Laserfiche WebLink
) <br />ExPEDITED PERMIT PnoCESS FoR PV SysTEMS <br />STnNDARD STRING SySTEM <br />The Solar America Board for Codes and Standards (Solar ABCs) Expedited Permir pro- <br />cess provides a means to difierentiate systems that can be permitted quickly and easily <br />due to their similarity with the majority of small-scale PV systems. Those systems wirh <br />unique characteristics may be handled with small additions to this Expedited permit <br />Process or may require much more information, depending on the uniqueness of the <br />installation. <br />The following pages contain forms for the Standard String System to use with the Expe- <br />dited Permit Process. The Micro-lnverter, AC Module, and Supply-Side Connection forms <br />are also available as interactive PDF files at www.solarabcs.org/permirting. In jurisdic- <br />tions that have adopted the Expedited Permit Process for PV Systems, these forms can <br />be filled out electronically and submitted in either printed form and via email. An elec- <br />tronic format is used so that the supplied information is srandardized and legible for the <br />local jurisdiction. <br />ExpEDITED PTnmIT PnocESS FoR PV SysTEMS <br />a