Laserfiche WebLink
10 <br /> <br /> <br />E <br />d <br />e <br />l <br />m <br />a <br />n <br />Ir <br />v <br />i <br />n <br />e <br />, <br /> <br />C <br />A <br />, <br /> <br />9 <br />2 <br />6 <br />1 <br />8 <br />P <br />9 <br />4 <br />9 <br />. <br />6 <br />6 <br />0 <br />. <br />9 <br />1 <br />2 <br />8 <br /> <br /> <br /> <br />JOB NO.: <br />DRAWN BY.: <br />PA/PM: <br />SHEET <br />TH <br />E <br />S <br />E <br /> <br />D <br />R <br />A <br />W <br />I <br />N <br />G <br />S <br /> <br />A <br />N <br />D <br /> <br />S <br />P <br />E <br />C <br />I <br />F <br />I <br />C <br />A <br />T <br />I <br />O <br />N <br />S <br /> <br />A <br />R <br />E <br /> <br />T <br />H <br />E <br /> <br />P <br />R <br />O <br />P <br />E <br />R <br />T <br />Y <br /> <br />AN <br />D <br /> <br />C <br />O <br />P <br />Y <br />R <br />I <br />G <br />H <br />T <br /> <br />O <br />F <br /> <br />W <br />A <br />R <br />E <br /> <br />M <br />A <br />L <br />C <br />O <br />M <br />B <br /> <br />A <br />N <br />D <br /> <br />S <br />H <br />A <br />L <br />L <br /> <br />N <br />O <br />T <br /> <br />B <br />E <br /> <br />U <br />S <br />E <br />D <br /> O <br />N <br /> <br />A <br />N <br />Y <br /> <br />O <br />T <br />H <br />E <br />R <br /> <br />W <br />O <br />R <br />K <br /> <br />E <br />X <br />C <br />E <br />PT <br /> <br />B <br />Y <br /> <br />A <br />G <br />R <br />E <br />E <br />M <br />E <br />N <br />T <br /> <br />W <br />I <br />T <br />H <br /> <br />W <br />A <br />R <br />E <br /> <br />M <br />A <br />L <br />C <br />O <br />M <br />B <br />. <br /> <br />W <br />R <br />I <br />T <br />T <br />E <br />N <br /> <br />D <br />I <br />M <br />E <br />N <br />S <br />I <br />O <br />NS <br /> <br />S <br />H <br />A <br />L <br />L <br /> <br />T <br />A <br />K <br />E <br /> <br />P <br />R <br />E <br />C <br />E <br />D <br />E <br />N <br />C <br />E <br /> <br />O <br />V <br />E <br />R <br /> <br />S <br />C <br />A <br />L <br />E <br />D <br /> <br />D <br />I <br />M <br />E <br />N <br />S <br />I <br />O <br />N <br />S <br /> <br />A <br />N <br />D <br /> S <br />H <br />A <br />L <br />L <br /> <br />B <br />E <br /> <br />V <br />E <br />R <br />I <br />F <br />I <br />E <br />D <br /> <br />O <br />N <br /> <br />T <br />HE <br /> <br />J <br />O <br />B <br />S <br />I <br />T <br />E <br />. <br /> <br />A <br />N <br />Y <br /> <br />D <br />I <br />S <br />C <br />R <br />E <br />P <br />A <br />N <br />C <br />Y <br /> <br />S <br />H <br />A <br />L <br />L <br /> <br />B <br />E <br /> <br />B <br />R <br />O <br />U <br />G <br />H <br />T <br /> <br />T <br />O <br /> <br />T <br />H <br />E <br /> <br />N <br />O <br />T <br />IC <br />E <br /> <br />O <br />F <br /> <br />W <br />A <br />R <br />E <br /> <br />M <br />A <br />L <br />C <br />O <br />M <br />B <br /> <br />P <br />R <br />I <br />O <br />R <br /> <br />T <br />O <br /> <br />T <br />H <br />E <br /> <br />C <br />O <br />M <br />M <br />E <br />N <br />C <br />E <br />M <br />E <br />N <br />T <br /> <br />O <br />F <br /> <br />A <br />N <br />Y <br />W <br />O <br />R <br />K <br />CAUTION:IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT <br />Au <br />t <br />o <br />d <br />e <br />s <br />k <br /> <br />D <br />o <br />c <br />s <br />: <br />/ <br />/ <br />I <br />R <br />V <br />2 <br />5 <br />- <br />6 <br />0 <br />1 <br />7 <br />- <br />0 <br />0 <br />_ <br />F <br />u <br />j <br />i <br /> <br />F <br />i <br />s <br />i <br /> <br />- <br />I <br />r <br />v <br />i <br />n <br />e <br /> <br />S <br />c <br />i <br /> <br />2 <br />5 <br />0 <br />1 <br /> <br />P <br />u <br />l <br />l <br />m <br />a <br />n <br />/ <br />6 <br />0 <br />1 <br />7 <br />_ <br />A <br />R <br />C <br />H <br />- <br />T <br />I <br />. <br />r <br />v <br />t <br />3/ <br />5 <br />/ <br />2 <br />0 <br />2 <br />6 <br /> <br />1 <br />1 <br />: <br />5 <br />1 <br />: <br />0 <br />5 <br /> <br />A <br />M <br />Approver <br />Author <br />IRV25-6017 <br />CA <br />L <br />G <br />R <br />E <br />E <br />N <br /> <br />N <br />O <br />T <br />E <br />S <br />I032 <br />FU <br />J <br />I <br />F <br />I <br />L <br />M <br /> <br />- <br />FI <br />S <br />I <br />25 <br />0 <br />1 <br /> <br />P <br />U <br />L <br />L <br />M <br />A <br />N <br /> <br />S <br />T <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />2 <br />0 <br />1 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />5.505.1 INDOOR MOISTURE CONTROL <br />N/A <br />5.506.1 OUTSIDE AIR DELIVERY. <br />N/A <br />5.506.2 CARBON DIOXIDE (CO2) MONITORING. <br />N/A <br />5.507.4 ACOUSTICAL CONTROL <br />N/A <br />5.507.4.1 EXTERIOR NOISE TRANSMISSION, PRESCRIPTIVE <br />METHOD <br />BUILDINGS SHALL MEET OR EXCEED THE PROVISIONS OF CALIFORNIA BUILDING CODE, <br />CCR, TITLE 24, PART 2, SECTIONS 1202 (VENTILATION) AND CHAPTER 14 (EXTERIOR <br />WALLS). FOR ADDITIONAL MEASURES, SEE SECTION 5.407.2 OF THIS CODE. <br />FOR MECHANICALLY OR NATURALLY VENTILATED SPACES IN BUILDINGS, MEET THE <br />MINIMUM REQUIREMENTS OF SECTION 120.1 (REQUIREMENTS FOR VENTILATION) OF THE <br />CALIFORNIA ENERGY CODE, OR THE APPLICABLE LOCAL CODE, WHICHEVER IS MORE <br />STRINGENT, AND DIVISION 1, CHAPTER 4 OF CCR, TITLE 8. <br />FOR BUILDINGS OR ADDITIONS EQUIPPED WITH DEMAND CONTROL VENTILATION, CO2 <br />SENSORS AND VENTILATION CONTROLS SHALL BE SPECIFIED AND INSTALLED IN <br />ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENERGY CODE, SECTION <br />120.1(c)(4). <br />EMPLOY BUILDING ASSEMBLIES AND COMPONENTS WITH SOUND TRANSMISSION CLASS <br />(STC) VALUES DETERMINED IN ACCORDANCE WITH ASTM E 90 AND ASTM E 413 OR <br />OUTDOOR-INDOOR SOUND TRANSMISSION CLASS (OITC) DETERMINED IN ACCORDANCE <br />WITH ASTM E 1332, USING EITHER THE PRESCRIPTIVE OR PERFORMANCE METHOD IN <br />SECTION 5.507.4.1 OR 5.507.4.2. <br />EXCEPTION:BUILDINGS WITH FEW OR NO OCCUPANTS OR WHERE OCCUPANTS ARE NOT <br />LIKELY TO BE AFFECTED BY EXTERIOR NOISE, AS DETERMINED BY THE ENFORCEMENT <br />AUTHORITY, SUCH AS FACTORIES, STADIUMS, STORAGE, ENCLOSED PARKING <br />STRUCTURES AND UTILITY BUILDINGS. <br />EXCEPTION: [DSA-SS]FOR PUBLIC SCHOOLS AND COMMUNITY COLLEGES, THE <br />REQUIREMENTS OF THIS SECTION AND ALL SUBSECTIONS APPLY ONLY TO NEW <br />CONSTRUCTION. <br />WALL AND ROOF-CEILING ASSEMBLIES EXPOSED TO THE NOISE SOURCE MAKING UP <br />THE BUILDING OR ADDITION ENVELOPE OR ALTERED ENVELOPE SHALL MEET A <br />COMPOSITE STC RATING OF AT LEAST 50 OR A COMPOSITE OITC RATING OF NO LESS <br />THAN 40, WITH EXTERIOR WINDOWS OF A MINIMUM STC OF 40 OR OITC OF 30 IN THE <br />FOLLOWING LOCATIONS: <br />1. WITHIN THE 65 CNEL NOISE CONTOUR OF AN AIRPORT. <br />EXCEPTIONS: <br />1. LDN OR CNEL FOR MILITARY AIRPORTS SHALL BE DETERMINED <br /> BY THE FACILITY AIR INSTALLATION COMPATIBLE LAND USE ZONE <br /> (AICUZ) PLAN. <br />2. LDN OR CNEL FOR OTHER AIRPORTS AND HELIPORTS FOR <br /> WHICH A LAND USE PLAN HAS NOT BEEN DEVELOPED SHALL BE <br /> DETERMINED BY THE LOCAL GENERAL PLAN NOISE ELEMENT. <br />2. WITHIN THE 65 CNEL OR LDN NOISE CONTOUR OF A FREEWAY OR <br /> EXPRESSWAY, RAILROAD, INDUSTRIAL SOURCE OR FIXED-GUIDEWAY <br /> SOURCE AS DETERMINED BY THE NOISE ELEMENT OF THE GENERAL PLAN. <br />5.504.7 ENVIRONMENTAL TOBACCO SMOKE (ETS) CONTROL. <br />WHERE OUTDOOR AREAS ARE PROVIDED FOR SMOKING, PROHIBIT SMOKING <br />WITHIN 25 FEET OF BUILDING ENTRIES, OUTDOOR AIR INTAKES AND OPERABLE <br />WINDOWS AND WITHIN THE BUILDING AS ALREADY PROHIBITED BY OTHER LAWS OR <br />REGULATIONS; OR AS ENFORCED BY ORDINANCES, REGULATIONS OR POLICIES OF <br />ANY CITY, COUNTY, CITY AND COUNTY, CALIFORNIA COMMUNITY COLLEGE, <br />CAMPUS OF THE CALIFORNIA STATE UNIVERSITY, OR CAMPUS OF THE UNIVERSITY <br />OF CALIFORNIA, WHICHEVER ARE MORE STRINGENT. WHEN ORDINANCES, <br />REGULATIONS OR POLICIES ARE NOT IN PLACE, POST SIGNAGE TO INFORM <br />BUILDING OCCUPANTS OF THE PROHIBITATIONS. <br />N/A <br />N/A <br />TABLE 5.504.4.3 <br />VOC CONTENT LIMITS FOR ARCHITECTURAL COATINGS <br />GRAMS OF VOC PER LITER OF COATING, LESS WATER <br />AND LESS EXEMPT COMPOUNDS <br />SUBMITTAL AVAILABLE UPON REQUEST. <br />5.504.4.4 CARPET SYSTEMS. <br />ALL CARPET INSTALLED IN THE BUILDING INTERIOR SHALL MEET THE REQUIREMENTS OF <br />THE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH, "STANDARD METHOD FOR THE TESTING <br />AND EVALUATION OF VOLATILE ORGANIC CHEMICAL EMISSIONS FROM INDOOR SOURCES <br />USING ENVIRONMENTAL CHAMBERS," VERSION 1.2, JANUARY 2017 (EMISSION TESTING <br />METHOD FOR CALIFORNIA SPECIFICATION 01350). <br />5.504.4.4.2 CARPET ADHESIVE. <br />ALL CARPET ADHESIVE SHALL MEET THE REQUIREMENTS OF TABLE 5.504.4.1. <br />5.504.4.5. COMPOSITE WOOD PRODUCTS. <br />5.504.4.5.3 DOCUMENTATION. <br />HARDWOOD PLYWOOD, PARTICLEBOARD AND MEDIUM DENSITY FIBERBOARD COMPOSITE <br />WOOD PRODUCTS USED ON THE INTERIOR OR EXTERIOR OF THE BUILDING SHALL MEET <br />THE REQUIREMENTS FOR FORMALDEHYDE AS SPECIFIED IN ARB’S AIR TOXICS CONTROL <br />MEASURE (ATCM) FOR COMPOSITE WOOD (17 CCR 93120 ET SEQ.) THOSE MATERIALS NOT <br />EXEMPTED UNDER THE ATCM MUST MEET THE SPECIFIED EMISSION LIMITS,AS SHOWN IN <br />TABLE 5.504.4.5. <br />SEE ARCHITECTURAL SPECIFICATIONS. <br />VERIFICATION OF COMPLIANCE WITH THIS SECTION SHALL BE PROVIDED AS <br />REQUESTED BY THE ENFORCING AGENCY. DOCUMENTATION SHALL INCLUDE AT <br />LEAST ONE OF THE ITEMS 1 THROUGH 5 LISTED IN SECTION 5.504.4.5.3. <br />1. PRODUCT CERTIFICATIONS AND SPECIFICATIONS. <br />2. CHAIN OF CUSTODY CERTIFICATIONS. <br />3. PRODUCT LABELED AND INVOICED AS MEETING THE COMPOSITE WOOD <br /> PRODUCTS REGULATION (SEE CCR, TITLE 17, SECTION 93120, ET SEQ.). <br />4. EXTERIOR GRADE PRODUCTS MARKED AS MEETING THE PS-1 OR PS-2 <br /> STANDARDS OF THE ENGINEERED WOOD ASSOCIATION, THE AUSTRALIAN <br /> AS/NZS 2269 OR EUROPEAN 636 3S STANDARDS. <br />5. OTHER METHODS ACCEPTABLE TO THE ENFORCING AGENCY. <br />DOCUMENTATION AVAILABLE UPON REQUEST. <br />5.504.4.6.1 VERIFICATION OF COMPLIANCE. <br />DOCUMENTATION SHALL BE PROVIDED VERIFYING THAT RESILIENT FLOORING <br />MATERIALS MEET THE POLLUTANT EMISSION LIMITS. <br />AVAILABLE UPON REQUEST. <br />5.504.5.3 FILTERS. <br />IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED AREAS OF <br />THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT <br />PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 13. MERV 13 <br />FILTERS SHALL BE INSTALLED PRIOR TO OCCUPANCY, AND RECOMMENDATIONS FOR <br />MAINTENANCE WITH FILTERS OF THE SAME VALUE SHALL BE INCLUDED IN THE OPERATION <br />AND MAINTENANCE MANUAL. <br />EXCEPTION:EXISTING MECHANICAL EQUIPMENT. <br />SEE MECHANICAL DRAWINGS. <br />TABLE 5.504.4.5 <br />FORMALDEHYDE LIMITS <br />MAXIMUM FORMALDEHYDE EMISSIONS IN PARTS PER MILLION. <br />SEE PROJECT SPECIFICATIONS. <br />INSTALLED FILTERS SHALL BE CLEARLY LABELED BY THE MANUFACTURER <br />INDICATING THE MERV RATING. <br />5.504.5.3.1 LABELING. <br />COATING CATEGORY CURRENT VOC LIMIT <br />FLAT COATINGS 50 <br />NONFLAT COATINGS 100 <br />NONFLAT HIGH GLOSS COATINGS 150 <br />SPECIALTY COATINGS <br />ALUMINUM ROOF COATINGS 400 <br />BASEMENT SPECIALITY COATINGS 400 <br />BITUMINOUS ROOF COATINGS 50 <br />BITUMINOUS ROOF PRIMERS 350 <br />BOND BREAKERS 350 <br />CONCRETE CURING COMPOUNDS 350 <br />CONCRETE/ MASONARY SEALERS 100 <br />DRIVEWAY SEALERS 50 <br />DRY FOG COATINGS 150 <br />FAUX FINISHING COATINGS 350 <br />FIRE RESISTIVE COATINGS 350 <br />FLOOR COATINGS 100 <br />FORM-RELEASE COMPOUNDS 250 <br />GRAPHIC ART COATINGS (SIGN PAINTS)500 <br />HIGH-TEMPERATURE COATINGS 420 <br />INDUSTRIAL MAINTENANCE COATINGS 250 <br />LOW SOLIDS COATINGS 120 <br />MAGNESITE CEMENT COATINGS 450 <br />MASTIC TEXTURE COATINGS 100 <br />METALLIC PIGMENTED COATINGS 500 <br />MULTICOLORS COATINGS 250 <br />PRETREATMENT WASH PRIMERS 420 <br />PRIMERS, SEALERS AND UNDERCOATERS 100 <br />REACTIVE PENETRATING SEALERS 350 <br />RECYCLED COATINGS 250 <br />ROOF COATINGS 50 <br />RUST PREVENTATIVE COATINGS 250 <br />SHELLACS <br />CLEAR 730 <br />OPAQUE 550 <br />SPECIALITY PRIMERS, SEALERS AND UNDERCOATERS:100 <br />STAINS 250 <br />STONE CONSOLIDANTS 450 <br />SWIMMING POOLS COATING 340 <br />TRAFFIC MARKING COATINGS 100 <br />TUB AND TILE REFINISH COATINGS 420 <br />WATERPROOFING MEMBRANES 250 <br />WOOD COATINGS 275 <br />WOOD PRESERVATIVES 350 <br />ZINC-RICH PRIMERS 340 <br />PRODUCT CURRENT LIMIT <br />HARDWOOD PLYWOOD VENEER CORE 0.05 <br />HARDWOOD PLYWOOD COMPOSITE CORE 0.05 <br />PARTICLE BOARD 0.09 <br />MEDIUM DENSITY FIBERBOARD 0.11 <br />THIN MEDIUM DENSITY FIBERBOARD 0.13 <br />SEE PROJECT SPECIFICATIONS. <br />SEE PROJECT SPECIFICATIONS. <br />5.504.4.4.1 CARPET CUSHION. <br />ALL CARPET CUSHION INSTALLED IN THE BUILDING INTERIOR SHALL MEET THE <br />REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH, "STANDARD <br />METHOD FOR THE TESTING AND EVALUATION OF VOLATILE ORGANIC CHEMICAL <br />EMISSIONS FROM INDOOR SOURCES USING ENVIRONMENTAL CHAMBERS," VERSION 1.2, <br />JANUARY 2017 (EMISSION TESTING METHOD FOR CALIFORNIA SPECIFICATION 01350). <br />2,3 <br />1 <br />1. GRAMS OF VOC PER LITER OF COATING, INCLUDING WATER AND INCLUDING <br /> EXEMPT COMPOUNDS. <br />2. THE SPECIFIED LIMITS REMAIN IN EFFECT UNLESS REVISED LIMITS ARE LISTED IN <br /> SUBSEQUENT COLUMNS IN THE TABLE. <br />3. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA <br /> AIR RESOURCES BOARD, ARCHITECTURAL COATINGS SUGGESTED CONTROL <br /> MEASURE, FEBRUARY 1, 2008. MORE INFORMATION IS AVAILABLE FROM THE AIR <br /> RESOURCES BOARD. <br />1 <br />2 <br />1. VALUES IN THIS TABLE ARE DERIVED FROM THOSE SPECIFIED BY THE CALIFORNIA <br /> AIR RESOURCES BOARD, AIR TOXICS CONTROL MEASURE FOR COMPOSITE WOOD AS <br /> TESTED IN ACCORDANCE WITH ASTM E1333. FOR ADDITIONAL INFORMATION, SEE <br /> CALIFORNIA CODE OF REGULATIONS, TITLE 17, SECTIONS 93120 THROUGH 93120.12. <br />2. THIN MEDIUM DENSITY FIBERBOARD HAS A MAXIMUM THICKNESS OF 5/16 INCH (8 MM). <br />5.504.4.5.1 EARLY COMPLIANCE. <br />RESERVED. <br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH'S WEBSITE FOR <br />CERTIFICATION PROGRAMS AND TESTING LABS. <br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx# <br />material <br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH'S WEBSITE FOR <br />CERTIFICATION PROGRAMS AND TESTING LABS. <br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx# <br />material <br />5.504.4.7 THERMAL INSULATION. <br />COMPLY WITH THE REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF PUBLIC <br />HEALTH, “STANDARD METHOD FOR THE TESTING AND EVALUATION OF VOLATILE <br />ORGANIC CHEMICAL EMISSIONS FROM INDOOR SOURCES USING ENVIRONMENTAL <br />CHAMBERS,”VERSION 1.2, JANUARY 2017 (EMISSION TESTING METHOD FOR <br />CALIFORNIA SPECIFICATION 01350). <br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH’S WEBSITE FOR <br />CERTIFICATION PROGRAMS AND TESTING LABS. <br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx# <br />material <br />5.504.4.7.1 VERIFICATION OF COMPLIANCE. <br />DOCUMENTATION SHALL BE PROVIDED VERIFYING THAT THERMAL INSULATION <br />MATERIALS MEET THE POLLUTANT EMISSION LIMITS. <br />5.504.4. 8 ACOUSTICAL CEILINGS AND WALL PANELS. <br />COMPLY WITH THE REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF PUBLIC <br />HEALTH, “STANDARD METHOD FOR THE TESTING AND EVALUATION OF VOLATILE <br />ORGANIC CHEMICAL EMISSIONS FROM INDOOR SOURCES USING ENVIRONMENTAL <br />CHAMBERS,”VERSION 1.2, JANUARY 2017 (EMISSION TESTING METHOD FOR <br />CALIFORNIA SPECIFICATION 01350). <br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH’S WEBSITE FOR <br />CERTIFICATION PROGRAMS AND TESTING LABS. <br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx# <br />material <br />5.504.4.8.1 VERIFICATION OF COMPLIANCE. <br />DOCUMENTATION SHALL BE PROVIDED VERIFYING THAT ACOUSTICAL FINISH <br />MATERIALS MEET THE POLLUTANT EMISSION LIMITS. <br />5.504.4.1 ADHESIVES, SEALANTS AND CAULKS. <br />5.504.4 FINISH MATERIAL POLLUTANT CONTROL. <br />5.504.3 COVERING OF DUCT OPENINGS AND PROTECTION <br /> OF MECHANICAL EQUIPMENT DURING CONSTRUCTION. <br />TABLE 5.504.4.2 <br />SEALANT VOC LIMIT <br />LESS WATER AND LESS EXEMPT COMPOUNDS IN GRAMS PER LITER <br />TABLE 5.504.4.1 <br />ADHESIVE VOC LIMIT <br />LESS WATER AND LESS EXEMPT COMPOUNDS IN GRAMS PER LITER <br />AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE <br />CONSTRUCTION SITE AND UNTIL FINAL STARTUP OF THE HEATING, COOLING <br />AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR <br />DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, <br />PLASTIC, SHEETMETAL, OR OTHER METHODS ACCEPTABLE TO THE <br />ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST, WATER AND DEBRIS <br />WHICH MAY ENTER THE SYSTEM. <br />FINISH MATERIALS SHALL COMPLY WITH SECTIONS 5.504.4.1 THROUGH <br />5.504.4.6. <br />5.504.4.3 PAINTS AND COATINGS. <br />ARCHITECTURAL PAINTS AND COATINGS SHALL COMPLY WITH VOC LIMITS IN TABLE <br />1 OF THE ARB ARCHITECTURAL COATINGS SUGGESTED CONTROL MEASURE, AS <br />SHOWN IN TABLE 5.504.4.3, UNLESS MORE STRINGENT LOCAL LIMITS APPLY. THE <br />VOC CONTENT LIMIT FOR COATINGS THAT DO NOT MEET THE DEFINITIONS FOR THE <br />SPECIALTY COATINGS CATEGORIES LISTED IN TABLE 5.504.4.3 SHALL BE <br />DETERMINED BY CLASSIFYING THE COATING AS A FLAT, NONFLAT OR NONFLAT- <br />HIGH GLOSS COATING, BASED ON ITS GLOSS, AS DEFINED IN SUBSECTIONS 4.21, <br />4.36 AND 4.37 OF THE 2007 CALIFORNIA AIR RESOURCES BOARD SUGGESTED <br />CONTROL MEASURE, AND THE CORRESPONDING FLAT, NONFLAT OR NONFLAT- <br />HIGH GLOSS VOC LIMIT IN TABLE 5.504.4.3 SHALL APPLY. <br />THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING CONSTRUCTION <br />IF NECESSARY TO CONDITION THE BUILDING OR AREAS OF ADDITION OR <br />ALTERATION WITHIN THE REQUIRED TEMPERATURE RANGE FOR MATERIAL AND <br />EQUIPMENT INSTALLATION. IF THE HVAC SYSTEM IS USED DURING <br />CONSTRUCTION, USE RETURN AIR FILTERS WITH A MINIMUM EFFICIENCY <br />REPORTING VALUE (MERV) OF 8, BASED ON ASHRAE 52.2-1999, OR AN AVERAGE <br />EFFICIENCY OF 30 PERCENT BASED ON ASHRAE 52.1-1992. REPLACE ALL <br />FILTERS IMMEDIATELY PRIOR TO OCCUPANCY, OR, IF THE BUILDING IS <br />OCCUPIED DURING ALTERATION, AT THE CONCLUSION OF CONSTRUCTION. <br />ARCHITECTURAL APPLICATIONS CURRENT VOC LIMIT <br />INDOOR CARPET ADHESIVES 50 <br />CARPET PAD ADHESIVES 50 <br />OUTDOOR CARPET ADHESIVES 150 <br />WOOD FLORING ADHESIVES 100 <br />RUBBER FLOOR ADHESIVES 60 <br />SUBFLOOR ADHESIVES 50 <br />CERAMIC TILES ADHESIVES 65 <br />VCT AND ASPHALTS TILE ADHESIVES 50 <br />DRYWALL AND PANEL ADHESIVES 50 <br />COVE BASE ADHESIVES 50 <br />MULTIPURPOSE CONSTRUCTION ADHESIVES 70 <br />STRUCTURAL GLAZING ADHESIVES 100 <br />SINGLE-PLY ROOF MEMBRANE ADHESIVES 250 <br />OTHER ADHESIVE NOT SPECIFICALLY USED 50 <br />SPECIALITY APPLICATIONS <br />PVC WELDING 510 <br />CPVC WELDING 490 <br />ABS WELDING 325 <br />PLASTIC CEMENT WELDING 250 <br />ADHESIVE PRIMER FOR PLASTIC 550 <br />CONTACT ADHESIVE 80 <br />SPECIAL PURPOSE CONTACT ADHESIVE 250 <br />STRUCTURAL WOOD MEMBRANE ADHESIVE 140 <br />TOP AND TRIM ADHESIVE 250 <br />SUBSTRATE SPECIFIC APPLICATIONS <br />METAL TO METAL 30 <br />PLASTIC FOAMS 50 <br />POROUS MATERIAL (EXCEPT WOOD)50 <br />WOOD 30 <br />FIBERGLASS 80 <br />SEALANTS CURRENT VOC LIMIT. <br />ARCHITECTURAL 250 <br />MARINE DECK 760 <br />NONMEMBRANE ROOF 300 <br />ROADWAY 250 <br />SINGLE -PLY ROOF MEMBRANE 450 <br />OTHER 420 <br />SEALANT PRIMERS <br />NONPOROUS 250 <br />POROUS 775 <br />MODIFIED BITUMINOUS 500 <br />MARINE DECK 760 <br />OTHER 750 <br />ADHESIVES, SEALANTS AND CAULKS USED ON THE PROJECT SHALL MEET THE <br />REQUIREMENTS OF THE FOLLOWING STANDARDS: <br />1. ADHESIVES, ADHESIVE BONDING PRIMERS, ADHESIVE PRIMERS, SEALANTS, <br /> SEALANT PRIMERS AND CAULKS SHALL COMPLY WITH LOCAL OR REGIONAL <br /> AIR POLLUTION CONTROL OR AIR QUALITY MANAGEMENT DISTRICT RULES <br /> WHERE APPLICABLE, OR SCAQMD RULE 1168 VOC LIMITS, AS SHOWN IN <br /> TABLES 5.504.4.1 AND 5.504.4.2. SUCH PRODUCTS ALSO SHALL COMPLY WITH <br /> THE RULE 1168 PROHIBITION ON THE USE OF CERTAIN TOXIC COMPOUNDS <br /> (CHLOROFORM, ETHYLENE DICHLORIDE, METHYLENE CHLORIDE, <br /> PERCHLOROETHYLENE AND TRICHLOROETHYLENE), EXCEPT FOR AEROSOL <br /> PRODUCTS AS SPECIFIED IN SUBSECTION 2, BELOW. <br />2. AEROSOL ADHESIVES, AND SMALLER UNIT SIZES OF ADHESIVES, AND <br /> SEALANT OR CAULKING COMPOUNDS (IN UNITS OF PRODUCT, LESS <br /> PACKAGING, WHICH DO NOT WEIGH MORE THAN ONE POUND AND DO NOT <br /> CONSIST OF MORE THAN 16 FLUID OUNCES) SHALL COMPLY WITH <br /> STATEWIDE VOC STANDARDS AND OTHER REQUIREMENTS, INCLUDING <br /> PROHIBITIONS ON USE OF CERTAIN TOXIC COMPOUNDS, OF CALIFORNIA <br /> CODE OF REGULATIONS, TITLE 17, COMMENCING WITH SECTION 94507. <br />ARCHITECTURAL <br />5.504.1 TEMPORARY VENTILATION. <br />1,2 <br />1. IF AN ADHESIVE IS USED TO BOND DISSIMILAR SUBSTRATES TOGETHER THE ADHESIVE <br />WITH THE HIGHEST VOC CONTENT SHALL BE ALLOWED. <br />2. FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC CONTENT <br />SPECIFIED IN THIS TABLE, SEE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE <br />1168, http://www.arb.ca.gov/DRDB/SC/CURHTML/R1168.PDF. <br />NOTE:FOR ADDITIONAL INFORMATION REGARDING METHODS TO MEASURE THE VOC <br />CONTENT SPECIFIED IN THESE TABLES, SEE SOUTH COAST AIR QUALITY MANAGEMENT <br />DISTRICT RULE 1168. <br />5.504.4.3.1 AEROSOL PAINTS AND COATINGS. <br />AEROSOL PAINTS AND COATINGS SHALL MEET THE PWMIR LIMITS FOR ROC IN <br />SECTION 94522(A)(3) AND OTHER REQUIREMENTS, INCLUDING PROHIBITIONS ON <br />USE OF CERTAIN TOXIC COMPOUNDS AND OZONE DEPLETING SUBSTANCES, IN <br />SECTIONS 94522(C)(2) AND (D)(2) OF CALIFORNIA CODE OF REGULATIONS, TITLE 17, <br />COMMENCING WITH SECTION 94520; AND IN AREAS UNDER THE JURISDICTION OF <br />THE BAY AREA AIR QUALITY MANAGEMENT DISTRICT ADDITIONALLY COMPLY WITH <br />THE PERCENT VOC BY WEIGHT OF PRODUCT LIMITS OF REGULATION 8 RULE 49. <br />5.504.4.3.2 VERIFICATION. <br />VERIFICATION OF COMPLIANCE WITH THIS SECTION SHALL BE PROVIDED AT THE <br />REQUEST OF THE ENFORCING AGENCY. DOCUMENTATION MAY INCLUDE, BUT IS <br />NOT LIMITED TO, THE FOLLOWING: <br />1. MANUFACTURER’S PRODUCT SPECIFICATION <br />2. FIELD VERIFICATION OF ON-SITE PRODUCT CONTAINERS <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE - NONRESIDENTIAL MANDATORY MEASURES <br />SECTION 5.504 POLLUTANT CONTROL <br />SECTION 5.505 INDOOR MOISTURE CONTROL <br />SECTION 5.506 INDOOR AIR QUALITY <br />(DSA-SS)EACH PUBLIC K-12 SCHOOL CLASSROOM, AS LISTED IN TABLE 120.1-A OF THE <br />CALIFORNIA ENERGY CODE, SHALL BE EQUIPPED WITH A CARBON DIOXIDE MONITOR OR <br />SENSOR THAT MEETS THE FOLLOWING REQUIREMENTS: <br />1.THE MONITOR OR SENSOR SHALL BE PERMANENTLY AFFIXED IN A TAMPER-PROOF <br />MANNER IN EACH CLASSROOM BETWEEN 3 AND 6 FEET (914 MM AND 1829 MM) ABOVE <br />THE FLOOR AND AT LEAST 5 FEET (1524 MM) AWAY FROM DOORS AND OPERABLE <br />WINDOWS. <br />2.WHEN THE MONITOR OR SENSOR IS NOT INTEGRAL TO AN ENERGY MANAGEMENT <br />CONTROL SYSTEM (EMCS), THE MONITOR OR SENSOR SHALL DISPLAY THE CARBON <br />DIOXIDE READINGS ON THE DEVICE. WHEN THE SENSOR IS INTEGRAL TO AN EMCS, <br />THE CARBON DIOXIDE READINGS SHALL BE AVAILABLE TO AND REGULARLY <br />MONITORED BY FACILITY PERSONNEL. <br />3.A MONITOR SHALL PROVIDE NOTIFICATION THROUGH A VISUAL INDICATOR ON THE <br />MONITOR WHEN THE CARBON DIOXIDE LEVELS IN THE CLASSROOM HAVE EXCEEDED <br />1,100 PPM. A SENSOR INTEGRAL TO AN EMCS SHALL PROVIDE NOTIFICATION TO <br />FACILITY PERSONNEL THROUGH A VISUAL AND/OR AUDIBLE INDICATOR WHEN THE <br />CARBON DIOXIDE LEVELS IN THE CLASSROOM HAVE EXCEEDED 1,100 PPM. <br />4.THE MONITOR OR SENSOR SHALL MEASURE CARBON DIOXIDE LEVELS AT MINIMUM <br />15-MINUTE INTERVALS AND SHALL MAINTAIN A RECORD OF PREVIOUS CARBON <br />DIOXIDE MEASUREMENTS OF NOT LESS THAN 30 DAYS DURATION. <br />5.THE MONITOR OR SENSOR USED TO MEASURE CARBON DIOXIDE LEVELS SHALL HAVE <br />THE CAPACITY TO MEASURE CARBON DIOXIDE LEVELS WITH A RANGE OF 400 PPM TO <br />2000 PPM OR GREATER. <br />6.THE MONITOR OR SENSOR SHALL BE CERTIFIED BY THE MANUFACTURER TO BE <br />ACCURATE WITHIN 75 PPM AT 1,000 PPM CARBON DIOXIDE CONCENTRATION AND <br />SHALL BE CERTIFIED BY THE MANUFACTURER TO REQUIRE CALIBRATION NO MORE <br />FREQUENTLY THAN ONCE EVERY 5 YEARS. <br />5.506.3 CARBON DIOXIDE (CO2) MONITORING IN CLASSROOMS. <br />SECTION 5.507 ENVIRONMENTAL COMFORT <br />DIVISION 5.5 – ENVIRONMENTAL QUALITY <br />5.504.4.6 RESILIENT FLOORING SYSTEMS. <br />WHERE RESILIENT FLOORING IS INSTALLED AT LEAST 80 PERCENT OF FLOOR AREA <br />RECEIVING RESILIENT FLOORING SHALL MEET THE REQUIREMENTS OF THE <br />CALIFORNIA DEPARTMENT OF PULBIC HEALTH, "STANDARD METHOD FOR THE <br />TESTING AND EVALUATION OF VOLATILE ORGANIC CHEMICAL EMISSIONS FROM <br />INDOOR SOURCES USING ENVIROMENTAL CHAMBERS." VERSION 1.2, JANUARY 2017 <br />(EMISSION TESTING METHOD FOR CALIFORNIA SPECIFICATION 01350). <br />SEE CALIFORNIA DEPARTMENT OF PUBLIC HEALTH'S WEBSITE FOR <br />CERTIFICATION PROGRAMS AND TESTING LABS. <br />https://www.cdph.ca.gov/Programs/CCDPHP/DEODC/EHLB/IAQ/Pages/VOC.aspx# <br />material <br />5.410.2 COMMISSIONING. <br />5.408.3 EXCAVATED SOIL AND LAND CLEARING DEBRIS. <br />100 PERCENT OF TREES, STUMPS, ROCKS AND ASSOCIATED VEGETATION AND <br />SOILS RESULTING PRIMARILY FROM LAND CLEARING SHALL BE REUSED OR <br />RECYCLED. FOR A PHASED PROJECT, SUCH MATERIAL MAY BE STICKPILED ON <br />SITE UNTIL THE STORAGE SITE IS DEVELOPED. <br />EXCEPTION: REUSE, EITHER ON-OR OFF-SITE, OF VEGETATION OR SOIL <br /> CONTAMINATED BY DISEASE OR PEST INFESTATION. <br />NOTES: <br />1. IF CONTAMINATION BY DISEASE OR PEST INFESTATION IS SUSPECTED,CONTACT <br />THE COUNTY AGRICULTURAL COMMISSIONER AND FOLLOW ITS DIRECTION FOR <br />RECYCLING OR DISPOSAL OF THE MATERIAL. <br />(www.cdfa.ca.gov/exec/county/county_contacts.html) <br />2. FOR A MAP OF KNOWN PEST AND/OR DISEASE QUARANTINE ZONES, CONSULT <br />WITH THE CALIFORNIA DEPARTMENT OF FOOD AND AGRICULTURE. (www.cdfa.ca.gov) <br />CONTRACTOR TO DEVELOP CONSTRUCTION WASTE MANAGEMENT PLAN AND <br />SUBMIT IT TO THE CITY FOR APPROVAL PRIOR TO THE START OF CONSTRUCTION. <br />SEE ARCHITECTURAL DRAWINGS. <br />PROVIDE READILY ACCESSIBLE AREAS THAT SERVE THE ENTIRE BUILDING AND ARE <br />IDENTIFIED FOR THE DEPOSITING, STORAGE AND COLLECTION OF NON-HAZARDOUS <br />MATERIALS FOR RECYCLING, INCLUDING (AT A MINIMUM) PAPER, CORRUGATED <br />CARDBOARD, GLASS, PLASTICS, ORGANIC WASTE AND METALS, OR MEET A <br />LAWFULLY ENACTED LOCAL RECYCLING ORDINANCE, IF MORE RESTRICTIVE. <br />EXCEPTION:RURAL JURISDICTIONS THAT MEET AND APPLY FOR THE EXEMPTION IN <br /> PUBLIC RESOURCES CODE 42649.82 (A)(2)(A) ET SEQ. SHALL ALSO BE <br /> EXEMPT FROM THE ORGANIC WASTE PORTION OF THIS SECTION. <br />[N] NEW BUILDINGS 10,000 SQUARE FEET AND OVER. FOR NEW BUILDINGS 10,000 SQUARE <br />FEET AND OVER, BUILDING COMMISSIONING SHALL BE INCLUDED IN THE DESIGN AND <br />CONSTRUCTION PROCESSES OF THE BUILDING PROJECT TO VERIFY THAT THE BUILDING <br />SYSTEMS AND COMPONENTS MEET THE OWNER’S OR OWNER REPRESENTATIVE’S <br />PROJECT REQUIREMENTS. COMMISSIONING SHALL BE PERFORMED IN ACCORDANCE <br />WITH THIS SECTION BY TRAINED PERSONNEL WITH EXPERIENCE ON PROJECTS OF <br />COMPARABLE SIZE AND COMPLEXITY. FOR I-OCCUPANCIES THAT ARE NOT REGULATED BY <br />OSHPD OR FOR I-OCCUPANCIES AND L-OCCUPANCIES THAT ARE NOT REGULATED BY THE <br />CALIFORNIA ENERGY CODE SECTION 100.0 SCOPE, ALL REQUIREMENTS IN SECTIONS <br />5.410.2 THROUGH 5.410.2.6 SHALL APPLY. <br />NOTES: <br />FOR ENERGY-RELATED SYSTEMS UNDER THE SCOPE (SECTION 100) OF THE CALIFORNIA <br />ENERGY CODE, INCLUDING HEATING, VENTILATION, AIR CONDITIONING (HVAC) SYSTEMS <br />AND CONTROLS, INDOOR LIGHTING SYSTEMS AND CONTROLS, AS WELL AS W ATER <br />HEATING SYSTEMS AND CONTROLS, REFER TO CALIFORNIA ENERGY CODE SECTION 120.8 <br />FOR COMMISSIONING REQUIREMENTS. <br />COMMISSIONING REQUIREMENTS SHALL INCLUDE: <br />1. OWNER’S OR OWNER REPRESENTATIVE’S PROJECT REQUIREMENTS. <br />2. BASIS OF DESIGN. <br />3. COMMISSIONING MEASURES SHOWN IN THE CONSTRUCTION DOCUMENTS. <br />4. COMMISSIONING PLAN. <br />5. FUNCTIONAL PERFORMANCE TESTING. <br />6. DOCUMENTATION AND TRAINING. <br />7. COMMISSIONING REPORT. <br />EXCEPTIONS: <br />1. UNCONDITIONED WAREHOUSES OF ANY SIZE. <br />2. AREAS LESS THAN 10,000 SQUARE FEET USED FOR OFFICES OR OTHER <br /> CONDITIONED ACCESSORY SPACES WITHIN UNCONDITIONED W AREHOUSES. <br />3. TENANT IMPROVEMENTS LESS THAN 10,000 SQUARE FEET AS DESCRIBED IN <br /> SECTION 303.1.1. <br />4. OPEN PARKING GARAGES OF ANY SIZE, OR OPEN PARKING GARAGE AREAS, OF ANY <br /> SIZE, WITHIN A STRUCTURE. <br />NOTE: FOR THE PURPOSES OF THIS SECTION, UNCONDITIONED SHALL MEAN A BUILDING, <br /> AREA OR ROOM WHICH DOES NOT PROVIDE HEATING AND OR AIR CONDITIONING. <br />INFORMATIONAL NOTE: <br />1. FUNCTIONAL PERFORMANCE TESTING FOR HEATING, VENTILATION, AIR <br /> CONDITIONING SYSTEMS AND LIGHTING CONTROLS MUST BE PERFORMED IN <br /> COMPLIANCE WITH THE CALIFORNIA ENERGY CODE. <br />N/A <br />5.410.2.1 OWNER'S OR OWNER REPRESENTATIVE'S PROJECT <br />REQUIREMENTS (OPR). <br />THE EXPECTATIONS AND REQUIREMENTS OF THE BUILDING APPROPRIATE <br />TO ITS PHASE SHALL BE DOCUMENTED BEFORE THE DESIGN PHASE OF THE <br />PROJECT BEGINS. THIS DOCUMENTATION SHALL INCLUDE ITEMS 1 THROUGH <br />6 LISTED IN THIS SECTION. <br />[N] THE EXPECTATIONS AND REQUIREMENTS OF THE BUILDING APPROPRIATE TO <br />ITS PHASE SHALL BE DOCUMENTED BEFORE THE DESIGN PHASE OF THE PROJECT <br />BEGINS. THIS DOCUMENTATION SHALL INCLUDE THE FOLLOWING: <br />1. ENVIRONMENTAL AND SUSTAINABILITY GOALS. <br />2. BUILDING SUSTAINABLE GOALS. <br />3. INDOOR ENVIRONMENTAL QUALITY REQUIREMENTS. <br />4. PROJECT PROGRAM, INCLUDING FACILITY FUNCTIONS AND HOURS OF <br /> OPERATION, AND NEED FOR AFTER HOURS OPERATION. <br />5. EQUIPMENT AND SYSTEMS EXPECTATIONS. <br />6. BUILDING OCCUPANT AND OPERATION AND MAINTENANCE (O&M) <br /> PERSONNEL EXPECTATIONS. <br />N/A <br />5.410.2.2 BASIS OF DESIGN (BOD). <br />[N] A WRITTEN EXPLANATION OF HOW THE DESIGN OF THE BUILDING SYSTEMS <br />MEETS THE OPR SHALL BE COMPLETED AT THE DESIGN PHASE OF THE BUILDING <br />PROJECT. THE BASIS OF DESIGN DOCUMENT SHALL COVER THE FOLLOWING <br />SYSTEMS: <br />1. RENEWABLE ENERGY SYSTEMS. <br />2. LANDSCAPE IRRIGATION SYSTEMS. <br />3. WATER REUSE SYSTEMS. <br />5.410.2.3 COMMISSIONING PLAN <br />[N] PRIOR TO PERMIT ISSUANCE A COMMISSIONING PLAN SHALL BE <br />COMPLETED TO DOCUMENT HOW THE PROJECT WILL BE COMMISSIONED. <br />THE COMMISSIONING PLAN SHALL INCLUDE THE FOLLOWING: <br />1. GENERAL PROJECT INFORMATION. <br />2. COMMISSIONING GOALS. <br />3. SYSTEMS TO BE COMMISSIONED. PLANS TO TEST SYSTEMS AND <br /> COMPONENTS SHALL INCLUDE: <br />A. AN EXPLANATION OF THE ORIGINAL DESIGN INTENT. <br />B. EQUIPMENT AND SYSTEMS TO BE TESTED, INCLUDING THE <br /> EXTENT OF TESTS. <br />C. FUNCTIONS TO BE TESTED. <br />D. CONDITIONS UNDER WHICH THE TEST SHALL BE PERFORMED. <br />E. MEASURABLE CRITERIA FOR ACCEPTABLE PERFORMANCE. <br />4. COMMISSIONING TEAM INFORMATION. <br />5. COMMISSIONING PROCESS ACTIVITIES, SCHEDULES AND <br /> RESPONSIBILITIES. PLANS FOR THE COMPLETION OF <br /> COMMISSIONING SHALL BE INCLUDED. <br />ALL ADDITIONS CONDUCTED WITHIN A 12-MONTH PERIOD UNDER SINGLE <br />OR MULTIPLE PERMITS, RESULTING IN AN INCREASE OF 30 PERCENT OR <br />MORE IN FLOOR AREA, SHALL PROVIDE RECYCLING AREAS ON SITE. <br />EXCEPTION: <br />ADDITIONS WITHIN A TENANT SPACE RESULTING IN LESS THAN A 30-PERCENT <br />INCREASE IN THE TENANT SPACE FLOOR AREA. <br />5.410.1.1 ADDITIONS. <br />5.410.1.2 SAMPLE ORDINANCE. <br />SPACE ALLOCATION FOR RECYCLING AREAS SHALL COMPLY W ITH CHAPTER 18, <br />PART 3, DIVISION 30 OFTHE PUBLIC RESOURCES CODE. CHAPTER 18 IS KNOWN AS <br />THE CALIFORNIA SOLID WASTE REUSE AND RECYCLING ACCESS ACT OF 1991 (ACT). <br />NOTE: <br />A SAMPLE ORDINANCE FOR USE BY LOCAL AGENCIES MAY BE FOUND IN APPENDIX A <br />OF THE DOCUMENT AT THE CALRECYCLE’S WEB SITE. <br />N/A <br />N/A <br />5.410.1 RECYCLING BY OCCUPANTS. <br />SECTION 5.410 BUILDING MAINTENANCE AND OPERATION <br />5.410.2.4 FUNCTIONAL PERFORMANCE TESTING. <br />[N] FUNCTIONAL PERFORMANCE TESTS SHALL DEMONSTRATE THE CORRECT <br />INSTALLATION AND OPERATION OF EACH COMPONENT, SYSTEM AND SYSTEM-TO- <br />SYSTEM INTERFACE IN ACCORDANCE WITH THE APPROVED PLANS AND <br />SPECIFICATIONS. FUNCTIONAL PERFORMANCE TESTING REPORTS SHALL CONTAIN <br />INFORMATION ADDRESSING EACH OF THE BUILDING COMPONENTS TESTED, THE <br />TESTING METHODS UTILIZED, AND INCLUDE ANY READINGS AND ADJUSTMENTS MADE. <br />SEE MEP SPECIFICATIONS. <br />INSTALL ONLY A DIRECT-VENT SEALED-COMBUSTION GAS OR SEALED WOOD- <br />BURNING FIREPLACE, OR A SEALED WOOD-STOVE OR PELLET STOVE, AND REFER <br />TO RESIDENTIAL REQUIREMENTS IN THE CALIFORNIA ENERGY CODE, TITLE 24, <br />PART 6, SUBCHAPTER 7, SECTION 150. WOODSTOVES, PELLET STOVES AND <br />FIREPLACES SHALL COMPLY WITH APPLICABLE LOCAL ORDINANCES. <br />5.503.1.1 WOODSTOVES. <br />WOODSTOVE AND PELLET STOVES SHALL COMPLY WITH US EPA NEW SOURCE <br />PERFORMANCE STANDARDS (NSPS) EMISSION LIMITS AS APPLICABLE, AND SHALL <br />HAVE A PERMANENT LABEL INDICATING THEY ARE CERTIFIED TO MEET THE <br />EMISSION LIMITS. <br />5.503.1 FIREPLACES. <br />5.410.4.5.1 INSPECTIONS AND REPORTS. <br />5.410.4.3.1 HVAC BALANCING. <br />5.410.4.3 PROCEDURES. <br />5.410.4.2 SYSTEMS. <br />5.410.4 TESTING AND ADJUSTING. NEW BUILDINGS LESS THAN <br />10,000 SQUARE FEET. <br />TESTING AND ADJUSTING OF SYSTEMS SHALL BE REQUIRED FOR NEW BUILDINGS <br />LESS THAN 10,000 SQUARE FEET OR NEW SYSTEMS TO SERVE AN ADDITION OR <br />ALTERATION SUBJECT TO SECTION 303.1. <br />N/A <br />DEVELOP A WRITTEN PLAN OF PROCEDURES FOR TESTING AND ADJUSTING <br />SYSTEMS. SYSTEMS TO BE INCLUDED FOR TESTING AND ADJUSTING SHALL <br />INCLUDE, AS APPLICABLE TO THE PROJECT: <br />1. RENEWABLE ENERGY SYSTEMS. <br />2. LANDSCAPE IRRIGATION SYSTEMS. <br />3. WATER REUSE SYSTEMS. <br />PERFORM TESTING AND ADJUSTING PROCEDURES IN ACCORDANCE WITH <br />MANUFACTURER'S SPECIFICATIONS AND APPLICABLE STANDARDS ON EACH <br />SYSTEM. <br />N/A <br />IN ADDITION TO TESTING AND ADJUSTING, BEFORE A NEW SPACE-CONDITIONING <br />SYSTEM SERVING A BUILDING OR SPACE IS OPERATED FOR NORMAL USE, BALANCE THE <br />SYSTEM IN ACCORDANCE WITH THE PROCEDURES DEFINED BY THE TESTING ADJUSTING <br />AND BALANCING BUREAU NATIONAL STANDARDS; THE NATIONAL ENVIRONMENTAL <br />BALANCING BUREAU PROCEDURAL STANDARDS; ASSOCIATED AIR BALANCE COUNCIL <br />NATIONAL STANDARDS OR AS APPROVED BY THE ENFORCING AGENCY. <br />INCLUDE A COPY OF ALL INSPECTION VERIFICATIONS AND REPORTS REQUIRED BY <br />THE ENFORCING AGENCY. <br />N/A <br />5.410.4.5 OPERATION AND MAINTENANCE (O & M) MANUAL. <br />5.410.4.4 REPORTING. <br />AFTER COMPLETION OF TESTING, ADJUSTING AND BALANCING, PROVIDE A FINAL <br />REPORT OF TESTING SIGNED BY THE INDIVIDUAL RESPONSIBLE FOR <br />PERFORMING THESE SERVICES. <br />PROVIDE THE BUILDING OWNER OR REPRESENTATIVE WITH DETAILED OPERATING <br />AND MAINTENANCE INSTRUCTIONS AND COPIES OF GUARANTIES/WARRANTIES FOR <br />EACH SYSTEM. O & M INSTRUCTIONS SHALL BE CONSISTENT WITH OSHA <br />REQUIREMENTS IN CCR, TITLE 8, SECTION 5142, AND OTHER RELATED REGULATIONS. <br />N/A <br />N/A <br />N/A <br />N/A <br />5.410.2.6 COMMISSIONING REPORT. <br />5.410.2.5.2 SYSTEMS OPERATIONS TRAINING. <br />5.410.2.5.1 SYSTEMS MANUAL. <br />5.410.2.5 DOCUMENTATION AND TRAINING. <br />[N] A SYSTEMS MANUAL AND SYSTEMS OPERATIONS TRAINING ARE REQUIRED, <br />INCLUDING OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) REQUIREMENTS IN <br />CALIFORNIA CODE OF REGULATIONS (CCR), TITLE 8, SECTION 5142, AND OTHER <br />RELATED REGULATIONS. <br />[N] DOCUMENTATION OF THE OPERATIONAL ASPECTS OF THE BUILDING SHALL BE <br />COMPLETED WITHIN THE SYSTEMS MANUAL AND DELIVERED TO THE BUILDING <br />OWNER OR REPRESENTATIVE. THE SYSTEMS MANUAL SHALL INCLUDE THE <br />FOLLOWING: <br />1. SITE INFORMATION, INCLUDING FACILITY DESCRIPTION, HISTORY AND <br />CURRENT REQUIREMENTS. <br />2. SITE CONTACT INFORMATION. <br />3. BASIC OPERATIONS AND MAINTENANCE, INCLUDING GENERAL SITE <br /> OPERATING PROCEDURES, BASIC TROUBLESHOOTING, RECOMMENDED <br /> MAINTENANCE REQUIREMENTS, SITE EVENTS LOG. <br />4. MAJOR SYSTEMS. <br />5. SITE EQUIPMENT INVENTORY AND MAINTENANCE NOTES. <br />6. A COPY OF VERIFICATIONS REQUIRED BY THE ENFORCING AGENCY OR THIS <br /> CODE. <br />7. OTHER RESOURCES AND DOCUMENTATION, IF APPLICABLE. <br />[N]A PROGRAM FOR TRAINING OF THE APPROPRIATE MAINTENANCE STAFF FOR <br />EACH EQUIPMENT TYPE AND/OR SYSTEM SHALL BE DEVELOPED AND <br />DOCUMENTED IN THE COMMISSIONING REPORT AND SHALL INCLUDE THE <br />FOLLOWING: <br />1. SYSTEM/EQUIPMENT OVERVIEW (WHAT IT IS, WHAT IT DOES AND WITH WHAT <br /> OTHER SYSTEMS AND/OR EQUIPMENT IT INTERFACES). <br />2. REVIEW AND DEMONSTRATION OF SERVICING/PREVENTIVE MAINTENANCE. <br />3. REVIEW OF THE INFORMATION IN THE SYSTEMS MANUAL. <br />4. REVIEW OF THE RECORD DRAWINGS ON THE SYSTEM/EQUIPMENT. <br />[N] A REPORT OF COMMISSIONING PROCESS ACTIVITIES UNDERTAKEN THROUGH <br />THE DESIGN AND CONSTRUCTION PHASES OF THE BUILDING PROJECT SHALL BE <br />COMPLETED AND PROVIDED TO THE OWNER OR REPRESENTATIVE. <br />SEE MEP SPECIFICATIONS. <br />5.410.4.1 (RESERVED) <br />NOTE: FOR ENERGY-RELATED SYSTEMS UNDER THE SCOPE (SECTION 100) OF THE <br />CALIFORNIA ENERGY CODE, INCLUDING HEATING, VENTILATION, AIR CONDITIONING <br />(HVAC) SYSTEMS AND CONTROLS, INDOOR LIGHTING SYSTEM AND CONTROLS, AS <br />WELL AS WATER HEATING SYSTEMS AND CONTROLS, REFER TO CALIFORNIA <br />ENERGY CODE SECTION 120.8 FOR COMMISSIONING REQUIREMENTS AND SECTIONS <br />120.5, 120.6, 130.4 AND 140.9(B)3 FOR ADDITIONAL TESTING REQUIREMENTS OF <br />SPECIFIC SYSTEMS. <br />THE PROVISIONS OF THIS CHAPTER SHALL OUTLINE MEANS OF REDUCING THE <br />QUANTITY OF AIR CONTAMINANTS THAT ARE ODOROUS, IRRITATING AND/OR <br />HARMFUL TO THE COMFORT AND WELL-BEING OF A BUILDING’S INSTALLERS, <br />OCCUPANTS AND NEIGHBORS. <br />5.501.1 SCOPE. <br />SECTION 5.501 GENERAL <br />SECTION5.503 FIREPLACES <br />N/A <br />DIVISION 5.4 – MATERIAL CONSERVATION AND <br />RESOURCE EFFICIENCY <br />[BSC-CG] PROJECTS CONSISTING OF NEWLY CONSTRUCTED BUILDING(S) WITH A <br />COMBINED FLOOR AREA OF 100,000 SQUARE FEET OR GREATER SHALL COMPLY WITH <br />EITHER SECTION 5.409.2 OR SECTION 5.409.3. ALTERATION(S) TO EXISTING <br />BUILDING(S) WHERE THE COMBINED ALTERED FLOOR AREA IS 100,000 SQUARE FEET <br />OR GREATER SHALL COMPLY WITH EITHER SECTION 5.105.2, 5.409.2, OR 5.409.3. <br />ADDITION(S) TO EXISTING BUILDING(S) WHERE THE TOTAL FLOOR AREA COMBINED <br />WITH THE EXISTING BUILDING(S) IS 100,000 SQUARE FEET OR GREATER SHALL <br />COMPLY WITH EITHER SECTION 5.105.2, SECTION 5.409.2, OR SECTION 5.409.3. <br />EFFECTIVE JANUARY 1, 2026, THE COMBINED FLOOR AREA SHALL BE 50,000 SQUARE <br />FEET OR GREATER. <br />[DSA-SS] PROJECTS CONSISTING OF NEWLY CONSTRUCTED BUILDING(S) WITH A <br />COMBINED FLOOR AREA OF 50,000 SQUARE FEET OR GREATER SHALL COMPLY WITH <br />EITHER SECTION 5.409.2 OR SECTION 5.409.3. ALTERATION(S) TO EXISTING <br />BUILDING(S) WHERE THE COMBINED ALTERED FLOOR AREA IS 50,000 SQUARE FEET <br />OR GREATER SHALL COMPLY WITH EITHER SECTION 5.105.2, 5.409.2, OR 5.409.3. <br />ADDITION(S) TO EXISTING BUILDING(S) WHERE THE TOTAL FLOOR AREA COMBINED <br />WITH THE EXISTING BUILDING(S) IS 50,000 SQUARE FEET OR GREATER SHALL COMPLY <br />WITH EITHER SECTION 5.105.2, SECTION 5.409.2, OR SECTION 5.409.3. <br />5.409.1 SCOPE. <br />SECTION 5.409 LIFE CYCLE ASSESSMENT <br />PROJECTS SHALL CONDUCT A CRADLE-TO-GRAVE WHOLE BUILDING LIFE CYCLE <br />ASSESSMENT PERFORMED IN ACCORDANCE WITH ISO 14040 AND ISO 14044, <br />EXCLUDING OPERATING ENERGY, AND DEMONSTRATING A MINIMUM 10-PERCENT <br />REDUCTION IN GLOBAL WARMING POTENTIAL (GWP) AS COMPARED TO A REFERENCE <br />BASELINE BUILDING OF SIMILAR SIZE, FUNCTION, COMPLEXITY, TYPE OF <br />CONSTRUCTION, MATERIAL SPECIFICATION, AND LOCATION THAT MEETS THE <br />REQUIREMENTS OF THE CALIFORNIA ENERGY CODE CURRENTLY IN EFFECT. <br />SOFTWARE USED TO CONDUCT THE WHOLE BUILDING LIFE CYCLE ASSESSMENT, <br />INCLUDING REFERENCE BASELINE BUILDING, SHALL HAVE A DATA SET COMPLIANT <br />WITH ISO 14044, AND ISO 21930 OR EN 15804, AND THE SOFTWARE SHALL CONFORM <br />TO ISO 21931 AND/OR EN 15978. THE SOFTWARE TOOLS AND DATA SETS SHALL BE <br />THE SAME FOR EVALUATION OF BOTH THE BASELINE BUILDING AND THE PROPOSED <br />BUILDING. <br />NOTES: <br />1. SOFTWARE FOR CALCULATING WHOLE BUILDING LIFE CYCLE ASSESSMENT IS <br />AVAILABLE FOR FREE AT ATHENA SUSTAINABLE MATERIALS INSTITUTE <br />(HTTPS://CALCULATELCA.COM/SOFTWARE/ IMPACT-ESTIMATOR/) AND <br />ONECLICK LCA-PLANETARY (WWW.ONECLICKLCA.COM/PLANETARY). PAID <br />VERSIONS INCLUDE, BUT ARE NOT LIMITED TO, SPHERA GABI SOLUTIONS <br />(GABI.SPHERA.COM), SIMAPRO (SIMAPRO.COM), ONE-CLICK LCA <br />(WWW.ONECLICKLCA.COM) AND TALLY FOR REVIT (APPS.AUTODESK.COM). <br />2. ASTM E2921-22 “STANDARD PRACTICE FOR MINIMUM CRITERIA FOR <br />COMPARING WHOLE BUILDING LIFE CYCLE ASSESSMENTS FOR USE WITH <br />BUILDING CODES, STANDARDS, AND RATING SYSTEMS”MAY BE CONSULTED <br />FOR THE ASSESSMENT. <br />3. IN ADDITION TO THE REQUIRED DOCUMENTATION SPECIFIED IN SECTION <br />5.409.2.3, WORKSHEET WS-9 MAY BE REQUIRED BY THE ENFORCING ENTITY <br />TO DEMONSTRATE COMPLIANCE WITH THE REQUIREMENTS. <br />5.409.2 WHOLE BUILDING LIFE CYCLE ASSESSMENT. <br />BUILDING ENCLOSURE COMPONENTS INCLUDED IN THE ASSESSMENT SHALL <br />BE LIMITED TO GLAZING ASSEMBLIES, INSULATION, AND EXTERIOR FINISHES. <br />PRIMARY AND SECONDARY STRUCTURAL MEMBERS INCLUDED IN THE <br />ASSESSMENT SHALL BE LIMITED TO FOOTINGS AND FOUNDATIONS, AND <br />STRUCTURAL COLUMNS, BEAMS, WALLS, ROOFS, AND FLOORS. <br />5.409.2.1 BUILDING COMPONENTS. <br />THE REFERENCE STUDY PERIOD OF THE PROPOSED BUILDING SHALL BE <br />EQUAL TO THE REFERENCE BASELINE BUILDING AND SHALL BE 60 YEARS. <br />5.409.2.2 REFERENCE STUDY PERIOD. <br />A SUMMARY OF THE GWP ANALYSIS PRODUCED BY THE SOFTWARE AND <br />WORKSHEET WS-4 SIGNED BY THE DESIGN PROFESSIONAL OF RECORD <br />SHALL BE PROVIDED IN THE CONSTRUCTION DOCUMENTS AS DOCUMEN- <br />TATION OF COMPLIANCE. A COPY OF THE WHOLE BUILDING LIFE CYCLE <br />ASSESSMENT WHICH INCLUDES THE GWP ANALYSIS PRODUCED BY THE <br />SOFTWARE, IN ADDITION TO MAINTENANCE AND TRAINING INFORMATION, <br />SHALL BE INCLUDED IN THE OPERATION AND MAINTENANCE MANUAL AND <br />SHALL BE PROVIDED TO THE OWNER AT THE CLOSE OF CONSTRUCTION. THE <br />ENFORCING AGENCY MAY REQUIRE INSPECTION AND INSPECTION REPORTS <br />IN ACCORDANCE WITH SECTIONS 702.2 AND 703.1 DURING AND AT COM- <br />PLETION OF CONSTRUCTION TO DEMONSTRATE SUBSTANTIAL <br />CONFORMANCE. INSPECTION SHALL BE PERFORMED BY THE DESIGN <br />PROFESSIONAL OF RECORD OR THIRD PARTY ACCEPTABLE TO THE <br />ENFORCING AGENCY. <br />5.409.2.3 VERIFICATION OF COMPLIANCE. <br />EACH PRODUCT THAT IS PERMANENTLY INSTALLED AND LISTED IN TABLE 5.409.3 <br />SHALL HAVE A TYPE III ENVIRONMENTAL PRODUCT DECLARATION (EPD), EITHER <br />PRODUCT-SPECIFIC OR FACTORY-SPECIFIC. <br />5.409.3 PRODUCT GWP COMPLIANCE - PRESCRPTIVE PATH. <br />5.409.3.1 PRODUCTS SHALL NOT EXCEED THE MAXIMUM GWP VALUE SPECIFIED <br />IN TABLE 5.409.3. <br />EXCEPTION: CONCRETE MAY BE CONSIDERED ONE PRODUCT CATEGORY <br />TO MEET COMPLIANCE WITH THIS SECTION. A WEIGHTED AVERAGE OF THE <br />MAXIMUM GWP FOR ALL CONCRETE MIXES INSTALLED IN THE PROJECT <br />SHALL BE LESS THAN THE WEIGHTED AVERAGE MAXIMUM GWP ALLOWED <br />PER TABLE 5.409.3 USING EXCEPTION EQUATION 5.409.3.1. CALCULATIONS <br />SHALL BE PERFORMED WITH CONSISTENT UNITS OF MEASUREMENT FOR <br />THE MATERIAL QUANTITY AND THE GWP VALUE. <br />FOR THE PURPOSES OF THIS EXCEPTION, INDUSTRY-WIDE EPDS ARE <br />ACCEPTABLE. <br />EXCEPTION EQUATION 5.409.3.1 <br />GWP < GWP allowed <br />WHERE <br />GWPn = Σ (GWPn )(Vn) <br />AND <br />GWPallowed = Σ (GWPallowed)(Vn) <br />AND <br />n = EACH CONCRETE MIX INSTALLED IN THE PROJECT <br />GWPn = THE GWP FOR CONCRETE MIX n PER CONCRETE MIX EPD, <br /> IN kg CO2e/m3 <br />GWPallowed = THE GWP POTENTIAL ALLOWED FOR CONCRETE MIX n PER <br /> TABLE 5.409.3 <br />Vn = THE VOLUME OF CONCRETE MIX n INSTALLED IN THE <br /> PROJECT, IN m3 <br />5.409.3.2 VERIFICATION OF COMPLIANCE. <br />CALCULATIONS TO DEMONSTRATE COMPLIANCE, TYPE III EPDS FOR <br />PRODUCTS REQUIRED TO COMPLY, IF INCLUDED IN THE PROJECT, AND <br />WORK-SHEET WS-5 SIGNED BY THE DESIGN PROFESSIONAL OF RECORD <br />SHALL BE PROVIDED ON THE CONSTRUCTION DOCUMENTS. UPDATED EPDS <br />FOR PRODUCTS USED IN CONSTRUCTION SHALL BE PROVIDED TO THE <br />OWNER AT THE CLOSE OF CONSTRUCTION AND TO THE ENFORCEMENT <br />ENTITY UPON REQUEST. THE ENFORCING AGENCY MAY REQUIRE <br />INSPECTION AND INSPECTION REPORTS IN ACCORDANCE WITH SECTIONS <br />702.2 AND 703.1 DURING AND AT COMPLETION OF CONSTRUCTION TO <br />DEMONSTRATE SUBSTANTIAL CONFORMANCE. INSPECTION SHALL BE <br />PERFORMED BY THE DESIGN PROFESSIONAL OF RECORD OR THIRD PARTY <br />ACCEPTABLE TO THE ENFORCING AGENCY. <br />BUY CLEAN CALIFORNIA <br />MATERIALS PRODUCT CATEGORY <br />MAXIMUM ACCEPTABLE GWP <br />VALUE (UNFABRICATED) <br />(GWPallowed) <br />HOT-ROLLED STRUCTURAL <br />STEEL SECTIONS <br />HOLLOW STRUCTURAL SECTIONS <br />STEEL PLATE <br />CONCRETE REINFORCING STEEL <br />FLAT GLASS <br />LIGHT-DENSITY MINERAL <br />WOOL BOARD INSULATION <br />HEAVY-DENSITY MINERAL <br />WOOL BOARD INSULATION <br />UP TO 2499 psi <br />TABLE 5.409.3 <br />PRODUCT GWP LIMITS <br />UNIT OF <br />MEASUREMENT <br />1.77 <br />3.00 <br />2.61 <br />1.56 <br />2.50 <br />5.83 <br />14.28 <br />CONCRETE, READY-MIXED2,3 <br />BUY CLEAN CALIFORNIA <br />MATERIALS PRODUCT CATEGORY <br />MAXIMUM ACCEPTABLE GWP <br />VALUE (UNFABRICATED) <br />(GWPallowed) <br />UNIT OF <br />MEASUREMENT <br />kg CO2e/MT <br />kg CO2e/1 m2 <br />MT CO2e/MT <br />MT CO2e/MT <br />MT CO2e/MT <br />MT CO2e/MT <br />kg CO2e/1 m2 <br />2500 -3499 psi <br />3500 -4499 psi <br />4500 -5499 psi <br />5500 -6499 psi <br />6500 psi AND GREATER <br />450 <br />489 <br />566 <br />661 <br />701 <br />799 <br />kg CO2e/m2 <br />CONCRETE, LIGHTWEIGHT READY-MIXED2 <br />UP TO 2499 psi <br />2500 -3499 psi <br />3500 -4499 psi <br />875 <br />956 <br />1039 <br />kg CO2e/m3 <br />1. THE GWP VALUES OF THE PRODUCTS LISTED IN TABLE 5.409.3 ARE BASED ON 175 PERCENT <br />OF BUY CLEAN CALIFORNIA ACT (BCCA) GWP VALUES, EXCEPT FOR CONCRETE PRODUCTS <br />WHICH ARE NOT INCLUDED IN THE BCCA. <br />2. FOR CONCRETE, 175 PERCENT OF THE NATIONAL READY MIXED CONCRETE <br />ASSOCIATION (NRMCA) 2022 VERSION 3 PACIFIC SOUTHWEST REGIONAL BENCHMARK <br />VALUES ARE USED FOR THE GWP ALLOWED, EXCEPT FOR HIGH EARLY STRENGTH. <br />3.CONCRETE HIGH EARLY STRENGTH READY-MIXED SHALL BE CALCULATED AT 130 PERCENT <br />OF THE READY-MIXED CONCRETE GWP ALLOWED VALUES FOR EACH PRODUCT CATEGORY. <br />kg CO2e/m2 <br />kg CO2e/m2 <br />kg CO2e/m2 <br />kg CO2e/m2 <br />kg CO2e/m2 <br />kg CO2e/m3 <br />kg CO2e/m3 <br />COMPLY WITH 5.409.3 PRODUCT GWP PRESCRIPTIVE PATH <br />N/A <br />N/A <br />N/A <br />DA <br />T <br />E <br /> <br />R <br />E <br />M <br />A <br />R <br />K <br />S <br />08 <br />/ <br />2 <br />5 <br />/ <br />2 <br />0 <br />2 <br />5 <br /> <br />I <br />S <br />S <br />U <br />E <br />D <br /> <br />F <br />O <br />R <br /> <br />P <br />E <br />R <br />M <br />I <br />T <br />11 <br />/ <br />3 <br />0 <br />/ <br />2 <br />0 <br />2 <br />5 <br />11 <br />/ <br />3 <br />0 <br />/ <br />2 <br />0 <br />2 <br />7 <br />03 <br />/ <br />0 <br />5 <br />/ <br />2 <br />0 <br />2 <br />6 <br /> <br /> <br />- <br /> <br /> <br />P <br />L <br />A <br />N <br /> <br />C <br />H <br />E <br />C <br />K <br /> <br />R <br />E <br />S <br />U <br />B <br />M <br />I <br />T <br />T <br />A <br />L