Laserfiche WebLink
WH <br />FD <br />FD <br />UP UP <br />UP <br />UP <br />UP <br />(E) <br />LOBBY <br />101 <br />(E) <br />HALLWAY <br />102 <br />(E) <br />MEETING <br />ROOM <br />103 <br />(E) <br />MEETING <br />ROOM <br />104 <br />(E) <br />MEETING <br />ROOM <br />105 <br />(E) <br />MEETING <br />ROOM <br />106 <br />STORAGE <br />107 <br />(E) VOID <br />108 <br />(E) <br />OFFICE <br />109 <br />(E) I.T. <br />ROOM <br />110 <br />(E) <br />MEETING <br />ROOM <br />111 <br />(E) <br />LUNCH <br />ROOM <br />112 <br />(E) <br />MEETING <br />ROOM <br />113 <br />(E) JAN <br />114 <br />(E) RR <br />115 <br />(E) RR <br />116 <br />NURSERY <br />117 <br />NURSERY <br />118 <br />(E) <br />LOBBY <br />119 <br />(E) <br />AUDITORIUM <br />120 <br />(E) <br />STORAGE <br />121 <br />(E) <br />STORAGE <br />122 <br />YOUTH <br />124 <br />STORAGE <br />125 <br />(E) <br />YOUTH <br />126 <br />(E) F.R. <br />104A <br />(E) <br />ELECT <br />127 <br />HALLWAY <br />123 <br />C <br />C <br />C <br />C <br />C <br />B <br />B <br />B <br />D <br />123 <br />124A <br />125 <br />118 <br />117 <br />122 <br />9.029.02 <br />9.029.02 <br />9.029.02 <br />9.03 <br />NOTE -VERIFY EXISTING ADJ. FLOORING <br />INSTALL PATTERN; ALIGN WITH AND PROVIDE <br />NEW AT NEW AREA OF HALLWAY <br />9.029.02 <br />9.14 <br />9.11 <br />9.14 <br />9.11 <br />9.14 <br />9.11 <br />9.13 BEXISTING AREA TO REMAIN <br />A <br />124B <br />DOOR TYPES <br />TYPE B <br />PER DOOR SCHEDULE <br />PE <br />R <br /> <br />D <br />O <br />O <br />R <br /> <br />S <br />C <br />H <br />E <br />D <br />U <br />L <br />E <br />1. ALL NEW DOORS AND FRAMES WITH PAINTED FINISH SHALL BE <br />PAINTED TO MATCH COLOR & SHEEN OF ADJACENT WALL FINISH <br />U.N.O. ALL NEW DOORS WITH VENEER SHALL HAVE VENEER TO <br />MATCH EXISTING ADJACENT DOORS -VERIFY IN FIELD PRIOR TO <br />BID <br />2. CHANGES IN LEVEL BETWEEN 1/4 INCH HIGH MINIMUM AND 1/2 INCH <br />HIGH MAXIMUM SHALL BE BEVELED WITH A SLOPE NOT STEEPER <br />THAN 1:2 (CBC 11B-303.3) <br />3. SEE SPECIFICATIONS FOR ALL DOOR HEADINGS <br />4. ANY/ALL ACCESS CONTROLS SHALL BE COORDINATED WITH OWNER <br />PRIOR TO BID. <br />5. EXIT DOORS SHALL ONLY BE EQUIPPED WITH NO-KNOWLEDGE, <br />SINGLE-ACTION HARDWARE. LOCKS THAT REQUIRE KEYS (SUCH AS <br />DEAD BOLTS) OR ADDITIONAL ACTIONS TO OPERATE (SUCH AS <br />MANUAL BOLTS) ARE NOT PERMITTED. CBC 1010.1.9, 1010.1.9.4, <br />1010.1.9.5 <br />6. OPENING FORCE FOR INTERIOR & EXTERIOR HINGED DOORS SHALL <br />NOT EXCEED 5 LBS. (15 LBS AT ALL FIRE DOORS). <br />7. OPERABLE PARTS SHALL BE 34 INCHES MINIMUM AND 44 INCHES <br />MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. WHERE SLIDING <br />DOORS ARE IN THE FULLY OPEN POSITION, OPERATING HARDWARE <br />SHALL BE EXPOSED AND USABLE FROM BOTH SIDES. (CBC <br />1010.1.9.2 AND 11 B-404.2.7) <br />8. ALL DOORS WITH LATCH AND LOCK TO HAVE SINGLE ACTION LEVER <br />HARDWARE WHICH RETRACTS BOTH LOCK AND LATCH FROM THE <br />EXIT SIDE WITH A SINGLE OPERATION PER CBC 1008.1.9.5. <br />ALTERNATE: PROVIDE A SIGN PER CBC1008.1.9.3. <br />9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE <br />FINAL HARDWARE SPECIFICATIONS WITH ALL EXISTING <br />CONDITIONS, COMPATIBILITY, DOOR TYPES, STYLES AND FINISHES <br />PRIOR TO FABRICATION. <br />10. WHERE EXISTING PRODUCTS WILL BE REUSED, EXAMINE EXISTING <br />DOOR AND FRAME SIZES, PREPS, SWINGS, RATINGS, AND COMPARE <br />TO THE SPECIFIED HARDWARE FOR COMPATIBILITY AND <br />FUNCTIONALITY. THE HARDWARE SET SPECIFIED SHOULD ACT AS <br />GUIDE FOR DESIGN AND FUNCTION. PROVIDE FILLER PLATES AS <br />NEEDED TO FILL AND REPAIR EXISTING MATERIALS. TEST ANY <br />EXISTING TO REMAIN HARDWARE FOR FUNCTIONALITY AND <br />VISUALLY INSPECT FOR DAMAGE. NOTE ANY DEFECTIVE OR <br />DAMAGED PRODUCTS AS WELL AS NOTING ANY CODE <br />DEFICIENCIES AND SUBMIT ISSUES AND ESTIMATED COSTS FOR <br />DIRECTION OF HOW TO PROCEED WITH REPAIR OR REPLACEMENT. <br />INTERIOR <br />TYPE A <br />PE <br />R <br /> <br />D <br />O <br />O <br />R <br /> <br />S <br />C <br />H <br />E <br />D <br />U <br />L <br />E <br />PER DOOR SCHEDULE <br />7 <br />A8.1 <br />6 <br />A8.1 <br />12 <br />A8.1 <br />7 <br />A8.1 <br />6 <br />A8.1 <br />12 <br />A8.1 <br />8" X 32" TEMPERED <br />GLASS VISION LITE, <br />WHERE NOTED <br />DOOR NOTES <br />TYPE C <br />PER DOOR SCHEDULE <br />PE <br />R <br /> <br />D <br />O <br />O <br />R <br /> <br />S <br />C <br />H <br />E <br />D <br />U <br />L <br />E <br />25 <br />A8.1 <br />25 <br />A8.1 <br />24 <br />A8.1 <br />EXTERIOR <br />SIM <br />21 <br />A8.1 SIM <br />WALL TYPES <br />B <br />(1) LAYER 5/8" GYP. BD. <br />ACOUSTIC BATT INSULATION FULL- <br />DEPTH OF STUD <br />(1) LAYER 5/8" GYP. BD. <br />6" 20 GA. MTL STUDS PER <br />SCHEDULE <br />6" <br />7 <br />1 <br />/ <br />4 <br />" <br />D <br />ACOUSTIC BATT INSULATION FULL- <br />DEPTH OF STUD <br />(1) LAYER 5/8" GYP. BD. <br />6" <br />7 <br />1 <br />/ <br />4 <br />" <br />INTERIOR FULL-HEIGHT <br />INTERIOR OPENING INFILL / PARTIAL-HT <br />6" 20 GA. MTL STUDS PER <br />SCHEDULE -VERIFY SIZE IN FIELD <br />WITH SOFFIT ABOVE <br />(1) LAYER 5/8" GYP. BD. <br />3 <br />A5.1 <br />5 <br />A5.1 <br />C <br />ACOUSTIC BATT INSULATION FULL- <br />DEPTH OF STUD <br />(1) LAYER 5/8" GYP. BD. <br />3 <br />5 <br />/ <br />8 <br />" <br />4 <br />7 <br />/ <br />8 <br />" <br />3 5/8" 20 GA. MTL STUDS PER <br />SCHEDULE <br />(1) LAYER 5/8" GYP. BD. <br />4 <br />A5.1 <br />6 <br />3 <br />/ <br />8 <br />" <br />3 <br />5 <br />/ <br />8 <br />" <br />3-5/8" 20 GA. MTL. STUD PER SCHEDULE; <br />FULL-HEIGHT OF OPENING <br />5/8" EXTERIOR-RATED PLYWD <br />(1) LAYER 5/8" GYP. BD. <br />R-13 BATT INSULATION <br />TYVEK COMMERCIAL WRAP <br />MTL PNL SIDING <br />(E) CONC. WALL <br />EXTERIOR INFILL <br />A <br />2 <br />A5.1 <br />SEE FOR GYP. BD. FASTENER <br />SCHEDULE <br />SEE FOR INTERIOR <br /> PARTITION SCHEDULE <br />10 <br />A8.1 <br />9 <br />A8.1 <br />WALL NOTES <br />FINISH NOTES <br />1. ALL FINISH MATERIALS, PAINTS, ADHESIVES, SEALANTS AND CAULKS SHALL BE WITHIN VOC LIMITS AS SPECIFIED IN CGBSC TABLES 5.504.4.1 AND 5.504.4.3. SEE SHEET A0.6 FOR MORE INFORMATION. <br />2. INTERIOR FINISHES, DECORATIVE MATERIALS, AND FURNISHINGS SHALL COMPLY WITH THE CFC <br />3. THE ENTIRE BUILDING INTERIOR (WITHIN SCOPE OF WORK) IS TO BE PAINTED / RE-PAINTED, INCLUDING ALL EXISTING EXPOSED ELEMENTS SUCH AS PIPES, DUCTWORK, ETC <br />4. AT OPEN CEILINGS, ALL EXPOSED ELEMENTS SHALL BE PAINTED IN COMPLETE UNLESS NOTED OTHERWISE, INCLUDING DECKING, FRAMING, HARDWARE AND BRACKETS, SCRIM SHEETS AND LINERS, <br />AND ALL EXPOSED MECHANICAL, ELECTRICAL AND PLUMBING LINES AND COMPONENTS <br />9.12 <br />9.12 <br />9.11 <br />9.11 <br />9.11 <br />9.119.13 <br />3.01 <br />3.01 9.11 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.14 <br />9.15 <br />EXISTING CONSTRUCTION SHALL REMAIN <br />LEGEND <br />PROPOSED CONSTRUCTION; <br />INTERIOR NON-LOAD-BEARING <br />FULL-HEIGHT TO UNDERSIDE OF ROOF / FLOOR <br />PROPOSED CONSTRUCTION: <br />INTERIOR NON-LOAD-BEARING <br />OPENING INFILL; PARTIAL-HEIGHT TO UNDERSIDE OF SOFFIT/HEADER <br />#WALL TAG; REFER TO WALL SCHEDULE <br />##DOOR TAG; REFER TO DOOR SCHEDULE <br />M. STEVEN <br />CAMP <br />C-18,407 <br />JUN. 30, 2027 <br />RENEWAL DATESTATEOFCALIFORNIA <br />LICENSED A RCHITECT <br />PROJECT ARCHITECT: <br />PROJECT MANAGER: <br />DRAWN BY: <br />PROJECT NUMBER: <br />All ideas, designs and plans indicated or represented <br />by these drawings are owned by and are the property <br />of Elements Architecture, Inc. and were created and <br />developed for use in connection with the specified <br />project. None of such ideas, designs, or plans shall <br />be used for any purpose whatsoever without the <br />written permission of Elements Architecture. <br />Elements Architecture, Inc. <br />PROJECT NAME: <br />NO.DESCRIPTION DATE <br />M. Steven Camp, AIA <br />Scott Holland, AIA <br />PROJECT ADDRESS: <br />SHELLEY MACDONALD <br />EA <br />SHELLEY MACDONALD <br />STAMPED/SIGNED: 04/08/2026 <br />4/ <br />9 <br />/ <br />2 <br />0 <br />2 <br />6 <br /> <br />7 <br />: <br />5 <br />2 <br />: <br />5 <br />5 <br /> <br />A <br />M <br />21.105 <br />TENANT <br />IMPROVEMENT <br />(PHASE 3) <br />2909 DAIMLER STREET <br />SANTA ANA, CA 92705 <br />A9.1 <br />DOOR, WALL & FINISH <br />SCHEDULES <br />COMPASS BIBLE CHURCH, <br />TUSTIN SANTA ANA <br />1/8" = 1'-0"1FLOOR KEY PLAN <br />DOOR SCHEDULE <br />DOOR <br />NO.TYPE <br />SIZE DOOR FRAME HARDWARE <br />REMARKSWI <br />D <br />T <br />H <br />HE <br />I <br />G <br />H <br />T <br />TH <br />I <br />C <br />K <br />N <br />E <br />S <br />S <br />MA <br />T <br />E <br />R <br />I <br />A <br />L <br />FI <br />N <br />I <br />S <br />H <br />MA <br />T <br />E <br />R <br />I <br />A <br />L <br />FI <br />N <br />I <br />S <br />H <br />HA <br />R <br />D <br />W <br />A <br />R <br />E <br /> <br />S <br />E <br />T <br />PA <br />N <br />I <br />C <br /> <br />( <br />Y <br />/ <br />N <br />) <br />CL <br />O <br />S <br />E <br />R <br /> <br />( <br />Y <br />/ <br />N <br />) <br />117 B 3' - 0" 8' - 0" 1 3/4" S.C.W. VNR. H.M. PNT. 1 N N PROVIDE VISION LITE PER DOOR TYPE <br />118 B 3' - 0" 8' - 0" 1 3/4" S.C.W. VNR. H.M. PNT. 1 N N PROVIDE VISION LITE PER DOOR TYPE <br />122 B 3' - 0" 8' - 0" 1 3/4" S.C.W. PNT. H.M. PNT. 2 N N <br />123 C 6' - 0" 8' - 0" 1 3/4" S.C.W. PNT. H.M. PNT. 4 N N <br />124A C 6' - 0" 8' - 0" 1 3/4" S.C.W. VNR. H.M. PNT. 3 Y Y <br />124B A 6' - 0" 8' - 0" 1 3/4" H.M. PNT. H.M. PNT. 5 Y Y <br />125 C 6' - 0" 8' - 0" 1 3/4" S.C.W. PNT. H.M. PNT. 4 N N <br />WALL SCHEDULE <br />WALL TYPE DESCRIPTION REMARKS <br />A EXT. MTL PANEL SIDING O/ TYVEK COMMERCIAL WRAP O/ 5/8" EXTERIOR RATED PLYWD SHEATHING O/ 3 5/8" 20 GA. MTL STUDS PER SCHEDULE WITH <br />R-13 MIN. BATT INSULATION O/ (1) LAYER 5/8" GYP. BD. <br />EXTERIOR OPENING INFILL <br />B (1) LAYER 5/8" GYP.BD. O/ 6" 20 GA. MTL. STUDS PER SCHEDULE W/ ACOUS. INSUL. FULL DEPTH OF STUD O/ (1) LAYER 5/8" GYP.BD. FULL-HEIGHT <br />C (1) LAYER 5/8" GYP.BD. O/ 3-5/8" 20 GA. MTL. STUDS PER SCHEDULE W/ ACOUS. INSUL. FULL DEPTH OF STUD O/ (1) LAYER 5/8" GYP. BD. FULL-HEIGHT <br />D (1) LAYER 5/8" GYP.BD. O/ 6" 20 GA. MTL. STUDS PER SCHEDULE (VERIFY SIZE OF METAL STUDS IN FIELD WITH SOFFIT FRAMING ABOVE) W/ ACOUS. <br />INSUL. FULL DEPTH OF STUD O/ (1) LAYER 5/8" GYP.BD. <br />PARTIAL-HEIGHT TO B.O. SOFFIT (9'-0") <br />INTERIOR FINISH SCHEDULE <br />ROOM <br />NUMBER ROOM NAME FL <br />O <br />O <br />R <br />BA <br />S <br />E <br />WALLS CEILINGS <br />REMARKS <br />NORTH SOUTH EAST WEST <br />MA <br />T <br />E <br />R <br />I <br />A <br />L <br />FI <br />N <br />I <br />S <br />H <br />HE <br />I <br />G <br />H <br />T <br />MA <br />T <br />E <br />R <br />I <br />A <br />L <br />FI <br />N <br />I <br />S <br />H <br />MA <br />T <br />E <br />R <br />I <br />A <br />L <br />FI <br />N <br />I <br />S <br />H <br />MA <br />T <br />E <br />R <br />I <br />A <br />L <br />FI <br />N <br />I <br />S <br />H <br />MA <br />T <br />E <br />R <br />I <br />A <br />L <br />FI <br />N <br />I <br />S <br />H <br />117 NURSERY GYP.BD. GYP.BD. (E) (E) (E) (E) +9'-0" <br />118 NURSERY GYP.BD. GYP.BD. (E) (E) (E) (E) +9'-0" <br />123 HALLWAY (E) GYP.BD. GYP.BD. GYP.BD. -- -- OPEN <br />124 YOUTH (E) (E) (E) GYP.BD. -- OPEN <br />125 STORAGE (E) GYP.BD. (E) (E) -- -- OPEN <br />DOOR HARDWARE <br />SET #01 <br />4 HINGES BB1279 4 1/2 X 4 1/2 NRP US26D HA <br />1 CLASSROOM LOCK 3470 ARC SFIC US26D HA <br />1 SFIC CORE 3969 US26D HA <br />1 OVERHEAD HOLDER 7017 SRF US32D HA <br />3 DOOR SILENCERS 307D/308D (AS REQUIRED) GREY HA <br />SET #02 <br />1 CONTINUOUS HINGE 780-224HD X LAR CLR HA <br />1 CLASSROOM LOCK 3470 ARC SFIC US26D HA <br />1 SFIC CORE 3969 US26D HA <br />1 KICK PLATE 190S 10" X 2" LDW CSK US32D HA <br />SET #03 <br />2 CONTINUOUS HINGES 780-224HD X LAR CLR HA <br />2 EXIT DEVICES 4501 CVR US32D HA <br />1 EXIT DEVICE TRIM 45CE ARC US26D HA <br />1 SFIC MORTISE CYLINDER HOUSING 3902 SFIC X LAR US26D HA <br />1 SFIC CORE 3969 US26D HA <br />2 CLOSERS 5100 HDHOCS ALM HA <br />2 KICK PLATES 190S 10" X 1" LDW CSK US32D HA <br />2 DOOR SILENCERS 307D/308D (AS REQUIRED)GREY HA <br />ARCHITECTURAL KEYNOTES <br />## DESCRIPTION <br />3.01 SEALED CONCRETE <br />9.02 NOTE - AT OPPOSITE SIDE OF WALL, WITHIN ALL AREAS OF WORK, PATCH/REPAIR EXISTING FLOORING TO REMAIN, PAINT NEW WALL & PROVIDE WALL BASE TO MATCH ADJACENT WALLS <br />9.03 NOTE - PROVIDE NEW DOOR THRESHOLDS AND/OR TRANSITIONS AT ALL NEW FLOOR FINISH INSTALLATIONS, TYP. <br />9.11 RUBBER WALL BASE, MANUF: MANNINGTON BURKE, PRODUCT: 2 1/2" HIGH RUBBER MYTE TP (STRAIGHT AT CARPET, COVED AT RESILIENT/CONCRETE), COLOR: ROCKY 66O <br />9.12 TEXTILE COMPOSITE; MFR.: EF CONTRACT, STYLE NO.: SIROCCO, COLOR/PATTERN: FRESH AIR SRC44, SIZE: 12" x 48", INSTALLATION: HERRINGBONE <br />9.13 LVT; MFR.: PATCRAFT, STYLE NO.: REMOVE I417V, COLOR/PATTERN: TAUPE STONE 00770, SIZE: 12" x 24", INSTALLATION: MONOLITHIC <br />9.14 MAIN WALL PAINT PER SPECIFICATIONS; MANUF: SHERWIN WILLIAMS, COLOR: SW7044 AMAZING GRAY <br />9.15 PAINT AT EXPOSED STRUCTURE; MANUF: SHERWIN WILLIAMS, COLOR: SW7048 URBANE BRONZE <br />PROJECT <br />NORTH <br />SET #04 <br />2 CONTINUOUS HINGES 780-224HD X LAR CLR HA <br />1 STOREROOM LOCK 3480 ARC SFIC US26D HA <br />1 SFIC CORE 3969 US26D HA <br />2 KICK PLATES 190S 10" X 1" LDW CSK US32D HA <br />2 DOOR SILENCERS 307D/308D (AS REQUIRED)GREY HA <br />SET #05 <br />2 CONTINUOUS HINGES 780-224HD X LAR CLR HA <br />2 EXIT DEVICES 4501 CVR US32D HA <br />2 CLOSERS 5100 HDHOCS ALM HA <br />2 KICK PLATES 190S 10" X 1" LDW CSK US32D HA <br />1 THRESHOLD 520S S X LAR MIL HA <br />2 DOOR SWEEPS 750S S X LAR CLR HA <br />1 SET WEATHERSTRIP 881S S X LAR MIL HA <br />2 MEETING STILE ASTRAGALS 802S B X LAR MIL HA <br />1 STICK-ON ASTRAGAL SEAL 739C X LAR CLEAR HA <br />1 RAIN DRIP CAP 810S X LAR MIL HA