My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2041 E Wilshire Ave - Plan
PBA
>
Building
>
ProjectDox
>
W
>
Wilshire Ave
>
2041 E Wilshire Ave Unit# MTR01
>
2041 E Wilshire Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2026 5:00:28 AM
Creation date
5/29/2026 5:00:04 AM
Metadata
Fields
Template:
Plan
Permit Number
20187645
20188666
20188667
20188668
101126103
101127467
101127468
101127469
Full Address
2041 E Wilshire Ave Unit# MTR01
2041 E Wilshire Ave Unit# MTR02
2041 E Wilshire Ave Unit# MTR03
2041 E Wilshire Ave Unit# MTR04
Street Number
2041
Street Direction
E
Street Name
Wilshire
Street Suffix
Ave
Unit Number
MTR04
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
540
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXISITNG PHOTOVOLTAIC SYSTEM 190.12 KW DC <br />4 NEW CARPORT WITH PHOTOVOLTAIC SYSTEM 240.97 KW DC COMBINED SYSTEM SIZE 431.09 KW DC <br />2041 E WILSHIRE, SANTA ANA, CA 92705, USA <br />GENERAL NOTES VICINITY MAP <br />1.1.1 PROJECT NOTES: <br />1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE <br />CALIFORNIA ELECTRIC CODE (CEC) ARTICLE 690, ALL MANUFACTURER'S <br />LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS <br />SPECIFIED BY THE AUTHORITY HAVING JURISDICTION'S (AHJ) APPLICABLE <br />CODES. <br />1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED <br />AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION <br />1.1.4 GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS <br />ACCORDANCE WITH CEC 690.41(B) <br />1.1.5 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY -INTERACTIVE <br />INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND <br />LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY CEC 690.4: <br />PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 CLASS C FIRE <br />INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 COMBINER BOX(ES): UL <br />1703 OR UL 1741 ACCESSORY <br />1.1.6 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED <br />TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE <br />CALCULATED ACCORDING TO CEC 690.7. <br />1.1.7 ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, <br />AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC <br />POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION <br />PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS <br />FROM LISTING OR LABELING [CEC 110.31. <br />1.1.8 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING <br />CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL PLAQUES <br />AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE CEC AND AHJ. <br />1.2.1 SCOPE OF WORK: <br />1.2.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND <br />SPECIFICATIONS OF THE GRID -TIED PHOTOVOLTAIC SYSTEM RETROFIT. <br />PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING <br />ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE EXTERIOR <br />CARPORT -MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS DETAILED <br />IN THIS DOCUMENT <br />1.2.3 INSTALLING CONTRACTOR IS RESPONSIBLE FOR FOLLOWING <br />EQUIPMENT MANUFACTURER'S INSTALLATION AND COMMISSIONING MEANS <br />AND METHODS. <br />1.3.1 WORK INCLUDES: <br />1.3.2 PV RACKING SYSTEM INSTALLATION - CARPORT ATTACHMENT <br />1.3.3 PV MODULE AND INVERTER INSTALLATION - JA SOLAR <br />JAM72D40-595/MB (595W) MODULES / SMA SUNNY TRIPOWER CORE1 STP <br />62-US-41 (480V) INVERTERS / SMA SUNNY TRIPOWER CORE1 STP 50-US-41 <br />(480V) INVERTERS / SMA SUNNY TRIPOWER CORE1 STP 33-US-41 (480V) <br />INVERTERS <br />1.3.4 PV EQUIPMENT CARPORT MOUNT <br />1.3.5 PV SYSTEM WIRING TO A CARPORT -MOUNTED JUNCTION BOX <br />1.3.6 PV LOAD CENTERS (IF INCLUDED) <br />1.3.7 PV METERING/MONITORING (IF INCLUDED) <br />1.3.8 PV DISCONNECTS <br />1.3.9 PV GROUNDING ELECTRODE & BONDING TO (E) GEC <br />1.3.10 PV FINAL COMMISSIONING <br />1.3.11 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV <br />1.3.12 SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE <br />PROJECT INFORMATION <br />PROJECT NAME <br />NAME:FREUDENBERG NOK- CARPORTS <br />APN NUMBER: 402-111-39 <br />CONTRACTOR INFORMATION: <br />CONTRACTOR NAME: GREEN CONVERGENCE <br />SCOPE OF WORK <br />El Presidia Ap m,! <br />McFadden Ave 6' _ McFc,do r. E.. <br />0 <br />sionsO Dynamic Auto Cush- <br />Caro <br />McFADDEN PLAZA,Q <br />4 NEW SOLAR CARPORTS <br />SYSTEM SIZE: STC : 405 X 595W = 240.97 kW DC <br />PTC : 405 X 557.6W = 225.83 kW DC <br />CEC AC RATING: 220.18 kW AC <br />AC SIZE: 308.20 kW AC <br />(405) JA SOLAR JAM72D40-595/MB (595W) MODULES <br />(02) SMA SUNNY TRIPOWER CORE1 STP 62-US-41 (480V) <br />INVERTERS - <br />(01) SMA SUNNY TRIPOWER CORE1 STP 50-US-41 (480V) <br />INVERTERS <br />(04) SMA SUNNY TRIPOWER CORE1 STP 33-US-41 (480V) <br />INVERTERS <br />EXISTING <br />SYSTEM SIZE: STC : 388 X 490W = 190.12 kW DC <br />PTC : 388 X 459.1 W = 178.13 kW DC <br />CEC AC RATING: 173.68 kW AC <br />AC SIZE: 187.50 kW AC <br />(388) HANWHA Q.CELLS Q.PEAK DUO XL-G10.3/BFG <br />(490) MODULES <br />(03) SMA SUNNY TRIPOWER CORE1 STP 62-US-41 (480V) <br />INVERTERS <br />(132) APSMART RSD-D-20 RAPID SHUTDOWN DEVICES T-001 <br />ATTACHMENT TYPE: CARPORT ATTACHMENT <br />MSP UPGRADE: NO <br />AUTHORITIES HAVING JURISDICTION <br />BUILDING : CITY OF SANTA ANA <br />UTILITY : SOUTHERN CALIFORNIA EDISON (SCE) <br />DESIGN SPECIFICATION <br />FOUNDATION TYPE - POURED CONCRETE <br />ZONING - CITY OF SANTA ANA <br />GROUND SNOW LOAD - 3 PSF <br />WIND EXPOSURE - B <br />WIND SPEED - 95 MPH <br />RISK CATEGORY - II <br />APPLICABLE CODES & STANDARDS <br />BUILDING: CBC 2022, CMC 2022 <br />CPC 2022, CEBC 2022 <br />ELECTRICAL: CEC 2022 <br />FIRE: CFC 2022 <br />o <br />E Wl AW. Ave <br />1 <br />� vpiann�„ur � <br /><scFADDEN PLAZA • <br />f <br />EWilshire Ave <br />COVER,17 <br />SHEETINDEX <br />- <br />I A-101 I SITE PLAN 1 I <br />ELECTRICAL LINE DIAGRAM <br />E-603 <br />WARNING LABELS <br />E-604 <br />PLACARD <br />1.1 <br />COL MN PLAN <br />S1.2 <br />GENERAL NOTES <br />S2.1 <br />DETAILS <br />S2.2 <br />I DETAILS <br />R-001 <br />I RESOURCE DOCUMENTS <br />CITY OF SANTA ANA <br />annb and B.ui.-iAgency <br />iPO V <br />GFUTWEIRPOCTI S <br />-R E N C W A CI L C S- <br />DESIGN SEPVICES <br />GREENTECH <br />IRERNEWABLES <br />DatebNTRACTOR <br />Green convercence <br />GREEN CONVERGENCE <br />28476 WESTINGHOUSE PL. <br />VALENCIA, CA 91355, USA <br />PHONE NO: (661) 294-9999 <br />CA LICENSE: #927678 <br />(B, C-10. & C-39) <br />� `1 0 <br />w LLJ <br />- rn <br />o z <br />W <br />Q U I— = Q <br />w0-1W <br />Q <br />w U <br />z Co � <br />Z <br />w Q w Q <br />0 <br />LLI C) U H <br />o Z o <br />w N Q <br />Cl- <br />D' <br />w W <br />m <br />Lu <br />= Eo <br />�a <br />W <br />Z 00 <br />U) s� <br />W <br />F- <br />o <br />a <br />z <br />O <br />O <br />F <br />Q <br />a <br />O <br />w <br />a <br />a <br />0 <br />rn <br />a <br />U <br />> <br />a <br />> <br />j <br />> <br />K <br />LLj <br />Cy <br />o <br />a <br />Q <br />W <br />O <br />O <br />O <br />D <br />� <br />d <br />Co <br />ti <br />d <br />SHEET TITLE <br />COVER PAGE <br />DRAWN DATE 04/02/2026 <br />DRAWN BY <br />PS <br />REVIEWED BY JVK <br />SHEET NUMBER <br />T-001 <br />ANCE <br />
The URL can be used to link to this page
Your browser does not support the video tag.