|
WH
<br />FD
<br />FD
<br />UP UP
<br />UP
<br />UP
<br />UP
<br />(E)
<br />LOBBY
<br />101
<br />(E)
<br />HALLWAY
<br />102
<br />(E)
<br />MEETING
<br />ROOM
<br />103
<br />(E)
<br />MEETING
<br />ROOM
<br />104
<br />(E)
<br />MEETING
<br />ROOM
<br />105
<br />(E)
<br />MEETING
<br />ROOM
<br />106
<br />STORAGE
<br />107
<br />(E) VOID
<br />108
<br />(E)
<br />OFFICE
<br />109
<br />(E) I.T.
<br />ROOM
<br />110
<br />(E)
<br />MEETING
<br />ROOM
<br />111
<br />(E)
<br />LUNCH
<br />ROOM
<br />112
<br />(E)
<br />MEETING
<br />ROOM
<br />113
<br />(E) JAN
<br />114
<br />(E) RR
<br />115
<br />(E) RR
<br />116
<br />NURSERY
<br />117
<br />NURSERY
<br />118
<br />(E)
<br />LOBBY
<br />119
<br />(E)
<br />AUDITORIUM
<br />120
<br />(E)
<br />STORAGE
<br />121
<br />(E)
<br />STORAGE
<br />122
<br />YOUTH
<br />124
<br />STORAGE
<br />125
<br />(E)
<br />YOUTH
<br />126
<br />(E) F.R.
<br />104A
<br />(E)
<br />ELECT
<br />127
<br />HALLWAY
<br />123
<br />C
<br />C
<br />C
<br />C
<br />C
<br />B
<br />B
<br />B
<br />D
<br />123
<br />124A
<br />125
<br />118
<br />117
<br />122
<br />9.029.02
<br />9.029.02
<br />9.029.02
<br />9.03
<br />NOTE -VERIFY EXISTING ADJ. FLOORING
<br />INSTALL PATTERN; ALIGN WITH AND PROVIDE
<br />NEW AT NEW AREA OF HALLWAY
<br />9.029.02
<br />9.14
<br />9.11
<br />9.14
<br />9.11
<br />9.14
<br />9.11
<br />9.13 BEXISTING AREA TO REMAIN
<br />A
<br />124B
<br />DOOR TYPES
<br />TYPE B
<br />PER DOOR SCHEDULE
<br />PE
<br />R
<br />
<br />D
<br />O
<br />O
<br />R
<br />
<br />S
<br />C
<br />H
<br />E
<br />D
<br />U
<br />L
<br />E
<br />1. ALL NEW DOORS AND FRAMES WITH PAINTED FINISH SHALL BE
<br />PAINTED TO MATCH COLOR & SHEEN OF ADJACENT WALL FINISH
<br />U.N.O. ALL NEW DOORS WITH VENEER SHALL HAVE VENEER TO
<br />MATCH EXISTING ADJACENT DOORS -VERIFY IN FIELD PRIOR TO
<br />BID
<br />2. CHANGES IN LEVEL BETWEEN 1/4 INCH HIGH MINIMUM AND 1/2 INCH
<br />HIGH MAXIMUM SHALL BE BEVELED WITH A SLOPE NOT STEEPER
<br />THAN 1:2 (CBC 11B-303.3)
<br />3. SEE SPECIFICATIONS FOR ALL DOOR HEADINGS
<br />4. ANY/ALL ACCESS CONTROLS SHALL BE COORDINATED WITH OWNER
<br />PRIOR TO BID.
<br />5. EXIT DOORS SHALL ONLY BE EQUIPPED WITH NO-KNOWLEDGE,
<br />SINGLE-ACTION HARDWARE. LOCKS THAT REQUIRE KEYS (SUCH AS
<br />DEAD BOLTS) OR ADDITIONAL ACTIONS TO OPERATE (SUCH AS
<br />MANUAL BOLTS) ARE NOT PERMITTED. CBC 1010.1.9, 1010.1.9.4,
<br />1010.1.9.5
<br />6. OPENING FORCE FOR INTERIOR & EXTERIOR HINGED DOORS SHALL
<br />NOT EXCEED 5 LBS. (15 LBS AT ALL FIRE DOORS).
<br />7. OPERABLE PARTS SHALL BE 34 INCHES MINIMUM AND 44 INCHES
<br />MAXIMUM ABOVE THE FINISH FLOOR OR GROUND. WHERE SLIDING
<br />DOORS ARE IN THE FULLY OPEN POSITION, OPERATING HARDWARE
<br />SHALL BE EXPOSED AND USABLE FROM BOTH SIDES. (CBC
<br />1010.1.9.2 AND 11 B-404.2.7)
<br />8. ALL DOORS WITH LATCH AND LOCK TO HAVE SINGLE ACTION LEVER
<br />HARDWARE WHICH RETRACTS BOTH LOCK AND LATCH FROM THE
<br />EXIT SIDE WITH A SINGLE OPERATION PER CBC 1008.1.9.5.
<br />ALTERNATE: PROVIDE A SIGN PER CBC1008.1.9.3.
<br />9. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE THE
<br />FINAL HARDWARE SPECIFICATIONS WITH ALL EXISTING
<br />CONDITIONS, COMPATIBILITY, DOOR TYPES, STYLES AND FINISHES
<br />PRIOR TO FABRICATION.
<br />10. WHERE EXISTING PRODUCTS WILL BE REUSED, EXAMINE EXISTING
<br />DOOR AND FRAME SIZES, PREPS, SWINGS, RATINGS, AND COMPARE
<br />TO THE SPECIFIED HARDWARE FOR COMPATIBILITY AND
<br />FUNCTIONALITY. THE HARDWARE SET SPECIFIED SHOULD ACT AS
<br />GUIDE FOR DESIGN AND FUNCTION. PROVIDE FILLER PLATES AS
<br />NEEDED TO FILL AND REPAIR EXISTING MATERIALS. TEST ANY
<br />EXISTING TO REMAIN HARDWARE FOR FUNCTIONALITY AND
<br />VISUALLY INSPECT FOR DAMAGE. NOTE ANY DEFECTIVE OR
<br />DAMAGED PRODUCTS AS WELL AS NOTING ANY CODE
<br />DEFICIENCIES AND SUBMIT ISSUES AND ESTIMATED COSTS FOR
<br />DIRECTION OF HOW TO PROCEED WITH REPAIR OR REPLACEMENT.
<br />INTERIOR
<br />TYPE A
<br />PE
<br />R
<br />
<br />D
<br />O
<br />O
<br />R
<br />
<br />S
<br />C
<br />H
<br />E
<br />D
<br />U
<br />L
<br />E
<br />PER DOOR SCHEDULE
<br />7
<br />A8.1
<br />6
<br />A8.1
<br />12
<br />A8.1
<br />7
<br />A8.1
<br />6
<br />A8.1
<br />12
<br />A8.1
<br />8" X 32" TEMPERED
<br />GLASS VISION LITE,
<br />WHERE NOTED
<br />DOOR NOTES
<br />TYPE C
<br />PER DOOR SCHEDULE
<br />PE
<br />R
<br />
<br />D
<br />O
<br />O
<br />R
<br />
<br />S
<br />C
<br />H
<br />E
<br />D
<br />U
<br />L
<br />E
<br />25
<br />A8.1
<br />25
<br />A8.1
<br />24
<br />A8.1
<br />EXTERIOR
<br />SIM
<br />21
<br />A8.1 SIM
<br />WALL TYPES
<br />B
<br />(1) LAYER 5/8" GYP. BD.
<br />ACOUSTIC BATT INSULATION FULL-
<br />DEPTH OF STUD
<br />(1) LAYER 5/8" GYP. BD.
<br />6" 20 GA. MTL STUDS PER
<br />SCHEDULE
<br />6"
<br />7
<br />1
<br />/
<br />4
<br />"
<br />D
<br />ACOUSTIC BATT INSULATION FULL-
<br />DEPTH OF STUD
<br />(1) LAYER 5/8" GYP. BD.
<br />6"
<br />7
<br />1
<br />/
<br />4
<br />"
<br />INTERIOR FULL-HEIGHT
<br />INTERIOR OPENING INFILL / PARTIAL-HT
<br />6" 20 GA. MTL STUDS PER
<br />SCHEDULE -VERIFY SIZE IN FIELD
<br />WITH SOFFIT ABOVE
<br />(1) LAYER 5/8" GYP. BD.
<br />3
<br />A5.1
<br />5
<br />A5.1
<br />C
<br />ACOUSTIC BATT INSULATION FULL-
<br />DEPTH OF STUD
<br />(1) LAYER 5/8" GYP. BD.
<br />3
<br />5
<br />/
<br />8
<br />"
<br />4
<br />7
<br />/
<br />8
<br />"
<br />3 5/8" 20 GA. MTL STUDS PER
<br />SCHEDULE
<br />(1) LAYER 5/8" GYP. BD.
<br />4
<br />A5.1
<br />6
<br />3
<br />/
<br />8
<br />"
<br />3
<br />5
<br />/
<br />8
<br />"
<br />3-5/8" 20 GA. MTL. STUD PER SCHEDULE;
<br />FULL-HEIGHT OF OPENING
<br />5/8" EXTERIOR-RATED PLYWD
<br />(1) LAYER 5/8" GYP. BD.
<br />R-13 BATT INSULATION
<br />TYVEK COMMERCIAL WRAP
<br />MTL PNL SIDING
<br />(E) CONC. WALL
<br />EXTERIOR INFILL
<br />A
<br />2
<br />A5.1
<br />SEE FOR GYP. BD. FASTENER
<br />SCHEDULE
<br />SEE FOR INTERIOR
<br /> PARTITION SCHEDULE
<br />10
<br />A8.1
<br />9
<br />A8.1
<br />WALL NOTES
<br />FINISH NOTES
<br />1. ALL FINISH MATERIALS, PAINTS, ADHESIVES, SEALANTS AND CAULKS SHALL BE WITHIN VOC LIMITS AS SPECIFIED IN CGBSC TABLES 5.504.4.1 AND 5.504.4.3. SEE SHEET A0.6 FOR MORE INFORMATION.
<br />2. INTERIOR FINISHES, DECORATIVE MATERIALS, AND FURNISHINGS SHALL COMPLY WITH THE CFC
<br />3. THE ENTIRE BUILDING INTERIOR (WITHIN SCOPE OF WORK) IS TO BE PAINTED / RE-PAINTED, INCLUDING ALL EXISTING EXPOSED ELEMENTS SUCH AS PIPES, DUCTWORK, ETC
<br />4. AT OPEN CEILINGS, ALL EXPOSED ELEMENTS SHALL BE PAINTED IN COMPLETE UNLESS NOTED OTHERWISE, INCLUDING DECKING, FRAMING, HARDWARE AND BRACKETS, SCRIM SHEETS AND LINERS,
<br />AND ALL EXPOSED MECHANICAL, ELECTRICAL AND PLUMBING LINES AND COMPONENTS
<br />9.12
<br />9.12
<br />9.11
<br />9.11
<br />9.11
<br />9.119.13
<br />3.01
<br />3.01 9.11
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.14
<br />9.15
<br />EXISTING CONSTRUCTION SHALL REMAIN
<br />LEGEND
<br />PROPOSED CONSTRUCTION;
<br />INTERIOR NON-LOAD-BEARING
<br />FULL-HEIGHT TO UNDERSIDE OF ROOF / FLOOR
<br />PROPOSED CONSTRUCTION:
<br />INTERIOR NON-LOAD-BEARING
<br />OPENING INFILL; PARTIAL-HEIGHT TO UNDERSIDE OF SOFFIT/HEADER
<br />#WALL TAG; REFER TO WALL SCHEDULE
<br />##DOOR TAG; REFER TO DOOR SCHEDULE
<br />M. STEVEN
<br />CAMP
<br />C-18,407
<br />JUN. 30, 2027
<br />RENEWAL DATESTATEOFCALIFORNIA
<br />LICENSED A RCHITECT
<br />PROJECT ARCHITECT:
<br />PROJECT MANAGER:
<br />DRAWN BY:
<br />PROJECT NUMBER:
<br />All ideas, designs and plans indicated or represented
<br />by these drawings are owned by and are the property
<br />of Elements Architecture, Inc. and were created and
<br />developed for use in connection with the specified
<br />project. None of such ideas, designs, or plans shall
<br />be used for any purpose whatsoever without the
<br />written permission of Elements Architecture.
<br />Elements Architecture, Inc.
<br />PROJECT NAME:
<br />NO.DESCRIPTION DATE
<br />M. Steven Camp, AIA
<br />Scott Holland, AIA
<br />PROJECT ADDRESS:
<br />SHELLEY MACDONALD
<br />EA
<br />SHELLEY MACDONALD
<br />STAMPED/SIGNED: 04/08/2026
<br />4/
<br />9
<br />/
<br />2
<br />0
<br />2
<br />6
<br />
<br />7
<br />:
<br />5
<br />2
<br />:
<br />5
<br />5
<br />
<br />A
<br />M
<br />21.105
<br />TENANT
<br />IMPROVEMENT
<br />(PHASE 3)
<br />2909 DAIMLER STREET
<br />SANTA ANA, CA 92705
<br />A9.1
<br />DOOR, WALL & FINISH
<br />SCHEDULES
<br />COMPASS BIBLE CHURCH,
<br />TUSTIN SANTA ANA
<br />1/8" = 1'-0"1FLOOR KEY PLAN
<br />DOOR SCHEDULE
<br />DOOR
<br />NO.TYPE
<br />SIZE DOOR FRAME HARDWARE
<br />REMARKSWI
<br />D
<br />T
<br />H
<br />HE
<br />I
<br />G
<br />H
<br />T
<br />TH
<br />I
<br />C
<br />K
<br />N
<br />E
<br />S
<br />S
<br />MA
<br />T
<br />E
<br />R
<br />I
<br />A
<br />L
<br />FI
<br />N
<br />I
<br />S
<br />H
<br />MA
<br />T
<br />E
<br />R
<br />I
<br />A
<br />L
<br />FI
<br />N
<br />I
<br />S
<br />H
<br />HA
<br />R
<br />D
<br />W
<br />A
<br />R
<br />E
<br />
<br />S
<br />E
<br />T
<br />PA
<br />N
<br />I
<br />C
<br />
<br />(
<br />Y
<br />/
<br />N
<br />)
<br />CL
<br />O
<br />S
<br />E
<br />R
<br />
<br />(
<br />Y
<br />/
<br />N
<br />)
<br />117 B 3' - 0" 8' - 0" 1 3/4" S.C.W. VNR. H.M. PNT. 1 N N PROVIDE VISION LITE PER DOOR TYPE
<br />118 B 3' - 0" 8' - 0" 1 3/4" S.C.W. VNR. H.M. PNT. 1 N N PROVIDE VISION LITE PER DOOR TYPE
<br />122 B 3' - 0" 8' - 0" 1 3/4" S.C.W. PNT. H.M. PNT. 2 N N
<br />123 C 6' - 0" 8' - 0" 1 3/4" S.C.W. PNT. H.M. PNT. 4 N N
<br />124A C 6' - 0" 8' - 0" 1 3/4" S.C.W. VNR. H.M. PNT. 3 Y Y
<br />124B A 6' - 0" 8' - 0" 1 3/4" H.M. PNT. H.M. PNT. 5 Y Y
<br />125 C 6' - 0" 8' - 0" 1 3/4" S.C.W. PNT. H.M. PNT. 4 N N
<br />WALL SCHEDULE
<br />WALL TYPE DESCRIPTION REMARKS
<br />A EXT. MTL PANEL SIDING O/ TYVEK COMMERCIAL WRAP O/ 5/8" EXTERIOR RATED PLYWD SHEATHING O/ 3 5/8" 20 GA. MTL STUDS PER SCHEDULE WITH
<br />R-13 MIN. BATT INSULATION O/ (1) LAYER 5/8" GYP. BD.
<br />EXTERIOR OPENING INFILL
<br />B (1) LAYER 5/8" GYP.BD. O/ 6" 20 GA. MTL. STUDS PER SCHEDULE W/ ACOUS. INSUL. FULL DEPTH OF STUD O/ (1) LAYER 5/8" GYP.BD. FULL-HEIGHT
<br />C (1) LAYER 5/8" GYP.BD. O/ 3-5/8" 20 GA. MTL. STUDS PER SCHEDULE W/ ACOUS. INSUL. FULL DEPTH OF STUD O/ (1) LAYER 5/8" GYP. BD. FULL-HEIGHT
<br />D (1) LAYER 5/8" GYP.BD. O/ 6" 20 GA. MTL. STUDS PER SCHEDULE (VERIFY SIZE OF METAL STUDS IN FIELD WITH SOFFIT FRAMING ABOVE) W/ ACOUS.
<br />INSUL. FULL DEPTH OF STUD O/ (1) LAYER 5/8" GYP.BD.
<br />PARTIAL-HEIGHT TO B.O. SOFFIT (9'-0")
<br />INTERIOR FINISH SCHEDULE
<br />ROOM
<br />NUMBER ROOM NAME FL
<br />O
<br />O
<br />R
<br />BA
<br />S
<br />E
<br />WALLS CEILINGS
<br />REMARKS
<br />NORTH SOUTH EAST WEST
<br />MA
<br />T
<br />E
<br />R
<br />I
<br />A
<br />L
<br />FI
<br />N
<br />I
<br />S
<br />H
<br />HE
<br />I
<br />G
<br />H
<br />T
<br />MA
<br />T
<br />E
<br />R
<br />I
<br />A
<br />L
<br />FI
<br />N
<br />I
<br />S
<br />H
<br />MA
<br />T
<br />E
<br />R
<br />I
<br />A
<br />L
<br />FI
<br />N
<br />I
<br />S
<br />H
<br />MA
<br />T
<br />E
<br />R
<br />I
<br />A
<br />L
<br />FI
<br />N
<br />I
<br />S
<br />H
<br />MA
<br />T
<br />E
<br />R
<br />I
<br />A
<br />L
<br />FI
<br />N
<br />I
<br />S
<br />H
<br />117 NURSERY GYP.BD. GYP.BD. (E) (E) (E) (E) +9'-0"
<br />118 NURSERY GYP.BD. GYP.BD. (E) (E) (E) (E) +9'-0"
<br />123 HALLWAY (E) GYP.BD. GYP.BD. GYP.BD. -- -- OPEN
<br />124 YOUTH (E) (E) (E) GYP.BD. -- OPEN
<br />125 STORAGE (E) GYP.BD. (E) (E) -- -- OPEN
<br />DOOR HARDWARE
<br />SET #01
<br />4 HINGES BB1279 4 1/2 X 4 1/2 NRP US26D HA
<br />1 CLASSROOM LOCK 3470 ARC SFIC US26D HA
<br />1 SFIC CORE 3969 US26D HA
<br />1 OVERHEAD HOLDER 7017 SRF US32D HA
<br />3 DOOR SILENCERS 307D/308D (AS REQUIRED) GREY HA
<br />SET #02
<br />1 CONTINUOUS HINGE 780-224HD X LAR CLR HA
<br />1 CLASSROOM LOCK 3470 ARC SFIC US26D HA
<br />1 SFIC CORE 3969 US26D HA
<br />1 KICK PLATE 190S 10" X 2" LDW CSK US32D HA
<br />SET #03
<br />2 CONTINUOUS HINGES 780-224HD X LAR CLR HA
<br />2 EXIT DEVICES 4501 CVR US32D HA
<br />1 EXIT DEVICE TRIM 45CE ARC US26D HA
<br />1 SFIC MORTISE CYLINDER HOUSING 3902 SFIC X LAR US26D HA
<br />1 SFIC CORE 3969 US26D HA
<br />2 CLOSERS 5100 HDHOCS ALM HA
<br />2 KICK PLATES 190S 10" X 1" LDW CSK US32D HA
<br />2 DOOR SILENCERS 307D/308D (AS REQUIRED)GREY HA
<br />ARCHITECTURAL KEYNOTES
<br />## DESCRIPTION
<br />3.01 SEALED CONCRETE
<br />9.02 NOTE - AT OPPOSITE SIDE OF WALL, WITHIN ALL AREAS OF WORK, PATCH/REPAIR EXISTING FLOORING TO REMAIN, PAINT NEW WALL & PROVIDE WALL BASE TO MATCH ADJACENT WALLS
<br />9.03 NOTE - PROVIDE NEW DOOR THRESHOLDS AND/OR TRANSITIONS AT ALL NEW FLOOR FINISH INSTALLATIONS, TYP.
<br />9.11 RUBBER WALL BASE, MANUF: MANNINGTON BURKE, PRODUCT: 2 1/2" HIGH RUBBER MYTE TP (STRAIGHT AT CARPET, COVED AT RESILIENT/CONCRETE), COLOR: ROCKY 66O
<br />9.12 TEXTILE COMPOSITE; MFR.: EF CONTRACT, STYLE NO.: SIROCCO, COLOR/PATTERN: FRESH AIR SRC44, SIZE: 12" x 48", INSTALLATION: HERRINGBONE
<br />9.13 LVT; MFR.: PATCRAFT, STYLE NO.: REMOVE I417V, COLOR/PATTERN: TAUPE STONE 00770, SIZE: 12" x 24", INSTALLATION: MONOLITHIC
<br />9.14 MAIN WALL PAINT PER SPECIFICATIONS; MANUF: SHERWIN WILLIAMS, COLOR: SW7044 AMAZING GRAY
<br />9.15 PAINT AT EXPOSED STRUCTURE; MANUF: SHERWIN WILLIAMS, COLOR: SW7048 URBANE BRONZE
<br />PROJECT
<br />NORTH
<br />SET #04
<br />2 CONTINUOUS HINGES 780-224HD X LAR CLR HA
<br />1 STOREROOM LOCK 3480 ARC SFIC US26D HA
<br />1 SFIC CORE 3969 US26D HA
<br />2 KICK PLATES 190S 10" X 1" LDW CSK US32D HA
<br />2 DOOR SILENCERS 307D/308D (AS REQUIRED)GREY HA
<br />SET #05
<br />2 CONTINUOUS HINGES 780-224HD X LAR CLR HA
<br />2 EXIT DEVICES 4501 CVR US32D HA
<br />2 CLOSERS 5100 HDHOCS ALM HA
<br />2 KICK PLATES 190S 10" X 1" LDW CSK US32D HA
<br />1 THRESHOLD 520S S X LAR MIL HA
<br />2 DOOR SWEEPS 750S S X LAR CLR HA
<br />1 SET WEATHERSTRIP 881S S X LAR MIL HA
<br />2 MEETING STILE ASTRAGALS 802S B X LAR MIL HA
<br />1 STICK-ON ASTRAGAL SEAL 739C X LAR CLEAR HA
<br />1 RAIN DRIP CAP 810S X LAR MIL HA
|