO INFORM
<br />BUILDING OCCUPANTS OF THE PROHIBITATIONS.
<br />N/A
<br />N/A
<br />TABLE 5.504.4.3
<br />VOC CONTENT LIMITS FOR ARCHITECTURAL COATINGS
<br />GRAMS OF VOC PER LITER OF COATING, LESS WATER
<br />AND LESS EXEMPT COMPOUNDS
<br />SUBMITTAL AVAILABLE UPON REQUEST.
<br />5.504.4.4 CARPET SYSTEMS.
<br />ALL CARPET INSTALLED IN THE BUILDING INTERIOR SHALL MEET THE REQUIREMENTS OF
<br />THE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH, "STANDARD METHOD FOR THE TESTING
<br />AND EVALUATION OF VOLATILE ORGANIC CHEMICAL EMISSIONS FROM INDOOR SOURCES
<br />USING ENVIRONMENTAL CHAMBERS," VERSION 1.2, JANUARY 2017 (EMISSION TESTING
<br />METHOD FOR CALIFORNIA SPECIFICATION 01350).
<br />5.504.4.4.2 CARPET ADHESIVE.
<br />ALL CARPET ADHESIVE SHALL MEET THE REQUIREMENTS OF TABLE 5.504.4.1.
<br />5.504.4.5. COMPOSITE WOOD PRODUCTS.
<br />5.504.4.5.3 DOCUMENTATION.
<br />HARDWOOD PLYWOOD, PARTICLEBOARD AND MEDIUM DENSITY FIBERBOARD COMPOSITE
<br />WOOD PRODUCTS USED ON THE INTERIOR OR EXTERIOR OF THE BUILDING SHALL MEET
<br />THE REQUIREMENTS FOR FORMALDEHYDE AS SPECIFIED IN ARB’S AIR TOXICS CONTROL
<br />MEASURE (ATCM) FOR COMPOSITE WOOD (17 CCR 93120 ET SEQ.) THOSE MATERIALS NOT
<br />EXEMPTED UNDER THE ATCM MUST MEET THE SPECIFIED EMISSION LIMITS,AS SHOWN IN
<br />TABLE 5.504.4.5.
<br />SEE ARCHITECTURAL SPECIFICATIONS.
<br />VERIFICATION OF COMPLIANCE WITH THIS SECTION SHALL BE PROVIDED AS
<br />REQUESTED BY THE ENFORCING AGENCY. DOCUMENTATION SHALL INCLUDE AT
<br />LEAST ONE OF THE ITEMS 1 THROUGH 5 LISTED IN SECTION 5.504.4.5.3.
<br />1. PRODUCT CERTIFICATIONS AND SPECIFICATIONS.
<br />2. CHAIN OF CUSTODY CERTIFICATIONS.
<br />3. PRODUCT LABELED AND INVOICED AS MEETING THE COMPOSITE WOOD
<br /> PRODUCTS REGULATION (SEE CCR, TITLE 17, SECTION 93120, ET SEQ.).
<br />4. EXTERIOR GRADE PRODUCTS MARKED AS MEETING THE PS-1 OR PS-2
<br /> STANDARDS OF THE ENGINEERED WOOD ASSOCIATION, THE AUSTRALIAN
<br /> AS/NZS 2269 OR EUROPEAN 636 3S STANDARDS.
<br />5. OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY.
<br />DOCUMENTATION AVAILABLE UPON REQUEST.
<br />5.504.4.6.1 VERIFICATION OF COMPLIANCE.
<br />DOCUMENTATION SHALL BE PROVIDED VERIFYING THAT RESILIENT FLOORING
<br />MATERIALS MEET THE POLLUTANT EMISSION LIMITS.
<br />AVAILABLE UPON REQUEST.
<br />5.504.5.3 FILTERS.
<br />IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED AREAS OF
<br />THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT
<br />PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 13. MERV 13
<br />FILTERS SHALL BE INSTALLED PRIOR TO OCCUPANCY, AND RECOMMENDATIONS FOR
<br />MAINTENANCE WITH FILTERS OF THE SAME VALUE SHALL BE INCLUDED IN THE OPERATION
<br />AND MAINTENANCE MANUAL.
<br />EXCEPTION:EXISTING MECHANICAL EQUIPMENT.
<br />SEE MECHANICAL DRAWINGS.
<br />TABLE 5.504.4.5
<br />FORMALDEHYDE LIMITS
<br />MAXIMUM FORMALDEHYDE EMISSIONS IN PARTS PER MILLION.
<br />SEE PROJECT SPECIFICATIONS.
<br />INSTALLED FILTERS SHALL BE CLEARLY LABELED BY THE MANUFACTURER
<br />INDICATING THE MERV RATING.
<br />5.504.5.3.1 LABELING.
<br />COATING CATEGORY CURRENT VOC LIMIT
<br />FLAT COATINGS 50
<br />NONFLAT COATINGS 100
<br />NONFLAT HIGH GLOSS COATINGS 150
<br />SPECIALTY COATINGS
<br />ALUMINUM ROOF COATINGS 400
<br />BASEMENT SPECIALITY COATINGS 400
<br />BITUMINOUS ROOF COATINGS 50
<br />BITUMINOUS ROOF PRIMERS 350
<br />BOND BREAKERS 350
<br />CONCRETE CURING COMPOUNDS 350
<br />CONCRETE/ MASONARY SEALERS 100
<br />DRIVEWAY SEALERS 50
<br />DRY FOG COATINGS 150
<br />FAUX FINISHING COATINGS 350
<br />FIRE RESISTIVE COATINGS 350
<br />FLOOR COATINGS 100
<br />FORM-RELEASE COMPOUNDS 250
<br />GRAPHIC ART COATINGS (SIGN PAINTS)500
<br />HIGH-TEMPERATURE COATINGS 420
<br />INDUSTRIAL MAINTENANCE COATINGS 250
<br />LOW SOLIDS COATINGS 120
<br />MAGNESITE CEMENT COATINGS 450
<br />MASTIC TEXTURE COATINGS 100
<br />METALLIC PIGMENTED COATINGS 500
<br />MULTICOLORS COATINGS 250
<br />PRETREATMENT WASH PRIMERS 420
<br />PRIMERS, SEALERS AND UNDERCOATERS 100
<br />REACTIVE PENETRATING SEALERS 350
<br />RECYCLED COATINGS 250
<br />ROOF COATINGS 50
<br />RUST PREVENTATIVE COATINGS 250
<br />SHELLACS
<br />CLEAR 730
<br />OPAQUE 550
<br />SPECIALITY PRIMERS, SEALERS AND UNDERCOATERS:100
<br />STAINS 250
<br />STONE CONSOLIDANTS 450
<br />SWIMMING POOLS COATING 340
<br />TRAFFIC MARKING COATINGS 100
<br />TUB AND TILE REFINISH COATINGS 420
<br />WATERPROOFING MEMBRANES 250
<br />WOOD COATINGS 275
<br />WOOD PRESERVATIVES 350
<br />ZINC-RICH PRIMERS 340
<br />PRODUCT CURRENT LIMIT
<br />HARDWOOD PLYWOOD VENEER CORE 0.05
<br />HARDWOOD PLYWOOD COMPOSITE CORE 0.05
<br />PARTICLE BOARD 0.09
<br />MEDIUM DENSITY FIBERBOARD 0.11
<br />THIN MEDIUM DENSITY FIBERBOARD 0.13
<br />SEE PROJECT SPECIFICATIONS.
<br />SEE PROJECT SPECIFICATIONS.
<br />5.504.4.4.1 CARPET CUSHION.
<br />ALL CARPET CUSHION INSTALLED IN THE BUILDING INTERIOR SHALL MEET THE
<br />REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH, "STANDARD
<br />METHOD FOR THE TESTING AND EVALUATION OF VOLATILE ORGANIC CHEMICAL
<br />EMISSIONS FROM INDOOR SOURCES USING ENVIRONMENTAL CHAMBERS," VERSION 1.2,
<br />JANUARY 2017 (EMISSION TESTING METHOD FOR CALIFORNIA SPECIFICATION 01350).
<br />2,3
<br />1
<br />1. GRAMS OF VOC PER LITER OF COATING, INCLUDING WATER AND INCLUDING
<br /> EXEMPT COMPOUNDS.
<br />2. THE SPECIFIED LIMITS REMAIN IN EFFECT UNLESS REVISED LIMITS ARE LISTED IN
<br /> SUBSEQUENT COLUMNS IN THE TABLE.
<br />3. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA
<br /> AIR RESOURCES BOARD, ARCHITECTURAL COATINGS SUGGESTED CONTROL
<br /> MEASURE, FEBRUARY 1, 2008. MORE INFORMATION IS AVAILABLE FROM THE AIR
<br /> RESOURCES BOARD.
<br />1
<br />2
<br />1. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA
<br /> AIR RESOURCES BOARD, AIR TOXICS CONTROL MEASURE FOR COMPOSITE WOOD AS
<br /> TESTED IN ACCORDANCE WITH ASTM E1333. FOR ADDITIONAL INFORMATION, SEE
<br /> CALIFORNIA CODE OF REGULATIONS, TITLE 17, SECTIONS 93120 THROUGH 93120.12.
<br />2. THIN MEDIUM DENSITY FIBERBOARD HAS A MAXIMUM THICKNESS OF 5/16 INCH (8 MM).
<br />5.504.4.5.1 EARLY COMPLIANCE.
<br />RESERVED.
<br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH'S WEBSITE FOR
<br />CERTIFICATION PROGRAMS AND TESTING LABS.
<br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx#
<br />material
<br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH'S WEBSITE FOR
<br />CERTIFICATION PROGRAMS AND TESTING LABS.
<br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx#
<br />material
<br />5.504.4.7 THERMAL INSULATION.
<br />COMPLY WITH THE REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF PUBLIC
<br />HEALTH, “STANDARD METHOD FOR THE TESTING AND EVALUATION OF VOLATILE
<br />ORGANIC CHEMICAL EMISSIONS FROM INDOOR SOURCES USING ENVIRONMENTAL
<br />CHAMBERS,”VERSION 1.2, JANUARY 2017 (EMISSION TESTING METHOD FOR
<br />CALIFORNIA SPECIFICATION 01350).
<br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH’S WEBSITE FOR
<br />CERTIFICATION PROGRAMS AND TESTING LABS.
<br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx#
<br />material
<br />5.504.4.7.1 VERIFICATION OF COMPLIANCE.
<br />DOCUMENTATION SHALL BE PROVIDED VERIFYING THAT THERMAL INSULATION
<br />MATERIALS MEET THE POLLUTANT EMISSION LIMITS.
<br />5.504.4. 8 ACOUSTICAL CEILINGS AND WALL PANELS.
<br />COMPLY WITH THE REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF PUBLIC
<br />HEALTH, “STANDARD METHOD FOR THE TESTING AND EVALUATION OF VOLATILE
<br />ORGANIC CHEMICAL EMISSIONS FROM INDOOR SOURCES USING ENVIRONMENTAL
<br />CHAMBERS,”VERSION 1.2, JANUARY 2017 (EMISSION TESTING METHOD FOR
<br />CALIFORNIA SPECIFICATION 01350).
<br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH’S WEBSITE FOR
<br />CERTIFICATION PROGRAMS AND TESTING LABS.
<br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx#
<br />material
<br />5.504.4.8.1 VERIFICATION OF COMPLIANCE.
<br />DOCUMENTATION SHALL BE PROVIDED VERIFYING THAT ACOUSTICAL FINISH
<br />MATERIALS MEET THE POLLUTANT EMISSION LIMITS.
<br />5.504.4.1 ADHESIVES, SEALANTS AND CAULKS.
<br />5.504.4 FINISH MATERIAL POLLUTANT CONTROL.
<br />5.504.3 COVERING OF DUCT OPENINGS AND PROTECTION
<br /> OF MECHANICAL EQUIPMENT DURING CONSTRUCTION.
<br />TABLE 5.504.4.2
<br />SEALANT VOC LIMIT
<br />LESS WATER AND LESS EXEMPT COMPOUNDS IN GRAMS PER LITER
<br />TABLE 5.504.4.1
<br />ADHESIVE VOC LIMIT
<br />LESS WATER AND LESS EXEMPT COMPOUNDS IN GRAMS PER LITER
<br />AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE
<br />CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE HEATING, COOLING
<br />AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR
<br />DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE,
<br />PLASTIC, SHEETMETAL, OR OTHER METHODS ACCEPTABLE TO THE
<br />ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS
<br />WHICH MAY ENTER THE SYSTEM.
<br />FINISH MATERIALS SHALL COMPLY WITH SECTIONS 5.504.4.1 THROUGH
<br />5.504.4.6.
<br />5.504.4.3 PAINTS AND COATINGS.
<br />ARCHITECTURAL PAINTS AND COATINGS SHALL COMPLY WITH VOC LIMITS IN TABLE
<br />1 OF THE ARB ARCHITECTURAL COATINGS SUGGESTED CONTROL MEASURE, AS
<br />SHOWN IN TABLE 5.504.4.3, UNLESS MORE STRINGENT LOCAL LIMITS APPLY. THE
<br />VOC CONTENT LIMIT FOR COATINGS THAT DO NOT MEET THE DEFINITIONS FOR THE
<br />SPECIALTY COATINGS CATEGORIES LISTED IN TABLE 5.504.4.3 SHALL BE
<br />DETERMINED BY CLASSIFYING THE COATING AS A FLAT, NONFLAT OR NONFLAT-
<br />HIGH GLOSS COATING, BASED ON ITS GLOSS, AS DEFINED IN SUBSECTIONS 4.21,
<br />4.36 AND 4.37 OF THE 2007 CALIFORNIA AIR RESOURCES BOARD SUGGESTED
<br />CONTROL MEASURE, AND THE CORRESPONDING FLAT, NONFLAT OR NONFLAT-
<br />HIGH GLOSS VOC LIMIT IN TABLE 5.504.4.3 SHALL APPLY.
<br />THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING CONSTRUCTION
<br />IF NECESSARY TO CONDITION THE BUILDING OR AREAS OF ADDITION OR
<br />ALTERATION WITHIN THE REQUIRED TEMPERATURE RANGE FOR MATERIAL AND
<br />EQUIPMENT INSTALLATION. IF THE HVAC SYSTEM IS USED DURING
<br />CONSTRUCTION, USE RETURN AIR FILTERS WITH A MINIMUM EFFICIENCY
<br />REPORTING VALUE (MERV) OF 8, BASED ON ASHRAE 52.2-1999, OR AN AVERAGE
<br />EFFICIENCY OF 30 PERCENT BASED ON ASHRAE 52.1-1992. REPLACE ALL
<br />FILTERS IMMEDIATELY PRIOR TO OCCUPANCY, OR, IF THE BUILDING IS
<br />OCCUPIED DURING ALTERATION, AT THE CONCLUSION OF CONSTRUCTION.
<br />ARCHITECTURAL APPLICATIONS CURRENT VOC LIMIT
<br />INDOOR CARPET ADHESIVES 50
<br />CARPET PAD ADHESIVES 50
<br />OUTDOOR CARPET ADHESIVES 150
<br />WOOD FLORING ADHESIVES 100
<br />RUBBER FLOOR ADHESIVES 60
<br />SUBFLOOR ADHESIVES 50
<br />CERAMIC TILES ADHESIVES 65
<br />VCT AND ASPHALTS TILE ADHESIVES 50
<br />DRYWALL AND PANEL ADHESIVES 50
<br />COVE BASE ADHESIVES 50
<br />MULTIPURPOSE CONSTRUCTION ADHESIVES 70
<br />STRUCTURAL GLAZING ADHESIVES 100
<br />SINGLE-PLY ROOF MEMBRANE ADHESIVES 250
<br />OTHER ADHESIVE NOT SPECIFICALLY USED 50
<br />SPECIALITY APPLICATIONS
<br />PVC WELDING 510
<br />CPVC WELDING 490
<br />ABS WELDING 325
<br />PLASTIC CEMENT WELDING 250
<br />ADHESIVE PRIMER FOR PLASTIC 550
<br />CONTACT ADHESIVE 80
<br />SPECIAL PURPOSE CONTACT ADHESIVE 250
<br />STRUCTURAL WOOD MEMBRANE ADHESIVE 140
<br />TOP AND TRIM ADHESIVE 250
<br />SUBSTRATE SPECIFIC APPLICATIONS
<br />METAL TO METAL 30
<br />PLASTIC FOAMS 50
<br />POROUS MATERIAL (EXCEPT WOOD)50
<br />WOOD 30
<br />FIBERGLASS 80
<br />SEALANTS CURRENT VOC LIMIT.
<br />ARCHITECTURAL 250
<br />MARINE DECK 760
<br />NONMEMBRANE ROOF 300
<br />ROADWAY 250
<br />SINGLE -PLY ROOF MEMBRANE 450
<br />OTHER 420
<br />SEALANT PRIMERS
<br />NONPOROUS 250
<br />POROUS 775
<br />MODIFIED BITUMINOUS 500
<br />MARINE DECK 760
<br />OTHER 750
<br />ADHESIVES, SEALANTS AND CAULKS USED ON THE PROJECT SHALL MEET THE
<br />REQUIREMENTS OF THE FOLLOWING STANDARDS:
<br />1. ADHESIVES, ADHESIVE BONDING PRIMERS, ADHESIVE PRIMERS, SEALANTS,
<br /> SEALANT PRIMERS AND CAULKS SHALL COMPLY WITH LOCAL OR REGIONAL
<br /> AIR POLLUTION CONTROL OR AIR QUALITY MANAGEMENT DISTRICT RULES
<br /> WHERE APPLICABLE, OR SCAQMD RULE 1168 VOC LIMITS, AS SHOWN IN
<br /> TABLES 5.504.4.1 AND 5.504.4.2. SUCH PRODUCTS ALSO SHALL COMPLY WITH
<br /> THE RULE 1168 PROHIBITION ON THE USE OF CERTAIN TOXIC COMPOUNDS
<br /> (CHLOROFORM, ETHYLENE DICHLORIDE, METHYLENE CHLORIDE,
<br /> PERCHLOROETHYLENE AND TRICHLOROETHYLENE), EXCEPT FOR AEROSOL
<br /> PRODUCTS AS SPECIFIED IN SUBSECTION 2, BELOW.
<br />2. AEROSOL ADHESIVES, AND SMALLER UNIT SIZES OF ADHESIVES, AND
<br /> SEALANT OR CAULKING COMPOUNDS (IN UNITS OF PRODUCT, LESS
<br /> PACKAGING, WHICH DO NOT WEIGH MORE THAN ONE POUND AND DO NOT
<br /> CONSIST OF MORE THAN 16 FLUID OUNCES) SHALL COMPLY WITH
<br /> STATEWIDE VOC STANDARDS AND OTHER REQUIREMENTS, INCLUDING
<br /> PROHIBITIONS ON USE OF CERTAIN TOXIC COMPOUNDS, OF CALIFORNIA
<br /> CODE OF REGULATIONS, TITLE 17, COMMENCING WITH SECTION 94507.
<br />ARCHITECTURAL
<br />5.504.1 TEMPORARY VENTILATION.
<br />1,2
<br />1. IF AN ADHESIVE IS USED TO BOND DISSIMILAR SUBSTRATES TOGETHER THE ADHESIVE
<br />WITH THE HIGHEST VOC CONTENT SHALL BE ALLOWED.
<br />2. FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC CONTENT
<br />SPECIFIED IN THIS TABLE, SEE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE
<br />1168, http://www.arb.ca.gov/DRDB/SC/CURHTML/R1168.PDF.
<br />NOTE:FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC
<br />CONTENT SPECIFIED IN THESE TABLES, SEE SOUTH COAST AIR QUALITY MANAGEMENT
<br />DISTRICT RULE 1168.
<br />5.504.4.3.1 AEROSOL PAINTS AND COATINGS.
<br />AEROSOL PAINTS AND COATINGS SHALL MEET THE PWMIR LIMITS FOR ROC IN
<br />SECTION 94522(A)(3) AND OTHER REQUIREMENTS, INCLUDING PROHIBITIONS ON
<br />USE OF CERTAIN TOXIC COMPOUNDS AND OZONE DEPLETING SUBSTANCES, IN
<br />SECTIONS 94522(C)(2) AND (D)(2) OF CALIFORNIA CODE OF REGULATIONS, TITLE 17,
<br />COMMENCING WITH SECTION 94520; AND IN AREAS UNDER THE JURISDICTION OF
<br />THE BAY AREA AIR QUALITY MANAGEMENT DISTRICT ADDITIONALLY COMPLY WITH
<br />THE PERCENT VOC BY WEIGHT OF PRODUCT LIMITS OF REGULATION 8 RULE 49.
<br />5.504.4.3.2 VERIFICATION.
<br />VERIFICATION OF COMPLIANCE WITH THIS SECTION SHALL BE PROVIDED AT THE
<br />REQUEST OF THE ENFORCING AGENCY. DOCUMENTATION MAY INCLUDE, BUT IS
<br />NOT LIMITED TO, THE FOLLOWING:
<br />1. MANUFACTURER’S PRODUCT SPECIFICATION
<br />2. FIELD VERIFICATION OF ON-SITE PRODUCT CONTAINERS
<br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE - NONRESIDENTIAL MANDATORY MEASURES
<br />SECTION 5.504 POLLUTANT CONTROL
<br />SECTION 5.505 INDOOR MOISTURE CONTROL
<br />SECTION 5.506 INDOOR AIR QUALITY
<br />(DSA-SS)EACH PUBLIC K-12 SCHOOL CLASSROOM, AS LISTED IN TABLE 120.1-A OF THE
<br />CALIFORNIA ENERGY CODE, SHALL BE EQUIPPED WITH A CARBON DIOXIDE MONITOR OR
<br />SENSOR THAT MEETS THE FOLLOWING REQUIREMENTS:
<br />1.THE MONITOR OR SENSOR SHALL BE PERMANENTLY AFFIXED IN A TAMPER-PROOF
<br />MANNER IN EACH CLASSROOM BETWEEN 3 AND 6 FEET (914 MM AND 1829 MM) ABOVE
<br />THE FLOOR AND AT LEAST 5 FEET (1524 MM) AWAY FROM DOORS AND OPERABLE
<br />WINDOWS.
<br />2.WHEN THE MONITOR OR SENSOR IS NOT INTEGRAL TO AN ENERGY MANAGEMENT
<br />CONTROL SYSTEM (EMCS), THE MONITOR OR SENSOR SHALL DISPLAY THE CARBON
<br />DIOXIDE READINGS ON THE DEVICE. WHEN THE SENSOR IS INTEGRAL TO AN EMCS,
<br />THE CARBON DIOXIDE READINGS SHALL BE AVAILABLE TO AND REGULARLY
<br />MONITORED BY FACILITY PERSONNEL.
<br />3.A MONITOR SHALL PROVIDE NOTIFICATION THROUGH A VISUAL INDICATOR ON THE
<br />MONITOR WHEN THE CARBON DIOXIDE LEVELS IN THE CLASSROOM HAVE EXCEEDED
<br />1,100 PPM. A SENSOR INTEGRAL TO AN EMCS SHALL PROVIDE NOTIFICATION TO
<br />FACILITY PERSONNEL THROUGH A VISUAL AND/OR AUDIBLE INDICATOR WHEN THE
<br />CARBON DIOXIDE LEVELS IN THE CLASSROOM HAVE EXCEEDED 1,100 PPM.
<br />4.THE MONITOR OR SENSOR SHALL MEASURE CARBON DIOXIDE LEVELS AT MINIMUM
<br />15-MINUTE INTERVALS AND SHALL MAINTAIN A RECORD OF PREVIOUS CARBON
<br />DIOXIDE MEASUREMENTS OF NOT LESS THAN 30 DAYS DURATION.
<br />5.THE MONITOR OR SENSOR USED TO MEASURE CARBON DIOXIDE LEVELS SHALL HAVE
<br />THE CAPACITY TO MEASURE CARBON DIOXIDE LEVELS WITH A RANGE OF 400 PPM TO
<br />2000 PPM OR GREATER.
<br />6.THE MONITOR OR SENSOR SHALL BE CERTIFIED BY THE MANUFACTURER TO BE
<br />ACCURATE WITHIN 75 PPM AT 1,000 PPM CARBON DIOXIDE CONCENTRATION AND
<br />SHALL BE CERTIFIED BY THE MANUFACTURER TO REQUIRE CALIBRATION NO MORE
<br />FREQUENTLY THAN ONCE EVERY 5 YEARS.
<br />5.506.3 CARBON DIOXIDE (CO2) MONITORING IN CLASSROOMS.
<br />SECTION 5.507 ENVIRONMENTAL COMFORT
<br />DIVISION 5.5 – ENVIRONMENTAL QUALITY
<br />5.504.4.6 RESILIENT FLOORING SYSTEMS.
<br />WHERE RESILIENT FLOORING IS INSTALLED AT LEAST 80 PERCENT OF FLOOR AREA
<br />RECEIVING RESILIENT FLOORING SHALL MEET THE REQUIREMENTS OF THE
<br />CALIFORNIA DEPARTMENT OF PULBIC HEALTH, "STANDARD METHOD FOR THE
<br />TESTING AND EVALUATION OF VOLATILE ORGANIC CHEMICAL EMISSIONS FROM
<br />INDOOR SOURCES USING ENVIROMENTAL CHAMBERS." VERSION 1.2, JANUARY 2017
<br />(EMISSION TESTING METHOD FOR CALIFORNIA SPECIFICATION 01350).
<br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH'S WEBSITE FOR
<br />CERTIFICATION PROGRAMS AND TESTING LABS.
<br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx#
<br />material
<br />5.410.2 COMMISSIONING.
<br />5.408.3 EXCAVATED SOIL AND LAND CLEARING DEBRIS.
<br />100 PERCENT OF TREES, STUMPS, ROCKS AND ASSOCIATED VEGETATION AND
<br />SOILS RESULTING PRIMARILY FROM LAND CLEARING SHALL BE REUSED OR
<br />RECYCLED. FOR A PHASED PROJECT, SUCH MATERIAL MAY BE STICKPILED ON
<br />SITE UNTIL THE STORAGE SITE IS DEVELOPED.
<br />EXCEPTION: REUSE, EITHER ON-OR OFF-SITE, OF VEGETATION OR SOIL
<br /> CONTAMINATED BY DISEASE OR PEST INFESTATION.
<br />NOTES:
<br />1. IF CONTAMINATION BY DISEASE OR PEST INFESTATION IS SUSPECTED,CONTACT
<br />THE COUNTY AGRICULTURAL COMMISSIONER AND FOLLOW ITS DIRECTION FOR
<br />RECYCLING OR DISPOSAL OF THE MATERIAL.
<br />(www.cdfa.ca.gov/exec/county/county_contacts.html)
<br />2. FOR A MAP OF KNOWN PEST AND/OR DISEASE QUARANTINE ZONES, CONSULT
<br />WITH THE CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE. (www.cdfa.ca.gov)
<br />CONTRACTOR TO DEVELOP CONSTRUCTION WASTE MANAGEMENT PLAN AND
<br />SUBMIT IT TO THE CITY FOR APPROVAL PRIOR TO THE START OF CONSTRUCTION.
<br />SEE ARCHITECTURAL DRAWINGS.
<br />PROVIDE READILY ACCESSIBLE AREAS THAT SERVE THE ENTIRE BUILDING AND ARE
<br />IDENTIFIED FOR THE DEPOSITING, STORAGE AND COLLECTION OF NON-HAZARDOUS
<br />MATERIALS FOR RECYCLING, INCLUDING (AT A MINIMUM) PAPER, CORRUGATED
<br />CARDBOARD, GLASS, PLASTICS, ORGANIC WASTE AND METALS, OR MEET A
<br />LAWFULLY ENACTED LOCAL RECYCLING ORDINANCE, IF MORE RESTRICTIVE.
<br />EXCEPTION:RURAL JURISDICTIONS THAT MEET AND APPLY FOR THE EXEMPTION IN
<br /> PUBLIC RESOURCES CODE 42649.82 (A)(2)(A) ET SEQ. SHALL ALSO BE
<br /> EXEMPT FROM THE ORGANIC WASTE PORTION OF THIS SECTION.
<br />[N] NEW BUILDINGS 10,000 SQUARE FEET AND OVER. FOR NEW BUILDINGS 10,000 SQUARE
<br />FEET AND OVER, BUILDING COMMISSIONING SHALL BE INCLUDED IN THE DESIGN AND
<br />CONSTRUCTION PROCESSES OF THE BUILDING PROJECT TO VERIFY THAT THE BUILDING
<br />SYSTEMS AND COMPONENTS MEET THE OWNER’S OR OWNER REPRESENTATIVE’S
<br />PROJECT REQUIREMENTS. COMMISSIONING SHALL BE PERFORMED IN ACCORDANCE
<br />WITH THIS SECTION BY TRAINED PERSONNEL WITH EXPERIENCE ON PROJECTS OF
<br />COMPARABLE SIZE AND COMPLEXITY. FOR I-OCCUPANCIES THAT ARE NOT REGULATED BY
<br />OSHPD OR FOR I-OCCUPANCIES AND L-OCCUPANCIES THAT ARE NOT REGULATED BY THE
<br />CALIFORNIA ENERGY CODE SECTION 100.0 SCOPE, ALL REQUIREMENTS IN SECTIONS
<br />5.410.2 THROUGH 5.410.2.6 SHALL APPLY.
<br />NOTES:
<br />FOR ENERGY-RELATED SYSTEMS UNDER THE SCOPE (SECTION 100) OF THE CALIFORNIA
<br />ENERGY CODE, INCLUDING HEATING, VENTILATION, AIR CONDITIONING (HVAC) SYSTEMS
<br />AND CONTROLS, INDOOR LIGHTING SYSTEMS AND CONTROLS, AS WELL AS W ATER
<br />HEATING SYSTEMS AND CONTROLS, REFER TO CALIFORNIA ENERGY CODE SECTION 120.8
<br />FOR COMMISSIONING REQUIREMENTS.
<br />COMMISSIONING REQUIREMENTS SHALL INCLUDE:
<br />1. OWNER’S OR OWNER REPRESENTATIVE’S PROJECT REQUIREMENTS.
<br />2. BASIS OF DESIGN.
<br />3. COMMISSIONING MEASURES SHOWN IN THE CONSTRUCTION DOCUMENTS.
<br />4. COMMISSIONING PLAN.
<br />5. FUNCTIONAL PERFORMANCE TESTING.
<br />6. DOCUMENTATION AND TRAINING.
<br />7. COMMISSIONING REPORT.
<br />EXCEPTIONS:
<br />1. UNCONDITIONED WAREHOUSES OF ANY SIZE.
<br />2. AREAS LESS THAN 10,000 SQUARE FEET USED FOR OFFICES OR OTHER
<br /> CONDITIONED ACCESSORY SPACES WITHIN UNCONDITIONED W AREHOUSES.
<br />3. TENANT IMPROVEMENTS LESS THAN 10,000 SQUARE FEET AS DESCRIBED IN
<br /> SECTION 303.1.1.
<br />4. OPEN PARKING GARAGES OF ANY SIZE, OR OPEN PARKING GARAGE AREAS, OF ANY
<br /> SIZE, WITHIN A STRUCTURE.
<br />NOTE: FOR THE PURPOSES OF THIS SECTION, UNCONDITIONED SHALL MEAN A BUILDING,
<br /> AREA OR ROOM WHICH DOES NOT PROVIDE HEATING AND OR AIR CONDITIONING.
<br />INFORMATIONAL NOTE:
<br />1. FUNCTIONAL PERFORMANCE TESTING FOR HEATING, VENTILATION, AIR
<br /> CONDITIONING SYSTEMS AND LIGHTING CONTROLS MUST BE PERFORMED IN
<br /> COMPLIANCE WITH THE CALIFORNIA ENERGY CODE.
<br />N/A
<br />5.410.2.1 OWNER'S OR OWNER REPRESENTATIVE'S PROJECT
<br />REQUIREMENTS (OPR).
<br />THE EXPECTATIONS AND REQUIREMENTS OF THE BUILDING APPROPRIATE
<br />TO ITS PHASE SHALL BE DOCUMENTED BEFORE THE DESIGN PHASE OF THE
<br />PROJECT BEGINS. THIS DOCUMENTATION SHALL INCLUDE ITEMS 1 THROUGH
<br />6 LISTED IN THIS SECTION.
<br />[N] THE EXPECTATIONS AND REQUIREMENTS OF THE BUILDING APPROPRIATE TO
<br />ITS PHASE SHALL BE DOCUMENTED BEFORE THE DESIGN PHASE OF THE PROJECT
<br />BEGINS. THIS DOCUMENTATION SHALL INCLUDE THE FOLLOWING:
<br />1. ENVIRONMENTAL AND SUSTAINABILITY GOALS.
<br />2. BUILDING SUSTAINABLE GOALS.
<br />3. INDOOR ENVIRONMENTAL QUALITY REQUIREMENTS.
<br />4. PROJECT PROGRAM, INCLUDING FACILITY FUNCTIONS AND HOURS OF
<br /> OPERATION, AND NEED FOR AFTER HOURS OPERATION.
<br />5. EQUIPMENT AND SYSTEMS EXPECTATIONS.
<br />6. BUILDING OCCUPANT AND OPERATION AND MAINTENANCE (O&M)
<br /> PERSONNEL EXPECTATIONS.
<br />N/A
<br />5.410.2.2 BASIS OF DESIGN (BOD).
<br />[N] A WRITTEN EXPLANATION OF HOW THE DESIGN OF THE BUILDING SYSTEMS
<br />MEETS THE OPR SHALL BE COMPLETED AT THE DESIGN PHASE OF THE BUILDING
<br />PROJECT. THE BASIS OF DESIGN DOCUMENT SHALL COVER THE FOLLOWING
<br />SYSTEMS:
<br />1. RENEWABLE ENERGY SYSTEMS.
<br />2. LANDSCAPE IRRIGATION SYSTEMS.
<br />3. WATER REUSE SYSTEMS.
<br />5.410.2.3 COMMISSIONING PLAN
<br />[N] PRIOR TO PERMIT ISSUANCE A COMMISSIONING PLAN SHALL BE
<br />COMPLETED TO DOCUMENT HOW THE PROJECT WILL BE COMMISSIONED.
<br />THE COMMISSIONING PLAN SHALL INCLUDE THE FOLLOWING:
<br />1. GENERAL PROJECT INFORMATION.
<br />2. COMMISSIONING GOALS.
<br />3. SYSTEMS TO BE COMMISSIONED. PLANS TO TEST SYSTEMS AND
<br /> COMPONENTS SHALL INCLUDE:
<br />A. AN EXPLANATION OF THE ORIGINAL DESIGN INTENT.
<br />B. EQUIPMENT AND SYSTEMS TO BE TESTED, INCLUDING THE
<br /> EXTENT OF TESTS.
<br />C. FUNCTIONS TO BE TESTED.
<br />D. CONDITIONS UNDER WHICH THE TEST SHALL BE PERFORMED.
<br />E. MEASURABLE CRITERIA FOR ACCEPTABLE PERFORMANCE.
<br />4. COMMISSIONING TEAM INFORMATION.
<br />5. COMMISSIONING PROCESS ACTIVITIES, SCHEDULES AND
<br /> RESPONSIBILITIES. PLANS FOR THE COMPLETION OF
<br /> COMMISSIONING SHALL BE INCLUDED.
<br />ALL ADDITIONS CONDUCTED WITHIN A 12-MONTH PERIOD UNDER SINGLE
<br />OR MULTIPLE PERMITS, RESULTING IN AN INCREASE OF 30 PERCENT OR
<br />MORE IN FLOOR AREA, SHALL PROVIDE RECYCLING AREAS ON SITE.
<br />EXCEPTION:
<br />ADDITIONS WITHIN A TENANT SPACE RESULTING IN LESS THAN A 30-PERCENT
<br />INCREASE IN THE TENANT SPACE FLOOR AREA.
<br />5.410.1.1 ADDITIONS.
<br />5.410.1.2 SAMPLE ORDINANCE.
<br />SPACE ALLOCATION FOR RECYCLING AREAS SHALL COMPLY W ITH CHAPTER 18,
<br />PART 3, DIVISION 30 OFTHE PUBLIC RESOURCES CODE. CHAPTER 18 IS KNOWN AS
<br />THE CALIFORNIA SOLID WASTE REUSE AND RECYCLING ACCESS ACT OF 1991 (ACT).
<br />NOTE:
<br />A SAMPLE ORDINANCE FOR USE BY LOCAL AGENCIES MAY BE FOUND IN APPENDIX A
<br />OF THE DOCUMENT AT THE CALRECYCLE’S WEB SITE.
<br />N/A
<br />N/A
<br />5.410.1 RECYCLING BY OCCUPANTS.
<br />SECTION 5.410 BUILDING MAINTENANCE AND OPERATION
<br />5.410.2.4 FUNCTIONAL PERFORMANCE TESTING.
<br />[N] FUNCTIONAL PERFORMANCE TESTS SHALL DEMONSTRATE THE CORRECT
<br />INSTALLATION AND OPERATION OF EACH COMPONENT, SYSTEM AND SYSTEM-TO-
<br />SYSTEM INTERFACE IN ACCORDANCE WITH THE APPROVED PLANS AND
<br />SPECIFICATIONS. FUNCTIONAL PERFORMANCE TESTING REPORTS SHALL CONTAIN
<br />INFORMATION ADDRESSING EACH OF THE BUILDING COMPONENTS TESTED, THE
<br />TESTING METHODS UTILIZED, AND INCLUDE ANY READINGS AND ADJUSTMENTS MADE.
<br />SEE MEP SPECIFICATIONS.
<br />INSTALL ONLY A DIRECT-VENT SEALED-COMBUSTION GAS OR SEALED WOOD-
<br />BURNING FIREPLACE, OR A SEALED WOOD-STOVE OR PELLET STOVE, AND REFER
<br />TO RESIDENTIAL REQUIREMENTS IN THE CALIFORNIA ENERGY CODE, TITLE 24,
<br />PART 6, SUBCHAPTER 7, SECTION 150. WOODSTOVES, PELLET STOVES AND
<br />FIREPLACES SHALL COMPLY WITH APPLICABLE LOCAL ORDINANCES.
<br />5.503.1.1 WOODSTOVES.
<br />WOODSTOVE AND PELLET STOVES SHALL COMPLY WITH US EPA NEW SOURCE
<br />PERFORMANCE STANDARDS (NSPS) EMISSION LIMITS AS APPLICABLE, AND SHALL
<br />HAVE A PERMANENT LABEL INDICATING THEY ARE CERTIFIED TO MEET THE
<br />EMISSION LIMITS.
<br />5.503.1 FIREPLACES.
<br />5.410.4.5.1 INSPECTIONS AND REPORTS.
<br />5.410.4.3.1 HVAC BALANCING.
<br />5.410.4.3 PROCEDURES.
<br />5.410.4.2 SYSTEMS.
<br />5.410.4 TESTING AND ADJUSTING. NEW BUILDINGS LESS THAN
<br />10,000 SQUARE FEET.
<br />TESTING AND ADJUSTING OF SYSTEMS SHALL BE REQUIRED FOR NEW BUILDINGS
<br />LESS THAN 10,000 SQUARE FEET OR NEW SYSTEMS TO SERVE AN ADDITION OR
<br />ALTERATION SUBJECT TO SECTION 303.1.
<br />N/A
<br />DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTING
<br />SYSTEMS. SYSTEMS TO BE INCLUDED FOR TESTING AND ADJUSTING SHALL
<br />INCLUDE, AS APPLICABLE TO THE PROJECT:
<br />1. RENEWABLE ENERGY SYSTEMS.
<br />2. LANDSCAPE IRRIGATION SYSTEMS.
<br />3. WATER REUSE SYSTEMS.
<br />PERFORM TESTING AND ADJUSTING PROCEDURES IN ACCORDANCE WITH
<br />MANUFACTURER'S SPECIFICATIONS AND APPLICABLE STANDARDS ON EACH
<br />SYSTEM.
<br />N/A
<br />IN ADDITION TO TESTING AND ADJUSTING, BEFORE A NEW SPACE-CONDITIONING
<br />SYSTEM SERVING A BUILDING OR SPACE IS OPERATED FOR NORMAL USE, BALANCE THE
<br />SYSTEM IN ACCORDANCE WITH THE PROCEDURES DEFINED BY THE TESTING ADJUSTING
<br />AND BALANCING BUREAU NATIONAL STANDARDS; THE NATIONAL ENVIRONMENTAL
<br />BALANCING BUREAU PROCEDURAL STANDARDS; ASSOCIATED AIR BALANCE COUNCIL
<br />NATIONAL STANDARDS OR AS APPROVED BY THE ENFORCING AGENCY.
<br />INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS REQUIRED BY
<br />THE ENFORCING AGENCY.
<br />N/A
<br />5.410.4.5 OPERATION AND MAINTENANCE (O & M) MANUAL.
<br />5.410.4.4 REPORTING.
<br />AFTER COMPLETION OF TESTING, ADJUSTING AND BALANCING, PROVIDE A FINAL
<br />REPORT OF TESTING SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR
<br />PERFORMING THESE SERVICES.
<br />PROVIDE THE BUILDING OWNER OR REPRESENTATIVE WITH DETAILED OPERATING
<br />AND MAINTENANCE INSTRUCTIONS AND COPIES OF GUARANTIES/WARRANTIES FOR
<br />EACH SYSTEM. O & M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA
<br />REQUIREMENTS IN CCR, TITLE 8, SECTION 5142, AND OTHER RELATED REGULATIONS.
<br />N/A
<br />N/A
<br />N/A
<br />N/A
<br />5.410.2.6 COMMISSIONING REPORT.
<br />5.410.2.5.2 SYSTEMS OPERATIONS TRAINING.
<br />5.410.2.5.1 SYSTEMS MANUAL.
<br />5.410.2.5 DOCUMENTATION AND TRAINING.
<br />[N] A SYSTEMS MANUAL AND SYSTEMS OPERATIONS TRAINING ARE REQUIRED,
<br />INCLUDING OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) REQUIREMENTS IN
<br />CALIFORNIA CODE OF REGULATIONS (CCR), TITLE 8, SECTION 5142, AND OTHER
<br />RELATED REGULATIONS.
<br />[N] DOCUMENTATION OF THE OPERATIONAL ASPECTS OF THE BUILDING SHALL BE
<br />COMPLETED WITHIN THE SYSTEMS MANUAL AND DELIVERED TO THE BUILDING
<br />OWNER OR REPRESENTATIVE. THE SYSTEMS MANUAL SHALL INCLUDE THE
<br />FOLLOWING:
<br />1. SITE INFORMATION, INCLUDING FACILITY DESCRIPTION, HISTORY AND
<br />CURRENT REQUIREMENTS.
<br />2. SITE CONTACT INFORMATION.
<br />3. BASIC OPERATIONS AND MAINTENANCE, INCLUDING GENERAL SITE
<br /> OPERATING PROCEDURES, BASIC TROUBLESHOOTING, RECOMMENDED
<br /> MAINTENANCE REQUIREMENTS, SITE EVENTS LOG.
<br />4. MAJOR SYSTEMS.
<br />5. SITE EQUIPMENT INVENTORY AND MAINTENANCE NOTES.
<br />6. A COPY OF VERIFICATIONS REQUIRED BY THE ENFORCING AGENCY OR THIS
<br /> CODE.
<br />7. OTHER RESOURCES AND DOCUMENTATION, IF APPLICABLE.
<br />[N]A PROGRAM FOR TRAINING OF THE APPROPRIATE MAINTENANCE STAFF FOR
<br />EACH EQUIPMENT TYPE AND/OR SYSTEM SHALL BE DEVELOPED AND
<br />DOCUMENTED IN THE COMMISSIONING REPORT AND SHALL INCLUDE THE
<br />FOLLOWING:
<br />1. SYSTEM/EQUIPMENT OVERVIEW (WHAT IT IS, WHAT IT DOES AND WITH WHAT
<br /> OTHER SYSTEMS AND/OR EQUIPMENT IT INTERFACES).
<br />2. REVIEW AND DEMONSTRATION OF SERVICING/PREVENTIVE MAINTENANCE.
<br />3. REVIEW OF THE INFORMATION IN THE SYSTEMS MANUAL.
<br />4. REVIEW OF THE RECORD DRAWINGS ON THE SYSTEM/EQUIPMENT.
<br />[N] A REPORT OF COMMISSIONING PROCESS ACTIVITIES UNDERTAKEN THROUGH
<br />THE DESIGN AND CONSTRUCTION PHASES OF THE BUILDING PROJECT SHALL BE
<br />COMPLETED AND PROVIDED TO THE OWNER OR REPRESENTATIVE.
<br />SEE MEP SPECIFICATIONS.
<br />5.410.4.1 (RESERVED)
<br />NOTE: FOR ENERGY-RELATED SYSTEMS UNDER THE SCOPE (SECTION 100) OF THE
<br />CALIFORNIA ENERGY CODE, INCLUDING HEATING, VENTILATION, AIR CONDITIONING
<br />(HVAC) SYSTEMS AND CONTROLS, INDOOR LIGHTING SYSTEM AND CONTROLS, AS
<br />WELL AS WATER HEATING SYSTEMS AND CONTROLS, REFER TO CALIFORNIA
<br />ENERGY CODE SECTION 120.8 FOR COMMISSIONING REQUIREMENTS AND SECTIONS
<br />120.5, 120.6, 130.4 AND 140.9(B)3 FOR ADDITIONAL TESTING REQUIREMENTS OF
<br />SPECIFIC SYSTEMS.
<br />THE PROVISIONS OF THIS CHAPTER SHALL OUTLINE MEANS OF REDUCING THE
<br />QUANTITY OF AIR CONTAMINANTS THAT ARE ODOROUS, IRRITATING AND/OR
<br />HARMFUL TO THE COMFORT AND WELL-BEING OF A BUILDING’S INSTALLERS,
<br />OCCUPANTS AND NEIGHBORS.
<br />5.501.1 SCOPE.
<br />SECTION 5.501 GENERAL
<br />SECTION5.503 FIREPLACES
<br />N/A
<br />DIVISION 5.4 – MATERIAL CONSERVATION AND
<br />RESOURCE EFFICIENCY
<br />[BSC-CG] PROJECTS CONSISTING OF NEWLY CONSTRUCTED BUILDING(S) WITH A
<br />COMBINED FLOOR AREA OF 100,000 SQUARE FEET OR GREATER SHALL COMPLY WITH
<br />EITHER SECTION 5.409.2 OR SECTION 5.409.3. ALTERATION(S) TO EXISTING
<br />BUILDING(S) WHERE THE COMBINED ALTERED FLOOR AREA IS 100,000 SQUARE FEET
<br />OR GREATER SHALL COMPLY WITH EITHER SECTION 5.105.2, 5.409.2, OR 5.409.3.
<br />ADDITION(S) TO EXISTING BUILDING(S) WHERE THE TOTAL FLOOR AREA COMBINED
<br />WITH THE EXISTING BUILDING(S) IS 100,000 SQUARE FEET OR GREATER SHALL
<br />COMPLY WITH EITHER SECTION 5.105.2, SECTION 5.409.2, OR SECTION 5.409.3.
<br />EFFECTIVE JANUARY 1, 2026, THE COMBINED FLOOR AREA SHALL BE 50,000 SQUARE
<br />FEET OR GREATER.
<br />[DSA-SS] PROJECTS CONSISTING OF NEWLY CONSTRUCTED BUILDING(S) WITH A
<br />COMBINED FLOOR AREA OF 50,000 SQUARE FEET OR GREATER SHALL COMPLY WITH
<br />EITHER SECTION 5.409.2 OR SECTION 5.409.3. ALTERATION(S) TO EXISTING
<br />BUILDING(S) WHERE THE COMBINED ALTERED FLOOR AREA IS 50,000 SQUARE FEET
<br />OR GREATER SHALL COMPLY WITH EITHER SECTION 5.105.2, 5.409.2, OR 5.409.3.
<br />ADDITION(S) TO EXISTING BUILDING(S) WHERE THE TOTAL FLOOR AREA COMBINED
<br />WITH THE EXISTING BUILDING(S) IS 50,000 SQUARE FEET OR GREATER SHALL COMPLY
<br />WITH EITHER SECTION 5.105.2, SECTION 5.409.2, OR SECTION 5.409.3.
<br />5.409.1 SCOPE.
<br />SECTION 5.409 LIFE CYCLE ASSESSMENT
<br />PROJECTS SHALL CONDUCT A CRADLE-TO-GRAVE WHOLE BUILDING LIFE CYCLE
<br />ASSESSMENT PERFORMED IN ACCORDANCE WITH ISO 14040 AND ISO 14044,
<br />EXCLUDING OPERATING ENERGY, AND DEMONSTRATING A MINIMUM 10-PERCENT
<br />REDUCTION IN GLOBAL WARMING POTENTIAL (GWP) AS COMPARED TO A REFERENCE
<br />BASELINE BUILDING OF SIMILAR SIZE, FUNCTION, COMPLEXITY, TYPE OF
<br />CONSTRUCTION, MATERIAL SPECIFICATION, AND LOCATION THAT MEETS THE
<br />REQUIREMENTS OF THE CALIFORNIA ENERGY CODE CURRENTLY IN EFFECT.
<br />SOFTWARE USED TO CONDUCT THE WHOLE BUILDING LIFE CYCLE ASSESSMENT,
<br />INCLUDING REFERENCE BASELINE BUILDING, SHALL HAVE A DATA SET COMPLIANT
<br />WITH ISO 14044, AND ISO 21930 OR EN 15804, AND THE SOFTWARE SHALL CONFORM
<br />TO ISO 21931 AND/OR EN 15978. THE SOFTWARE TOOLS AND DATA SETS SHALL BE
<br />THE SAME FOR EVALUATION OF BOTH THE BASELINE BUILDING AND THE PROPOSED
<br />BUILDING.
<br />NOTES:
<br />1. SOFTWARE FOR CALCULATING WHOLE BUILDING LIFE CYCLE ASSESSMENT IS
<br />AVAILABLE FOR FREE AT ATHENA SUSTAINABLE MATERIALS INSTITUTE
<br />(HTTPS://CALCULATELCA.COM/SOFTWARE/ IMPACT-ESTIMATOR/) AND
<br />ONECLICK LCA-PLANETARY (WWW.ONECLICKLCA.COM/PLANETARY). PAID
<br />VERSIONS INCLUDE, BUT ARE NOT LIMITED TO, SPHERA GABI SOLUTIONS
<br />(GABI.SPHERA.COM), SIMAPRO (SIMAPRO.COM), ONE-CLICK LCA
<br />(WWW.ONECLICKLCA.COM) AND TALLY FOR REVIT (APPS.AUTODESK.COM).
<br />2. ASTM E2921-22 “STANDARD PRACTICE FOR MINIMUM CRITERIA FOR
<br />COMPARING WHOLE BUILDING LIFE CYCLE ASSESSMENTS FOR USE WITH
<br />BUILDING CODES, STANDARDS, AND RATING SYSTEMS”MAY BE CONSULTED
<br />FOR THE ASSESSMENT.
<br />3. IN ADDITION TO THE REQUIRED DOCUMENTATION SPECIFIED IN SECTION
<br />5.409.2.3, WORKSHEET WS-9 MAY BE REQUIRED BY THE ENFORCING ENTITY
<br />TO DEMONSTRATE COMPLIANCE WITH THE REQUIREMENTS.
<br />5.409.2 WHOLE BUILDING LIFE CYCLE ASSESSMENT.
<br />BUILDING ENCLOSURE COMPONENTS INCLUDED IN THE ASSESSMENT SHALL
<br />BE LIMITED TO GLAZING ASSEMBLIES, INSULATION, AND EXTERIOR FINISHES.
<br />PRIMARY AND SECONDARY STRUCTURAL MEMBERS INCLUDED IN THE
<br />ASSESSMENT SHALL BE LIMITED TO FOOTINGS AND FOUNDATIONS, AND
<br />STRUCTURAL COLUMNS, BEAMS, WALLS, ROOFS, AND FLOORS.
<br />5.409.2.1 BUILDING COMPONENTS.
<br />THE REFERENCE STUDY PERIOD OF THE PROPOSED BUILDING SHALL BE
<br />EQUAL TO THE REFERENCE BASELINE BUILDING AND SHALL BE 60 YEARS.
<br />5.409.2.2 REFERENCE STUDY PERIOD.
<br />A SUMMARY OF THE GWP ANALYSIS PRODUCED BY THE SOFTWARE AND
<br />WORKSHEET WS-4 SIGNED BY THE DESIGN PROFESSIONAL OF RECORD
<br />SHALL BE PROVIDED IN THE CONSTRUCTION DOCUMENTS AS DOCUMEN-
<br />TATION OF COMPLIANCE. A COPY OF THE WHOLE BUILDING LIFE CYCLE
<br />ASSESSMENT WHICH INCLUDES THE GWP ANALYSIS PRODUCED BY THE
<br />SOFTWARE, IN ADDITION TO MAINTENANCE AND TRAINING INFORMATION,
<br />SHALL BE INCLUDED IN THE OPERATION AND MAINTENANCE MANUAL AND
<br />SHALL BE PROVIDED TO THE OWNER AT THE CLOSE OF CONSTRUCTION. THE
<br />ENFORCING AGENCY MAY REQUIRE INSPECTION AND INSPECTION REPORTS
<br />IN ACCORDANCE WITH SECTIONS 702.2 AND 703.1 DURING AND AT COM-
<br />PLETION OF CONSTRUCTION TO DEMONSTRATE SUBSTANTIAL
<br />CONFORMANCE. INSPECTION SHALL BE PERFORMED BY THE DESIGN
<br />PROFESSIONAL OF RECORD OR THIRD PARTY ACCEPTABLE TO THE
<br />ENFORCING AGENCY.
<br />5.409.2.3 VERIFICATION OF COMPLIANCE.
<br />EACH PRODUCT THAT IS PERMANENTLY INSTALLED AND LISTED IN TABLE 5.409.3
<br />SHALL HAVE A TYPE III ENVIRONMENTAL PRODUCT DECLARATION (EPD), EITHER
<br />PRODUCT-SPECIFIC OR FACTORY-SPECIFIC.
<br />5.409.3 PRODUCT GWP COMPLIANCE - PRESCRPTIVE PATH.
<br />5.409.3.1 PRODUCTS SHALL NOT EXCEED THE MAXIMUM GWP VALUE SPECIFIED
<br />IN TABLE 5.409.3.
<br />EXCEPTION: CONCRETE MAY BE CONSIDERED ONE PRODUCT CATEGORY
<br />TO MEET COMPLIANCE WITH THIS SECTION. A WEIGHTED AVERAGE OF THE
<br />MAXIMUM GWP FOR ALL CONCRETE MIXES INSTALLED IN THE PROJECT
<br />SHALL BE LESS THAN THE WEIGHTED AVERAGE MAXIMUM GWP ALLOWED
<br />PER TABLE 5.409.3 USING EXCEPTION EQUATION 5.409.3.1. CALCULATIONS
<br />SHALL BE PERFORMED WITH CONSISTENT UNITS OF MEASUREMENT FOR
<br />THE MATERIAL QUANTITY AND THE GWP VALUE.
<br />FOR THE PURPOSES OF THIS EXCEPTION, INDUSTRY-WIDE EPDS ARE
<br />ACCEPTABLE.
<br />EXCEPTION EQUATION 5.409.3.1
<br />GWP < GWP allowed
<br />WHERE
<br />GWPn = Σ (GWPn )(Vn)
<br />AND
<br />GWPallowed = Σ (GWPallowed)(Vn)
<br />AND
<br />n = EACH CONCRETE MIX INSTALLED IN THE PROJECT
<br />GWPn = THE GWP FOR CONCRETE MIX n PER CONCRETE MIX EPD,
<br /> IN kg CO2e/m3
<br />GWPallowed = THE GWP POTENTIAL ALLOWED FOR CONCRETE MIX n PER
<br /> TABLE 5.409.3
<br />Vn = THE VOLUME OF CONCRETE MIX n INSTALLED IN THE
<br /> PROJECT, IN m3
<br />5.409.3.2 VERIFICATION OF COMPLIANCE.
<br />CALCULATIONS TO DEMONSTRATE COMPLIANCE, TYPE III EPDS FOR
<br />PRODUCTS REQUIRED TO COMPLY, IF INCLUDED IN THE PROJECT, AND
<br />WORK-SHEET WS-5 SIGNED BY THE DESIGN PROFESSIONAL OF RECORD
<br />SHALL BE PROVIDED ON THE CONSTRUCTION DOCUMENTS. UPDATED EPDS
<br />FOR PRODUCTS USED IN CONSTRUCTION SHALL BE PROVIDED TO THE
<br />OWNER AT THE CLOSE OF CONSTRUCTION AND TO THE ENFORCEMENT
<br />ENTITY UPON REQUEST. THE ENFORCING AGENCY MAY REQUIRE
<br />INSPECTION AND INSPECTION REPORTS IN ACCORDANCE WITH SECTIONS
<br />702.2 AND 703.1 DURING AND AT COMPLETION OF CONSTRUCTION TO
<br />DEMONSTRATE SUBSTANTIAL CONFORMANCE. INSPECTION SHALL BE
<br />PERFORMED BY THE DESIGN PROFESSIONAL OF RECORD OR THIRD PARTY
<br />ACCEPTABLE TO THE ENFORCING AGENCY.
<br />BUY CLEAN CALIFORNIA
<br />MATERIALS PRODUCT CATEGORY
<br />MAXIMUM ACCEPTABLE GWP
<br />VALUE (UNFABRICATED)
<br />(GWPallowed)
<br />HOT-ROLLED STRUCTURAL
<br />STEEL SECTIONS
<br />HOLLOW STRUCTURAL SECTIONS
<br />STEEL PLATE
<br />CONCRETE REINFORCING STEEL
<br />FLAT GLASS
<br />LIGHT-DENSITY MINERAL
<br />WOOL BOARD INSULATION
<br />HEAVY-DENSITY MINERAL
<br />WOOL BOARD INSULATION
<br />UP TO 2499 psi
<br />TABLE 5.409.3
<br />PRODUCT GWP LIMITS
<br />UNIT OF
<br />MEASUREMENT
<br />1.77
<br />3.00
<br />2.61
<br />1.56
<br />2.50
<br />5.83
<br />14.28
<br />CONCRETE, READY-MIXED2,3
<br />BUY CLEAN CALIFORNIA
<br />MATERIALS PRODUCT CATEGORY
<br />MAXIMUM ACCEPTABLE GWP
<br />VALUE (UNFABRICATED)
<br />(GWPallowed)
<br />UNIT OF
<br />MEASUREMENT
<br />kg CO2e/MT
<br />kg CO2e/1 m2
<br />MT CO2e/MT
<br />MT CO2e/MT
<br />MT CO2e/MT
<br />MT CO2e/MT
<br />kg CO2e/1 m2
<br />2500 -3499 psi
<br />3500 -4499 psi
<br />4500 -5499 psi
<br />5500 -6499 psi
<br />6500 psi AND GREATER
<br />450
<br />489
<br />566
<br />661
<br />701
<br />799
<br />kg CO2e/m2
<br />CONCRETE, LIGHTWEIGHT READY-MIXED2
<br />UP TO 2499 psi
<br />2500 -3499 psi
<br />3500 -4499 psi
<br />875
<br />956
<br />1039
<br />kg CO2e/m3
<br />1. THE GWP VALUES OF THE PRODUCTS LISTED IN TABLE 5.409.3 ARE BASED ON 175 PERCENT
<br />OF BUY CLEAN CALIFORNIA ACT (BCCA) GWP VALUES, EXCEPT FOR CONCRETE PRODUCTS
<br />WHICH ARE NOT INCLUDED IN THE BCCA.
<br />2. FOR CONCRETE, 175 PERCENT OF THE NATIONAL READY MIXED CONCRETE
<br />ASSOCIATION (NRMCA) 2022 VERSION 3 PACIFIC SOUTHWEST REGIONAL BENCHMARK
<br />VALUES ARE USED FOR THE GWP ALLOWED, EXCEPT FOR HIGH EARLY STRENGTH.
<br />3.CONCRETE HIGH EARLY STRENGTH READY-MIXED SHALL BE CALCULATED AT 130 PERCENT
<br />OF THE READY-MIXED CONCRETE GWP ALLOWED VALUES FOR EACH PRODUCT CATEGORY.
<br />kg CO2e/m2
<br />kg CO2e/m2
<br />kg CO2e/m2
<br />kg CO2e/m2
<br />kg CO2e/m2
<br />kg CO2e/m3
<br />kg CO2e/m3
<br />COMPLY WITH 5.409.3 PRODUCT GWP PRESCRIPTIVE PATH
<br />N/A
<br />N/A
<br />N/A
<br />DA
<br />T
<br />E
<br />
<br />R
<br />E
<br />M
<br />A
<br />R
<br />K
<br />S
<br />08
<br />/
<br />2
<br />5
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />I
<br />S
<br />S
<br />U
<br />E
<br />D
<br />
<br />F
<br />O
<br />R
<br />
<br />P
<br />E
<br />R
<br />M
<br />I
<br />T
<br />11
<br />/
<br />3
<br />0
<br />/
<br />2
<br />0
<br />2
<br />5
<br />11
<br />/
<br />3
<br />0
<br />/
<br />2
<br />0
<br />2
<br />7
<br />03
<br />/
<br />0
<br />5
<br />/
<br />2
<br />0
<br />2
<br />6
<br />
<br />
<br />-
<br />
<br />
<br />P
<br />L
<br />A
<br />N
<br />
<br />C
<br />H
<br />E
<br />C
<br />K
<br />
<br />R
<br />E
<br />S
<br />U
<br />B
<br />M
<br />I
<br />T
<br />T
<br />A
<br />L
|