My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1601 W MacArthur Blvd - Plan
PBA
>
Building
>
ProjectDox
>
M
>
MacArthur Blvd
>
1601 W MacArthur Blvd
>
1601 W MacArthur Blvd - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 5:00:33 AM
Creation date
5/19/2026 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
101125800
101125835
101125838
101125839
101125846
101125848
101125850
101125852
101125854
101125856
101125858
Full Address
1601 W MacArthur Blvd
1601 W MacArthur Blvd Bldg# 1
1601 W MacArthur Blvd Unit# B Bldg# 5
1601 W MacArthur Blvd Unit# D Bldg# 6
1601 W MacArthur Blvd Unit# B Bldg# 10
1601 W MacArthur Blvd Bldg# 14
1601 W MacArthur Blvd Bldg# 17
1601 W MacArthur Blvd Bldg# 18
1601 W MacArthur Blvd Bldg# 22
1601 W MacArthur Blvd Bldg# 23
1601 W MacArthur Blvd Bldg# 28
Street Number
1601
Street Direction
W
Street Name
MacArthur
Street Suffix
Blvd
Building Number
28
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Structural calculations: <br />CITY OF SANTA ANA <br />Planning and Building Agency <br />may, lS. <br />Approved <br />FOR PERMIT ISSUANCE <br />The following conditions were analyzed: <br />a) Existing Balcony Joist with less than 2" decay at top. —Sister anew membe <br />allow adequate nailing of plywood decking. <br />w = 75 psf * 2' trib = 150 plf <br />a=4' <br />M_max = (w*a^2)/2 = (150*4^2)/2 = 1200 ft*# <br />V max = w*a = 150*4 = 600 # <br />>>2x10isO.K. <br />b) Existing Balcony joist with more than 2" decay —where joist is cutback to wall and a <br />headout is installed and the 3 x 10 ledger carries the weight to the adjacent cantilever joists. <br />(Factor all values by 16"/24") <br />M_max = (w*a^2)/2 <br />M max = 800 ft*# <br />V max = w*a <br />V max = 400 # <br />>> 2x8 is O.K. <br />c) 3 x 10 ledger spaning 32" where joist is cut out. <br />w = 75 psf * 2' trib = 150 plf <br />a = 2.6' <br />M_max = (w*a^2)/8 = (150*2.6^2)/8 = 126.75 ft*# <br />V max = w*a = 150*2.6 = 390 # <br />>> 2x10 is O.K. <br />d) 2 x 2's @ 5" o.c. supporting railing lateral load. <br />M max = 300/12 Win * 5.5" * 42" = 5775#*in <br />T = M_max / (spacing between T&B screws) <br />= 5775/8" = 721 # <br />>> Assuming tension engages at least (2) screws in withdrawal, consider Simpson <br />SWWS22500 or equivalent (see page 4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.