My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
101107254 - Permit
PBA
>
Building
>
Permits
>
R
>
Rita Way
>
2910 S Rita Way
>
101107254 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 9:37:31 AM
Creation date
9/30/2021 3:07:26 PM
Metadata
Fields
Template:
Permit
Permit Number
101107254
Full Address
2910 S Rita Way
Permit ID
277104
Master ID Number
2021-167479
Project Name
Miscellaneous Counter1 Permit
Street Number
002910
Street Direction
S
Street Name
Rita
Street Suffix
Way
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
7/16/2021
Issued Date
7/16/2021
Finalized Date
9/23/2021
Flood Zone
X-0602320259J
Description of Work
Install solar panels
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
{ <br />EXPTDITEO PERMIT PNOCESS FOR SUNII-SCALE PV SYSTTUS <br />SIRNoRno SrRrNc Sysre pr <br />The information in this guideline is intended to help localjurisdictions and contractors identify when PV system installations <br />are simple, needing only a basic review and when an installation is more complex. It is likely that 50%-75% of all residential <br />systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been <br />suggested to provide as a path to permit approval. <br />Re quire d Information for Permit : <br />l. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3' perimeter space at ridge and sides may not need separate fire service review. <br />2. Electrical diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnects, <br />required signs, and ac connection to building (see supplied standard electrical diagram). <br />3. Specifrcacion sheets and installation manuals (if available) for all manufactured components including, but not <br />limited to, PV modules, inverter(s), combiner box, disconnects, and mounting system. <br />Step 1: Structural Review of PV Array Mounting System <br />Is the array to be mounted on a dehned, permitted roof structuret Eyes Er.lo <br />IJ No due to non-compliant roof or a ground mount, submit completed worksheet Jor the stucture WKSI. <br />Roof Information: <br />l. ls the roofing type lightweight (Yes = composition, lightweight masonry, metal, etc.) Composition Shingles <br />I <br />If No,submitcompletedworksheetJorroof structureWKS| (No = heovymasonry,slate,etc...). <br />2. Does the roof have a single roof coveringz Elves E uo <br />If No, submit completed worksheetJor roof structure WKSI . <br />3. Provide method and type of weatherproofing roof penetrations (e.9. flashing. caulk)Flashing <br />M ounting Sy stem Information : <br />1 . Is the rnounting structure an <br />beneath the module frarnes? <br />Name and Model# SNAPNRACK ULTRA <br />"ffil"."E1ljoduct designed to mount PV modules with no more than an 18" gap <br />If No, provide details of structural attachment certified by a design professional. <br />2. For manufactured mounting systems, fill out information on the mounting system below: <br />a. Mounting Systern Manufacturer SNAPNRACK Product <br />b. Total Weight of PV Modules an{d Rails 1387 165 <br />c. Total Number of Attachment Points 4 <br />d. Weight per Attachment Point (b *346 s (if greater than 45 lbs, see WKS I ) <br />e. Maximum Spacing Between Attachment Points on a Rail 24 inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f. Total Surface Area of PV Modules (square feeQ 544'16 Jrz <br />g Distributed Weight of PV Module on Roof (b +2.5 lbs/ft2 <br />If distributed weight of the PV system is greater than 5 lbslfP, see WKSI. <br />Step 2: Electrical Review of PV System (Calculations lor Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the following must apply: <br />l. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />3 . The total inverter capacity has a continuous ac power output 13,44O Watts or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(B)). <br />5. One of the standard electricaldiagrams (E1.1, El.la, El.1b, or El.lc) can be used to accurately represent the PV <br />system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standard electrical diagram cornpletely. A guide to the electrical diagram is provided to help the applicant <br />understand each blank to fill in. If the electrical system is more complex than the standard electrical diagram can efJectively <br />communico,te, provide an alternative diagram with appropriate detail. <br />2 EXI,EDITED PERMIT PROCESS FOII. [,V SYSTEMS
The URL can be used to link to this page
Your browser does not support the video tag.