10. AUXILIARY MATERIALS:
<br />a. CORNERBEAD, EDGE TRIM AND CONTROL JOINTS.
<br />b. EXTRUDED ALUMINUM REVEALS AND CHANNELS.
<br />c. GYPSUM BOARD SCREWS, ASTM C 1002.
<br />d. GYPSUM BOARD NAILS, ASTM C 514.
<br />e. FASTENING ADHESIVE.
<br />f. CONCEALED ACOUSTICAL SEALANT.
<br />g. MINERAL FIBER SOUND ATTENUATION BLANKETS.
<br />h. MINERAL FIBER THERMAL INSULATION.
<br />i. POLYETHYLENE VAPOR RETARDER, 6 MILS.
<br />j. POLYSTYRENE AGGREGATED FINISH FOR CEILINGS.
<br />k. ACOUSTICAL FINISH.
<br />H. INSTALL GYPSUM BOARD FOR TAPE AND 3-COAT JOINT COMPOUND FINISH IN COMPLIANCE
<br />WITH ASTM C 840 AND GA 216, LEVEL 4 FINISH. INSTALL GYPSUM BOARD ASSEMBLIES TRUE,
<br />PLUMB, LEVEL AND IN PROPER RELATION TO ADJACENT SURFACES.
<br />I. PROVIDE FIRE-RATED SYSTEMS WHERE INDICATED AND WHERE REQUIRED BY AUTHORITIES
<br />HAVING JURISDICTION.
<br />J. INSTALL BOARDS VERTICALLY. DO NOT ALLOW BUTT-TO-BUTT JOINTS AND JOINTS THAT DO
<br />NOT FALL OVER FRAMING MEMBERS.
<br />K. WHERE NEW PARTITIONS MEET EXISTING CONSTRUCTION, REMOVE EXISTING CORNERBEADS
<br />TO PROVIDE A SMOOTH TRANSITION.
<br />L. PROVIDE INSULATION FULL HEIGHT AND THICKNESS IN PARTITIONS AT CONFERENCE ROOMS,
<br />TOILET ROOMS, BETWEEN DIFFERENT OCCUPANCIES, AND WHERE REQUIRED.
<br />A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
<br />INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
<br />B. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
<br />MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
<br />YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN
<br />ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />C. TOLERANCES: NOT MORE THAN 1/16-INCH DIFFERENCE IN TRUE PLANE AT JOINTS BETWEEN
<br />ADJACENT BOARDS BEFORE FINISHING. AFTER FINISHING, JOINTS SHALL BE NOT BE VISIBLE.
<br />NOT MORE THAN 1/8 INCH IN 10 FEET DEVIATION FROM TRUE PLANE, PLUMB, LEVEL AND
<br />PROPER RELATION TO ADJACENT SURFACES IN FINISHED WORK.
<br />D. FIRE RESISTANCE FOR FIRE-RATED ASSEMBLIES: ASTM E 119.
<br />E. MOCK-UPS: PROVIDE MOCK-UP AS REQUIRED TO DEMONSTRATE QUALITY OF WORKMANSHIP
<br />AND LEVEL OF FINISH.
<br />F. PERFORMANCE: FIRE, STRUCTURAL, AND SEISMIC PERFORMANCE MEETING REQUIREMENTS OF
<br />BUILDING CODE AND LOCAL AUTHORITIES.
<br />G. GYPSUM BOARD:
<br />1. MANUFACTURERS: AS SELECTED BY CONTRACTOR
<br />2. APPLICATION: INTERIOR WALLS, PARTITIONS, AND CEILINGS WITH TAPE AND JOINT
<br />COMPOUND FINISH.
<br />3. MATERIAL STANDARD: ASTM C1396.
<br />9.1 GYPSUM BOARD ASSEMBLIES
<br />M. PROVIDE ACOUSTICAL SEALANT AT BOTH FACES AT TOP AND BOTTOM RUNNER TRACKS, WALL
<br />PERIMETERS, OPENINGS, EXPANSION AND CONTROL JOINTS.
<br />N. INSTALL TRIM IN STRICT COMPLIANCE WITH MANUFACTURER'S INSTRUCTIONS AND
<br />RECOMMENDATIONS.
<br />O. REPAIR SURFACE DEFECTS. LEAVE READY FOR FINISH PAINTING OR WALL TREATMENT.
<br />4. TYPE: BOARD FOR TAPE AND JOINT COMPOUND FINISH.
<br />a. TYPE: REGULAR
<br />c. TYPICAL THICKNESS: 5/8 INCH.
<br />5. JOINT TREATMENT: ASTM C474 AND ASTM C840, 3-COAT SYSTEM, PAPER OR
<br />FIBERGLASS TAPE.
<br />9.2 ACOUSTICAL CEILINGS
<br />A. SECTION INCLUDES
<br />a. ACOUSTICAL CEILING PANELS
<br />b. GRID SUSPENSION SYSTEM
<br />c. WIRE HANGERS, FASTENERS, MAIN RUNNERS, CROSS TEES, AND WALL ANGLE
<br />MOLDINGS
<br />d. PERIMETER TRIM
<br />B. ALTERNATES
<br />a. PRIOR APPROVAL: UNLESS OTHERWISE PROVIDED FOR IN THE CONTRACT
<br />DOCUMENTS, PROPOSED PRODUCT SUBSTITUTIONS MAY BE SUBMITTED NO
<br />LATER THAN TEN (10) WORKING DAYS PRIOR TO THE DATE ESTABLISHED FOR
<br />RECEIPT OF BIDS. ACCEPTABILITY OF A PROPOSED SUBSTITUTION IS
<br />CONTINGENT UPON THE ARCHITECT'S REVIEW OF THE PROPOSAL FOR
<br />ACCEPTABILITY AND APPROVED PRODUCTS WILL BE SET FORTH BY THE ADDENDA.
<br />IF INCLUDED IN A BID ARE SUBSTITUTE PRODUCTS THAT HAVE NOT BEEN
<br />APPROVED BY ADDENDA, THE SPECIFIED PRODUCTS SHALL BE PROVIDED
<br />WITHOUT ADDITIONAL COMPENSATION.
<br />b. SUBMITTALS THAT DO NOT PROVIDE ADEQUATE DATA FOR THE PRODUCT
<br />EVALUATION WILL NOT BE CONSIDERED. THE PROPOSED SUBSTITUTION MUST
<br />MEET ALL REQUIREMENTS OF THIS SECTION, INCLUDING BUT NOT NECESSARILY
<br />LIMITED TO, THE FOLLOWING: SINGLE SOURCE MATERIALS SUPPLIERS (IF
<br />SPECIFIED IN SECTION 1.5); UNDERWRITERS' LABORATORIES CLASSIFIED
<br />ACOUSTICAL PERFORMANCE; PANEL DESIGN, SIZE, COMPOSITION, COLOR, AND
<br />FINISH; SUSPENSION SYSTEM COMPONENT PROFILES AND SIZES; COMPLIANCE
<br />WITH THE REFERENCED STANDARDS.
<br />• IF THE MATERIAL SUPPLIED BY THE ACOUSTICAL SUBCONTRACTOR DOES
<br />NOT HAVE AN UNDERWRITER'S LABORATORY CLASSIFICATION OF
<br />ACOUSTICAL PERFORMANCE ON EVERY CARTON, SUBCONTRACTOR
<br />SHALL BE REQUIRED TO SEND MATERIAL FROM EVERY PRODUCTION RUN
<br />APPEARING ON THE JOB TO AN INDEPENDENT OR NVLAP APPROVED
<br />LABORATORY FOR TESTING, AT THE ARCHITECT'S OR OWNER'S
<br />DISCRETION. ALL PRODUCTS NOT CONFORMING TO MANUFACTURER'S
<br />CURRENT PUBLISHED VALUES MUST BE REMOVED, DISPOSED OF AND
<br />REPLACED WITH COMPLYING PRODUCT AT THE EXPENSE OF THE
<br />CONTRACTOR PERFORMING THE WORK.
<br />D. QUALITY ASSURANCE
<br />a. SINGLE-SOURCE RESPONSIBILITY: PROVIDE ACOUSTICAL PANEL UNITS AND GRID
<br />COMPONENTS BY A SINGLE MANUFACTURER.
<br />b. FIRE PERFORMANCE CHARACTERISTICS: IDENTIFY ACOUSTICAL CEILING
<br />COMPONENTS WITH APPROPRIATE MARKINGS OF APPLICABLE TESTING AND
<br />INSPECTING ORGANIZATION.
<br />c. SURFACE BURNING CHARACTERISTICS: AS FOLLOWS, TESTED PER ASTM E 84 AND
<br />COMPLYING WITH ASTM E 1264 CLASSIFICATION.
<br />d. FIRE RESISTANCE: AS FOLLOWS TESTED PER ASTM E119 AND LISTED IN THE
<br />APPROPRIATE FLOOR OR ROOF DESIGN IN THE UNDERWRITERS LABORATORIES
<br />FIRE RESISTANCE DIRECTORY
<br />e. ACOUSTICAL PANELS: AS WITH OTHER ARCHITECTURAL FEATURES LOCATED AT
<br />THE CEILING, MAY OBSTRUCT OR SKEW THE PLANNED FIRE SPRINKLER WATER
<br />DISTRIBUTION PATTERN THROUGH POSSIBLY DELAY OR ACCELERATE THE
<br />ACTIVATION OF THE SPRINKLER OR FIRE DETECTION SYSTEMS BY CHANNELING
<br />HEAT FROM A FIRE EITHER TOWARD OR AWAY FROM THE DEVICE. DESIGNERS
<br />AND INSTALLERS ARE ADVISED TO CONSULT A FIRE PROTECTION ENGINEER,
<br />NFPA 13, OR THEIR LOCAL CODES FOR GUIDANCE WHERE AUTOMATIC FIRE
<br />DETECTION AND SUPPRESSION SYSTEMS ARE PRESENT.
<br />f. COORDINATION OF WORK: COORDINATE ACOUSTICAL CEILING WORK WITH
<br />INSTALLERS OF RELATED WORK INCLUDING, BUT NOT LIMITED TO BUILDING
<br />INSULATION, GYPSUM BOARD, LIGHT FIXTURES, MECHANICAL SYSTEMS,
<br />ELECTRICAL SYSTEMS, AND SPRINKLERS.
<br />E. DELIVERY, STORAGE AND HANDLING
<br />a. DELIVER ACOUSTICAL CEILING UNITS TO PROJECT SITE IN ORIGINAL, UNOPENED
<br />PACKAGES AND STORE THEM IN A FULLY ENCLOSED SPACE WHERE THEY WILL BE
<br />PROTECTED AGAINST DAMAGE FROM MOISTURE, DIRECT SUNLIGHT, SURFACE
<br />CONTAMINATION, AND OTHER CAUSES.
<br />b. BEFORE INSTALLING ACOUSTICAL CEILING UNITS, PERMIT THEM TO REACH
<br />ROOM TEMPERATURE AND A STABILIZED MOISTURE CONTENT.
<br />c. HANDLE ACOUSTICAL CEILING UNITS CAREFULLY TO AVOID CHIPPING EDGES OR
<br />DAMAGED UNITS IN ANY WAY.
<br />F. PROJECT CONDITIONS
<br />a. SPACE ENCLOSURE: STANDARD CEILINGS: DO NOT INSTALL INTERIOR CEILINGS
<br />UNTIL SPACE IS ENCLOSED AND WEATHERPROOF; WET WORK IN PLACE IS
<br />COMPLETED AND NOMINALLY DRY; WORK ABOVE CEILINGS IS COMPLETE; AND
<br />AMBIENT CONDITIONS OF TEMPERATURE AND HUMIDITY ARE CONTINUOUSLY
<br />MAINTAINED AT VALUES NEAR THOSE INTENDED FOR FINAL OCCUPANCY.
<br />BUILDING AREAS TO RECEIVE CEILINGS SHALL BE FREE OF CONSTRUCTION DUST
<br />AND DEBRIS.
<br />H. MAINTENANCE
<br />a. EXTRA MATERIALS: DELIVER EXTRA MATERIALS TO OWNER. FURNISH EXTRA
<br />MATERIALS DESCRIBED BELOW THAT MATCH PRODUCTS INSTALLED. PACKAGED
<br />WITH PROTECTIVE COVERING FOR STORAGE AND IDENTIFIED WITH APPROPRIATE
<br />LABELS.
<br />b. ACOUSTICAL CEILING UNITS: FURNISH QUALITY OF FULL-SIZE UNITS EQUAL TO
<br />5.0 PERCENT OF AMOUNT INSTALLED.
<br />c. EXPOSED SUSPENSION SYSTEM COMPONENTS: FURNISH QUANTITY OF EACH
<br />EXPOSED SUSPENSION COMPONENT EQUAL TO 2.0 PERCENT OF AMOUNT
<br />INSTALLED.
<br />I. PRODUCTS
<br />a. MANUFACTURERS
<br />• CEILING PANELS, SUSPENSION SYSTEMS, PERIMETER SYSTEMS:
<br />1. ARMSTRONG WORLD INDUSTRIES, INC. -VERIFY IN FIELD
<br />PRIOR TO BID
<br />K. ACOUSTICAL CEILING UNITS
<br />a. ACOUSTICAL PANELS -VERIFY IN FIELD PRIOR TO BID
<br />b. METAL SUSPENSION SYSTEMS -VERIFY IN FIELD PRIOR TO BID
<br />c. COMPONENTS: MAIN BEAMS AND CROSS TEES, BASE METAL AND END DETAIL,
<br />FABRICATED FROM COMMERCIAL QUALITY HOT DIPPED GALVANIZED STEEL COMPLYING
<br />WITH ASTM A 653. MAIN BEAMS AND CROSS TEES ARE DOUBLE-WEB STEEL
<br />CONSTRUCTION WITH TYPE EXPOSED FLANGE DESIGN. EXPOSED SURFACES
<br />CHEMICALLY CLEANSED, CAPPING PREFINISHED GALVANIZED STEEL IN BAKED POLYESTER
<br />PAINT. MAIN BEAMS AND CROSS TEES SHALL HAVE ROTARY STITCHING.
<br />d. STRUCTURAL CLASSIFICATION: ASTM C 635 HEAVY DUTY DUTY
<br />e. COLOR: WHITE AND MATCH THE ACTUAL COLOR OF THE SELECTED CEILING TILE,
<br />UNLESS NOTED OTHERWISE.
<br />f. SUSTAINABILITY: ENVIRONMETAL PRODUCT DECLARATION (EPD), HEALTH PRODUCT
<br />DECLARATION (HPD)
<br />g. ACCEPTABLE PRODUCT: PRELUDE XL 15/16" EXPOSED TEE AS MANUFACTURED BY
<br />ARMSTRONG WORLD INDUSTRIES
<br />h. ATTACHMENT DEVICES: SIZE FOR FIVE TIMES DESIGN LOAD INDICATED IN ASTM C 635,
<br />TABLE 1, DIRECT HUNG UNLESS OTHERWISE INDICATED.
<br />i. WIRE FOR HANGERS AND TIES: ASTM A 641, CLASS 1 ZINC COATING, SOFT ANNEALED,
<br />WITH A YIELD STRESS LOAD OF AT LEAST TIME THREE DESIGN LOAD, BUT NOT LESS THAN
<br />12 GAUGE.
<br />• EDGE MOLDINGS AND TRIM:
<br />1. 7800 -12' WALL MOLDING (NEW)
<br />L. EXAMINATION: DO NOT PROCEED WITH INSTALLATION UNTIL ALL WET WORK SUCH AS
<br />CONCRETE, TERRAZZO, PLASTERING AND PAINTING HAS BEEN COMPLETED AND THOROUGHLY
<br />DRIED OUT, UNLESS EXPRESSLY PERMITTED BY MANUFACTURER'S PRINTED RECOMMENDATIONS.
<br />(EXCEPTION: HUMIGUARD MAX CEILINGS)
<br />M. PREPARATION
<br />a. MEASURE EACH CEILING AREA AND ESTABLISH LAYOUT OF ACOUSTICAL UNITS TO
<br />BALANCE BORDER WIDTHS AT OPPOSITE EDGES OF EACH CEILING. AVOID USE OF LESS
<br />THAN HALF WIDTH UNITS AT BORDERS, AND COMPLY WITH REFLECTED CEILING PLANS.
<br />COORDINATE PANEL LAYOUT WITH MECHANICAL AND ELECTRICAL FIXTURES.
<br />b. COORDINATION: FURNISH LAYOUTS FOR PRESET INSERTS, CLIPS, AND OTHER CEILING
<br />ANCHORS WHOSE INSTALLATION IS SPECIFIED IN OTHER SECTIONS.
<br />c. FURNISH CONCRETE INSERTS AND SIMILAR DEVICES TO OTHER TRADES FOR
<br />INSTALLATION WELL IN ADVANCE OF TIME NEEDED FOR COORDINATION OF OTHER
<br />WORK.
<br />N. INSTALLATION
<br />a. FOLLOW MANUFACTURER INSTALLATION INSTRUCTIONS.
<br />b. INSTALL SUSPENSION SYSTEM AND PANELS IN ACCORDANCE WITH THE
<br />MANUFACTURER'S INSTRUCTIONS, AND IN COMPLIANCE WITH ASTM C 636 AND WITH
<br />THE AUTHORITIES HAVING JURISDICTION.
<br />c. SUSPEND MAIN BEAM FROM OVERHEAD CONSTRUCTION WITH HANGER WIRES SPACED
<br />4-0 ON CENTER ALONG THE LENGTH OF THE MAIN RUNNER. INSTALL HANGER WIRES
<br />PLUMB AND STRAIGHT.
<br />d. INSTALL WALL MOLDINGS AT INTERSECTION OF SUSPENDED CEILING AND VERTICAL
<br />SURFACES. MITER CORNERS WHERE WALL MOLDINGS INTERSECT OR INSTALL CORNER
<br />CAPS.
<br />e. FOR REVEAL EDGE PANELS: CUT AND REVEAL OR RABBET EDGES OF CEILING PANELS AT
<br />BORDER AREAS AND VERTICAL SURFACES.
<br />f. INSTALL ACOUSTICAL PANELS IN COORDINATION WITH SUSPENDED SYSTEM,WITH
<br />EDGES RESTING ON FLANGES OF MAIN RUNNER AND CROSS TEES. CUT AND FIT
<br />PANELS NEATLY AGAINST ABUTTING SURFACES. SUPPORT EDGES BY WALL MOLDINGS.
<br />O. ADJUSTING AND CLEANING
<br />a. REPLACE DAMAGED AND BROKEN PANELS.
<br />b. CLEAN EXPOSED SURFACES OF ACOUSTICAL CEILINGS, INCLUDING TRIM, EDGE
<br />MOLDINGS, AND SUSPENSION MEMBERS. COMPLY WITH MANUFACTURER'S
<br />INSTRUCTIONS FOR CLEANING AND TOUCH UP OF MINOR FINISH DAMAGE. REMOVE
<br />ANY CEILING PRODUCTS THAT CANNOT BE SUCCESSFULLY CLEANED AND OR REPAIRED.
<br />REPLACE WITH ATTIC STOCK OR NEW PRODUCT TO ELIMINATE EVIDENCE OF DAMAGE.
<br />c. BEFORE DISPOSING OF CEILINGS, CONTACT THE ARMSTRONG RECYCLING CENTER AT
<br />877-276-7876, SELECT OPTION #1 THEN #8 TO REVIEW WITH A CONSULTANT THE
<br />CONDITION AND LOCATION OF BUILDING WHERE THE CEILINGS WILL BE REMOVED.
<br />THE CONSULTANT WILL VERIFY THE CONDITION OF THE MATERIAL AND THAT IT MEETS
<br />THE ARMSTRONG REQUIREMENTS FOR RECYCLING. THE ARMSTRONG CONSULTANT
<br />WITH PROVIDE ASSISTANCE TO FACILITATE THE RECYCLE OF THE CEILING.
<br />9.5 RESILIENT WALL BASE AND ACCESSORIES
<br />A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
<br />INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
<br />B. SAMPLES: SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH MATERIAL SPECIFIED INDICATING
<br />VISUAL CHARACTERISTICS AND FINISH. INCLUDE RANGE SAMPLES IF VARIATION OF FINISH IS
<br />ANTICIPATED.
<br />C. SUBMIT EXTRA STOCK EQUAL TO 2% OF TOTAL USED.
<br />D. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
<br />MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
<br />YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN
<br />ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />E. PERFORMANCE: FIRE PERFORMANCE MEETING REQUIREMENTS OF BUILDING CODE AND
<br />LOCAL AUTHORITIES.
<br />F. RESILIENT WALL BASE:
<br />1. MANUFACTURERS: AS SELECTED BY CONTRACTOR
<br />2. STANDARD: ASTM F 1861.
<br />3. TYPE: TP
<br />4. HEIGHT: 2.5 INCHES.
<br />G. COMPLY WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. INSTALL IN
<br />PROPER RELATION TO ADJACENT WORK.
<br />H. INSTALL BASE AND ACCESSORIES TO MINIMIZE JOINTS. INSTALL BASE WITH JOINTS AS FAR
<br />FROM CORNERS AS PRACTICAL.
<br />I. CLEAN, POLISH, AND PROTECT.
<br />D.DELIVERY, STORAGE AND HANDLING
<br />A. GENERAL: COMPLY WITH REQUIREMENTS IN DIVISION 1
<br />B. ORDERING: COMPLY WITH MANUFACTURER’S ORDERING AND LEAD-TIME
<br />REQUIREMENTS TO AVOID CONSTRUCTION DELAYS
<br />C. DELIVERY: DELIVER MATERIALS IN MANUFACTURER’S ORIGINAL, UNOPENED,
<br />UNDAMAGED CONTAINERS WITH IDENTIFICATION LABELS INTACT
<br />D. STORAGE AND PROTECTION: MATERIAL SHALL BE STORED IN AREAS THAT ARE
<br />ENCLOSED AND WEATHER TIGHT WITH THE PERMANENT HVAC SYSTEM SET AT A
<br />TEMPERATURE OF 65-85 DEGREES FAHRENHEIT (18° TO 29° CELSIUS) FOR A
<br />MINIMUM OF 48 HOURS PRIOR TO COMMENCEMENT OF INSTALLATION
<br />E.PROJECT CONDITIONS
<br />A. ENVIRONMENTAL REQUIREMENTS/CONDITIONS: IN ACCORDANCE WITH
<br />MANUFACTURER’S RECOMMENDATIONS, AREAS TO RECEIVE FLOOR COVERING
<br />SHALL BE CLEAN, FULLY ENCLOSED AND WEATHER TIGHT WITH PERMANENT HVAC
<br />SYSTEM SET TO 65-85 DEGREES FAHRENHEIT (18° TO 29° CELSIUS) FOR 48 HOURS
<br />BEFORE INSTALLATION, DURING INSTALLATION AND FOR 48 HOURS AFTER
<br />INSTALLATION
<br />B. THE TEMPERATURE OF THE SPACE SHALL BE KEPT AT A MINIMUM OF 50° FAHRENHEIT
<br />(10° CELSIUS) CONTINUALLY AFTER INSTALLATION. THE FLOOR COVERING MATERIAL
<br />AND ADHESIVE SHALL BE CONDITIONED IN THE SAME MANNER. EXISTING
<br />CONDITIONS: (SPECIFY EXISTING CONDITIONS AFFECTING PRODUCT USE AND
<br />INSTALLATION)
<br />C. EXISTING FLOOR SHALL BE CLEANED, PATCHED, REPAIRED, AND LEVELED AS
<br />REQUIRED PER MANUFACTURER -VERIFY FLOOR CONDITION IN FIELD PRIOR TO
<br />BID
<br />F.SEQUENCING AND SCHEDULING
<br />A. FINISHING OPERATIONS: INSTALL FLOOR COVERING AFTER FINISHING
<br />OPERATIONS; INCLUDING PAINTING AND CEILING OPERATIONS HAVE BEEN
<br />COMPLETED
<br />B. CONCRETE CURING AND DRYING: DO NOT INSTALL FLOOR COVERING OVER
<br />CONCRETE SUBSTRATES UNTIL SUBSTRATES HAVE CURED AND ARE DRY TO BOND
<br />WITH ADHESIVE AS DETERMINED IN TEST METHODS SPECIFIED IN ASTM F710
<br />G.WARRANTY
<br />A. MANUFACTURER’S MATERIALS WARRANTY: SUBMIT, FOR OWNER’S ACCEPTANCE,
<br />MANUFACTURER’S STANDARD WARRANTY DOCUMENT
<br />B. MANUFACTURER’S WARRANTY IS IN ADDITION TO, AND NOT A LIMITATION OF,
<br />OTHER RIGHTS OWNER MAY HAVE UNDER CONTRACT DOCUMENTS.
<br />1. TOTAL WARRANTY PERIOD: 12 YEAR LIMITED WARRANTY
<br />COMMENCING ON THE DATE OF SUBSTANTIAL COMPLETION.
<br />2. FOR MATERIALS: 1 YEAR FROM DATE OF SUBSTANTIAL
<br />COMPLETION INCLUDING 100% LABOR COSTS
<br />3. FOR SURFACE WEAR 12 YEARS FROM THE DATE OF SUBSTANTIAL
<br />COMPLETION INCLUDING PRO-RATED LABOR COSTS (SEE
<br />WARRANTY FOR DETAILS)
<br />H.MAINTENANCE
<br />A. EXTRA MATERIALS: DELIVER TO THE OWNER EXTRA MATERIALS AS THE PRODUCTS TO BE
<br />INSTALLED. ACKAGE PRODUCTS WITH PROTECTIVE COVERING OR IN ORIGINAL CARTONS
<br />AND IDENTIFY WITH DESCRIPTIVE LABELS. COMPLY WITH DIVISION 1 CLOSEOUT SUBMITTALS
<br />(MAINTENANCE MATERIALS) SECTION
<br />1. QUANTITY: FURNISH QUANTITY OF FLOOR COVERING MATERIAL EQUAL
<br />TO 5% OF THE AMOUNT TO BE INSTALLED
<br />2. DELIVERY, STORAGE AND PROTECTION: COMPLY WITH THE OWNER’S
<br />REQUIREMENTS FOR DELIVERY, STORAGE AND PROTECTION OF EXTRA
<br />MATERIALS
<br />B. MAINTENANCE OF FINISHED FLOOR COVERING SHALL BE ACCORDING TO MILLIKEN
<br />MAINTENANCE INSTRUCTIONS
<br />A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
<br />INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
<br />B. SAMPLES: SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH MATERIAL SPECIFIED INDICATING
<br />VISUAL CHARACTERISTICS AND FINISH. INCLUDE RANGE SAMPLES IF VARIATION OF FINISH IS
<br />ANTICIPATED.
<br />C. SEAMING LAYOUT: SUBMIT PROPOSED SEAMING LAYOUT.
<br />D. EXTRA STOCK: SUBMIT EXTRA STOCK EQUAL TO 2% OF TOTAL USED.
<br />E. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF ACCEPTABLE
<br />MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE FOR THREE
<br />YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN
<br />ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />F. PERFORMANCE: FIRE PERFORMANCE MEETING REQUIREMENTS OF BUILDING CODE AND
<br />LOCAL AUTHORITIES.
<br />G. CARPET MATERIAL:
<br />1. MANUFACTURERS: AS SELECTED BY CONTRACTOR
<br />2. MATERIAL: AS SELECTED.
<br />3. INSTALLATION METHOD: DIRECT GLUE DOWN.
<br />4. AUXILIARY MATERIALS:
<br />a. EDGE GUARDS.
<br />b. ADHESIVES, CEMENTS AND FASTENERS.
<br />c. LEVELING COMPOUND.
<br />H. COMPLY WITH RECOMMENDATIONS OF CARPET AND RUG INSTITUTE 'SPECIFIER'S HANDBOOK'.
<br />I. PREPARE SURFACES AND INSTALL MATERIALS IN ACCORDANCE WITH MANUFACTURER'S
<br /> INSTRUCTIONS AND APPROVED SUBMITTALS. INSTALL MATERIALS IN PROPER RELATION WITH
<br />ADJACENT CONSTRUCTION AND WITH UNIFORM APPEARANCE. COORDINATE WITH WORK OF
<br />OTHER SECTIONS. EXISTING FLOOR SHALL BE CLEANED, PATCHED, REPAIRED, AND LEVELED
<br />AS REQUIRED PER MANUFACTURER -VERIFY FLOOR CONDITION IN FIELD PRIOR TO BID
<br />J. INSTALL EDGE GUARDS AND REDUCER STRIPS AS REQUIRED; CLEAN AND PROTECT.
<br />9.4 SHEET CARPET AND FLOOR PREPARATION
<br />9.3 LUXURY VINYL TILE AND PLANK
<br />A.SECTION INCLUDES: SOLID VINYL FLOOR TILE
<br />B.SUBMITTALS
<br />A. PRODUCT DATA: SUBMIT PRODUCT DATA, INCLUDING MANUFACTURER’S
<br />SPECIFICATION SUMMARY SHEET FOR SPECIFIED PRODUCTS
<br />B. MANUFACTURERS CERTIFICATIONS:
<br />1. PROVIDE MANUFACTURER’S FACTORY LOCATION FOR THE SPECIFIED
<br />PRODUCT(S)
<br />2. PROVIDE ISO 9001 CERTIFICATION AND/OR 14001 CERTIFICATION
<br />C.SHOP DRAWINGS: SUBMIT SHOP DRAWINGS SHOWING LAYOUT, SEAMING
<br />DIAGRAM, FINISH COLORS, DESIGNS AND TEXTURES
<br />D.SAMPLES: SUBMIT 6”SELECTION AND VERIFICATION SAMPLES FOR FINISHES,
<br />COLORS, DESIGNS AND TEXTURES
<br />E.QUALITY ASSURANCE SUBMITTALS: SUBMIT THE FOLLOWING:
<br />1.TEST REPORTS: CERTIFIED TEST REPORTS SHOWING COMPLIANCE WITH
<br />SPECIFIED PERFORMANCE CHARACTERISTICS AND PHYSICAL PROPERTIES
<br />C. QUALITY ASSURANCE
<br />A. REGULATORY REQUIREMENTS:
<br />a. FIRE PERFORMANCE CHARACTERISTICS: PROVIDE RESILIENT PLANK AND/OR
<br />TILE FLOORING WITH THE FOLLOWING FIRE PERFORMANCE
<br />CHARACTERISTICS AS DETERMINED BY TESTING IN ACCORDANCE WITH
<br />ASTM METHODS INDICATED BELOW BY A CERTIFIED TESTING LABORATORY
<br />OR TESTING AND INSPECTING AGENCY ACCEPTABLE TO AUTHORITIES
<br />HAVING JURISDICTION
<br />b. CRITICAL RADIANT FLUX CLASS 1 RATING PER ASTM E 648
<br />c. SMOKE DENSITY; LESS THAN 450 PER ASTM E 662
<br />B. SINGLE SOURCE RESPONSIBILITY: OBTAIN VINYL FLOOR COVERING AND ADHESIVE
<br />FROM A SINGLE SUPPLIER
<br />C. MANUFACTURER QUALIFICATIONS:
<br />1. ISO 9001 CERTIFIED
<br />2. ISO 14001 CERTIFIED
<br />3. OHSAS 18001 CERTIFIED
<br />4. AT LEAST TEN YEARS’ACTIVE EXPERIENCE IN THE MANUFACTURE
<br />AND MARKETING OF COMMERCIAL FLOORING
<br />D.INSTALLER QUALIFICATIONS:
<br />1. INSTALLER QUALIFICATIONS: INSTALLER EXPERIENCED IN PERFORMING
<br />WORK OF THIS SECTION WHO HAS SPECIALIZED IN INSTALLING WORK
<br />SIMILAR TO THAT REQUIRED FOR THIS PROJECT
<br />2. AT LEAST FIVE YEARS’EXPERIENCE IN THE INSTALLATION OF RESILIENT
<br />FLOORING
<br />3. EXPERIENCE ON AT LEAST FIVE PROJECTS OF SIMILAR SIZE, TYPE AND
<br />COMPLEXITY OF CURRENT PROJECT
<br />4. EMPLOYER OF TRADESMEN FOR CURRENT PROJECT WHO ARE COMPETENT
<br />IN TECHNIQUES REQUIRED BY MANUFACTURER FOR RESILIENT FLOORING
<br />INSTALLATION INDICATED
<br />9.6 PAINTING AND STAINING
<br />E. INSTALLER QUALIFICATIONS: A FIRM OR INDIVIDUAL EXPERIENCED IN APPLYING PAINTS AND
<br />COATINGS SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO THOSE INDICATED FOR THIS
<br />PROJECT, WHOSE WORK HAS RESULTED IN APPLICATIONS WITH A RECORD OF SUCCESSFUL
<br />IN-SERVICE PERFORMANCE.
<br />F. PAINT EXPOSED SURFACES. IF A COLOR OF FINISH, OR A SURFACE IS NOT SPECIFICALLY
<br />MENTIONED, ARCHITECT WILL SELECT FROM STANDARD PRODUCTS, COLORS, AND SHEENS
<br />AVAILABLE.
<br />G. DO NOT PAINT PREFINISHED ITEMS, CONCEALED SURFACES, FINISHED METAL SURFACES,
<br />OPERATING PARTS, AND LABELS UNLESS INDICATED.
<br />H. DELIVERY: DELIVER MANUFACTURER'S UNOPENED CONTAINERS TO THE WORK SITE. PACKAGING
<br />SHALL BEAR THE MANUFACTURER'S NAME, LABEL, AND THE FOLLOWING LIST OF
<br />INFORMATION.
<br />1. PRODUCT NAME, AND TYPE (DESCRIPTION).
<br />2. APPLICATION AND USE INSTRUCTIONS.
<br />3. SURFACE PREPARATION.
<br />4. VOC CONTENT.
<br />5. ENVIRONMENTAL HANDLING.
<br />6. BATCH DATE.
<br />7. COLOR NUMBER.
<br />I. STORAGE: STORE AND DISPOSE OF SOLVENT-BASED MATERIALS, AND MATERIALS USED WITH
<br />SOLVENT-BASED MATERIALS, IN ACCORDANCE WITH REQUIREMENTS OF LOCAL
<br />AUTHORITIES HAVING JURISDICTION.STORE MATERIALS IN AN AREA THAT IS WITHIN THE
<br />ACCEPTABLE TEMPERATURE RANGE, PER MANUFACTURER'S INSTRUCTIONS. PROTECT FROM
<br />FREEZING.
<br />J. HANDLING: MAINTAIN A CLEAN, DRY STORAGE AREA, TO PREVENT CONTAMINATION OR DAMAGE
<br />TO THE COATINGS.
<br />K. PROJECT CONDITIONS: MAINTAIN ENVIRONMENTAL CONDITIONS (TEMPERATURE, HUMIDITY, AND
<br />VENTILATION) WITHIN LIMITS RECOMMENDED BY MANUFACTURER FOR OPTIMUM RESULTS.
<br />DO NOT INSTALL PRODUCTS UNDER ENVIRONMENTAL CONDITIONS OUTSIDE
<br />MANUFACTURER'S RECOMMENDED LIMITS.
<br />L. EXTRA MATERIALS: FURNISH EXTRA PAINT MATERIALS FROM THE SAME PRODUCTION RUN AS THE
<br />MATERIALS APPLIED AND, IN THE QUANTITIES, DESCRIBED BELOW. PACKAGE WITH
<br />PROTECTIVE COVERING FOR STORAGE AND IDENTIFY WITH LABELS DESCRIBING CONTENTS.
<br />DELIVER EXTRA MATERIALS TO OWNER. FURNISH OWNER WITH AN ADDITIONAL ONE
<br />PERCENT OF EACH MATERIAL AND COLOR, BUT NOT LESS THAN 1 GAL (3.8 L) OR 1 CASE, AS
<br />APPROPRIATE.
<br />M. ACCEPTABLE MANUFACTURER: SHERWIN-WILLIAMS, WHICH IS LOCATED AT: 101 PROSPECT AVE.;
<br />CLEVELAND, OH 44115; ASD TOLL FREE TEL: 800-524-5979; TEL: 216-566-2000; FAX:
<br />440-826-1989; EMAIL: REQUEST INFOSPECIFICATIONS@SHERWIN.COM;
<br />WEB:WWW.SWSPECS.COM. REQUESTS FOR SUBSTITUTIONS WILL BE CONSIDERED IN
<br />ACCORDANCE WITH THE PROVISIONS OF SECTION 01 60 00 -PRODUCT REQUIREMENTS.
<br />N. INTERIOR PAINT AND COATING SYSTEMS: CONCRETE, METAL, WOOD, DRYWALL
<br />O. EXTERIOR PAINT AND COATING SYSTEMS: PLASTER, METAL, WOOD
<br />P. PAINT MATERIALS -GENERAL:UNLESS OTHERWISE INDICATED, PROVIDE FACTORY-MIXED
<br />COATINGS. WHEN REQUIRED, MIX COATINGS TO CORRECT CONSISTENCY IN
<br />ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS BEFORE APPLICATION.DO NOT
<br />REDUCE, THIN, OR DILUTE COATINGS OR ADD MATERIALS TO COATINGS UNLESS SUCH
<br />PROCEDURE IS SPECIFICALLY DESCRIBED IN MANUFACTURER'S PRODUCT INSTRUCTIONS.
<br />FOR OPAQUE FINISHES, TINT EACH COAT INCLUDING PRIMER COAT AND INTERMEDIATE
<br />COATS, ONE-HALF SHADE LIGHTER THAN SUCCEEDING COAT, WITH FINAL FINISH COAT AS
<br />BASE COLOR. OR FOLLOW MANUFACTURES PRODUCT INSTRUCTIONS FOR OPTIMAL COLOR
<br />CONFORMANCE.
<br />Q. PRIMERS: WHERE THE MANUFACTURER OFFERS OPTIONS ON PRIMERS FOR A PARTICULAR
<br />SUBSTRATE, USE A PRIMER CATEGORIZED AS "BEST" BY THE MANUFACTURER.
<br />R.COATING APPLICATION ACCESSORIES: PROVIDE ALL PRIMERS, SEALERS,CLEANING AGENTS,
<br />CLEANING CLOTHS, SANDING MATERIALS, AND CLEAN-UP MATERIALS REQUIRED, PER
<br />MANUFACTURER'S SPECIFICATIONS.
<br />S. COLOR: REFER TO FINISH SCHEDULE FOR PAINT COLORS, AND AS SELECTED.
<br />T. INTERIOR PAINT AND COATING SYSTEMS (LEED-V4 AND V4.1 NC/CI/CS COMPLIANT)
<br />A. WOOD: DOORS, AND TRIM.
<br />1. LATEX SYSTEMS:
<br />A. SEMI -GLOSS FINISH:
<br />1) 1ST COAT: S-W MULTI-PURPOSE INT./EXT PRIMER/SEALER, B51-450
<br />(4 MILS. WET, 1.44 MILS. DRY PER COAT).
<br />2) 2ND COAT: S-W PRO INDUSTRIAL ACRYLIC SEMI-GLOSS, B66-650
<br />SERIES.
<br />3) 3RD COAT: S-W PRO INDUSTRIAL ACRYLIC SEMI-GLOSS, B66-650
<br />SERIES (2.0-4.0 MILS. DRY PER COAT).
<br />G. EXTERIOR COMPOSITION BOARD (HARDBOARD): SOME COMPOSITION BOARDS MAY
<br />EXUDE A WAXY MATERIAL THAT MUST BE REMOVED WITH A SOLVENT PRIOR TO COATING.
<br />WHETHER FACTORY PRIMED OR UNPRIMED, EXTERIOR COMPOSITION BOARD SIDING
<br />(HARDBOARD) MUST BE CLEANED THOROUGHLY AND PRIMED WITH AN ALKYD PRIMER.
<br />H. DRYWALL -EXTERIOR: MUST BE CLEAN AND DRY. ALL NAIL HEADS MUST BE SET AND
<br />SPACKLED. JOINTS MUST BE TAPED AND COVERED WITH A JOINT COMPOUND. SPACKLED
<br />NAIL HEADS AND TAPE JOINTS MUST BE SANDED SMOOTH, AND ALL DUST REMOVED PRIOR
<br />TO PAINTING. EXTERIOR SURFACES MUST BE SPACKLED WITH EXTERIOR GRADE
<br />COMPOUNDS.
<br />I. DRYWALL -INTERIOR: MUST BE CLEAN AND DRY. ALL NAIL HEADS MUST BE SET AND
<br />SPACKLED. JOINTS MUST BE TAPED AND COVERED WITH A JOINT COMPOUND. SPACKLED
<br />NAIL HEADS AND TAPE JOINTS MUST BE SANDED SMOOTH, AND ALL DUST REMOVED PRIOR
<br />TO PAINTING.
<br />J. GALVANIZED METAL: CLEAN PER SSPC-SP1 USING DETERGENT AND WATER OR A
<br />DEGREASING CLEANER TO REMOVE GREASES AND OILS. APPLY TO A TEST AREA, PRIMING AS
<br />REQUIRED. ALLOW THE COATING TO DRY AT LEAST ONE WEEK BEFORE TESTING. IF
<br />ADHESION IS POOR, BRUSH BLAST PER SSPC-SP16 IS NECESSARY TO REMOVE THESE
<br />TREATMENTS.
<br />K. PLASTER: MUST BE ALLOWED TO DRY THOROUGHLY FOR AT LEAST 30 DAYS BEFORE
<br />PAINTING UNLESS THE PRODUCTS ARE DESIGNED TO BE USED IN HIGH PH ENVIRONMENTS.
<br />ROOM MUST BE VENTILATED WHILE DRYING; IN COLD, DAMP WEATHER, ROOMS MUST BE
<br />HEATED. DAMAGED AREAS MUST BE REPAIRED WITH APPROPRIATE PATCHING MATERIAL. BARE
<br />PLASTER MUST BE CURED AND HARD. TEXTURED, SOFT, POROUS, OR POWDERY PLASTER
<br />SHOULD BE TREATED WITH A SOLUTION OF 1 PINT HOUSEHOLD VINEGAR TO 1 GALLON OF
<br />WATER. REPEAT UNTIL THE SURFACE IS HARD, RINSE WITH CLEAR WATER AND ALLOW TO DRY.
<br />L. STEEL: STRUCTURAL, PLATE, AND SIMILAR ITEMS: SHOULD BE CLEANED BY ONE OR MORE
<br />OF THE SURFACE PREPARATIONS DESCRIBED BELOW. THESE METHODS ARE USED
<br />THROUGHOUT THE WORLD FOR DESCRIBING METHODS FOR CLEANING STRUCTURAL STEEL.
<br />VISUAL STANDARDS ARE AVAILABLE THROUGH THE SOCIETY OF PROTECTIVE COATINGS. A
<br />BRIEF DESCRIPTION OF THESE STANDARDS TOGETHER WITH NUMBERS BY WHICH THEY CAN
<br />BE SPECIFIED FOLLOW.
<br />1. SOLVENT CLEANING, SSPC-SP1: SOLVENT CLEANING IS A METHOD FOR
<br />REMOVING ALL VISIBLE OIL, GREASE, SOIL, DRAWING AND CUTTING COMPOUNDS,
<br />AND OTHER SOLUBLE CONTAMINANTS. SOLVENT CLEANING DOES NOT REMOVE
<br />RUST OR MILL SCALE. CHANGE RAGS AND CLEANING SOLUTION FREQUENTLY SO
<br />THAT DEPOSITS OF OIL AND GREASE ARE NOT SPREAD OVER ADDITIONAL AREAS IN
<br />THE CLEANING PROCESS. BE SURE TO ALLOW ADEQUATE VENTILATION.
<br />2. HAND TOOL CLEANING, SSPC-SP2: HAND TOOL CLEANING REMOVES ALL
<br />LOOSE MILL SCALE, LOOSE RUST, AND OTHER DETRIMENTAL FOREIGN MATTER. IT IS
<br />NOT INTENDED THAT ADHERENT MILL SCALE, RUST, AND PAINT BE REMOVED BY
<br />THIS PROCESS. BEFOREHAND TOOL CLEANING, REMOVE VISIBLE OIL, GREASE,
<br />SOLUBLE WELDING RESIDUES, AND SALTS BY THE METHODS OUTLINED IN SSPC-SP1.
<br />3. POWER TOOL CLEANING, SSPC-SP3: POWER TOOL CLEANING REMOVES
<br />ALL LOOSE MILL SCALE, LOOSE RUST, AND OTHER DETRIMENTAL FOREIGN MATTER.
<br />IT IS NOT INTENDED THAT ADHERENT MILL SCALE, RUST, AND PAINT BE REMOVED BY
<br />THIS PROCESS. BEFORE POWER TOOL CLEANING, REMOVE VISIBLE OIL, GREASE,
<br />SOLUBLE WELDING RESIDUES, AND SALTS BY THE METHODS OUTLINED IN SSPC-SP1.
<br />4. WHITE METAL BLAST CLEANING, SSPC-SP5 OR NACE 1: A WHITE METAL
<br />BLAST CLEANED SURFACE, WHEN VIEWED WITHOUT MAGNIFICATION, SHALL BE
<br />FREE OF ALL VISIBLE OIL, GREASE, DIRT, DUST, MILL SCALE, RUST, PAINT, OXIDES,
<br />CORROSION PRODUCTS, AND OTHER FOREIGN MATTER. BEFORE BLAST CLEANING,
<br />VISIBLE DEPOSITS OF OIL OR GREASE SHALL BE REMOVED BY ANY OF THE METHODS
<br />SPECIFIED IN SSPC-SP1 OR OTHER AGREED UPON METHODS.
<br />5. COMMERCIAL BLAST CLEANING, SSPC-SP6 OR NACE 3: A COMMERCIAL
<br />BLAST CLEANED SURFACE, WHEN VIEWED WITHOUT MAGNIFICATION, SHALL BE
<br />FREE OF ALL VISIBLE OIL, GREASE, DIRT, DUST, MILL SCALE, RUST, PAINT, OXIDES,
<br />CORROSION PRODUCTS, AND OTHER FOREIGN MATTER, EXCEPT FOR STAINING.
<br />STAINING SHALL BE LIMITED TO NO MORE THAN 33 PERCENT OF EACH SQUARE
<br />INCH OF SURFACE AREA AND MAY CONSIST OF LIGHT SHADOWS, SLIGHT STREAKS,
<br />OR MINOR DISCOLORATION CAUSED BY STAINS OF RUST, STAINS OF MILL SCALE,
<br />OR STAINS OF PREVIOUSLY APPLIED PAINT. BEFORE BLAST CLEANING, VISIBLE
<br />DEPOSITS OF OIL OR GREASE SHALL BE REMOVED BY ANY OF THE METHODS
<br />SPECIFIED IN SSPC-SP1 OR OTHER AGREED UPON METHODS.
<br />6. BRUSH-OFF BLAST CLEANING, SSPC-SP7 OR NACE 4: A BRUSH-OFF BLAST
<br />CLEANED SURFACE, WHEN VIEWED WITHOUT MAGNIFICATION, SHALL BE FREE OF
<br />ALL VISIBLE OIL, GREASE, DIRT, DUST, LOOSE MILL SCALE, LOOSE RUST, AND LOOSE
<br />PAINT. TIGHTLY ADHERENT MILL SCALE, RUST, AND PAINT MAY REMAIN ON THE
<br />SURFACE. BEFORE BLAST CLEANING, VISIBLE DEPOSITS OF OIL OR GREASE SHALL BE
<br />REMOVED BY ANY OF THE METHODS SPECIFIED IN SSPC-SP 1 OR OTHER AGREED
<br />UPON METHODS.
<br />7. POWER TOOL CLEANING TO BARE METAL, SSPC-SP11: METALLIC SURFACES
<br />THAT ARE PREPARED ACCORDING TO THIS SPECIFICATION, WHEN VIEWED
<br />WITHOUT MAGNIFICATION, SHALL BE FREE OF ALL VISIBLE OIL, GREASE,DIRT, DUST,
<br />MILL SCALE, RUST, PAINT, OXIDE CORROSION PRODUCTS, AND OTHER FOREIGN
<br />MATTER. SLIGHT RESIDUES OF RUST AND PAINT MAY BE LEFT IN THE LOWER
<br />PORTIONS OF PITS IF THE ORIGINAL SURFACE IS PITTED. PRIOR TO POWER TOOL
<br />SURFACE PREPARATION, REMOVE VISIBLE DEPOSITS OF OIL OR GREASE BY ANY OF
<br />THE METHODS SPECIFIED IN SSPC-SP1, SOLVENT CLEANING, OR OTHER AGREED
<br />UPON METHODS.
<br />8. NEAR-WHITE BLAST CLEANING, SSPC-SP10 OR NACE 2: A NEAR WHITE
<br />BLAST CLEANED SURFACE, WHEN VIEWED WITHOUT MAGNIFICATION, SHALL BE
<br />FREE OF ALL VISIBLE OIL, GREASE, DIRT, DUST, MILL SCALE, RUST, PAINT, OXIDES,
<br />CORROSION PRODUCTS, AND OTHER FOREIGN MATTER, EXCEPT FOR STAINING.
<br />STAINING SHALL BE LIMITED TO NO MORE THAN 5 PERCENT OF EACH SQUARE
<br />INCH OF SURFACE AREA AND MAY CONSIST OF LIGHT SHADOWS, SLIGHT STREAKS,
<br />OR MINOR DISCOLORATION CAUSED BY STAINS OF RUST, STAINS OF MILL SCALE,
<br />OR STAINS OF PREVIOUSLY APPLIED PAINT. BEFORE BLAST CLEANING, VISIBLE
<br />DEPOSITS OF OIL OR GREASE SHALL BE REMOVED BY ANY OF THE METHODS
<br />SPECIFIED IN SSPC-SP1 OR OTHER AGREED UPON METHODS.
<br />9. HIGH-AND ULTRA-HIGH PRESSURE WATER JETTING FOR STEEL AND OTHER
<br />HARD MATERIALS: SSPC-SP12 OR NACE 5: THIS STANDARD PROVIDES
<br />REQUIREMENTS FOR THE USE OF HIGH-AND ULTRA-HIGH PRESSURE WATER
<br />JETTING TO ACHIEVE VARIOUS DEGREES OF SURFACE CLEANLINESS. THIS
<br />STANDARD IS LIMITED IN SCOPE TO THE USE OF WATER ONLY WITHOUT THE
<br />ADDITION OF SOLID PARTICLES IN THE STREAM.
<br />10. WATER BLASTING, SSPC-SP12/NACE NO. 5: REMOVAL OF OIL GREASE DIRT,
<br />LOOSE RUST, LOOSE MILL SCALE, AND LOOSE PAINT BY WATER AT PRESSURES OF
<br />2,000 TO 2,500 PSI AT A FLOW OF 4 TO 14 GALLONS PER MINUTE.
<br />M. VINYL SIDING, ARCHITECTURAL PLASTICS, EIFS AND FIBERGLASS: CLEAN VINYL
<br />SIDING THOROUGHLY BY SCRUBBING WITH A WARM, SOAPY WATER SOLUTION. RINSE
<br />THOROUGHLY. DO NOT PAINT VINYL SIDING WITH ANY COLOR DARKER THAN THE
<br />ORIGINAL COLOR UNLESS THE PAINT SYSTEM FEATURES SHERWIN-WILLIAMS VINYLSAFE
<br />TECHNOLOGY. PAINTING WITH DARKER COLORS THAT ARE NOT SHERWIN-WILLIAMS
<br />VINYLSAFE MAY CAUSE SIDING TO WARP. FOLLOW ALL PAINTING GUIDELINES OF THE VINYL
<br />MANUFACTURER WHEN PAINTING. ONLY PAINT PROPERLY INSTALLED VINYL SIDING.
<br />DEVIATING FROM THE MANUFACTURER'S PAINTING GUIDELINES MAY CAUSE THE WARRANTY
<br />TO BE VOIDED.
<br />N. STUCCO: MUST BE CLEAN AND FREE OF ANY LOOSE STUCCO. IF RECOMMENDED
<br />PROCEDURES FOR APPLYING STUCCO ARE FOLLOWED, AND NORMAL DRYING CONDITIONS
<br />PREVAIL, THE SURFACE MAY BE PAINTED IN 30 DAYS. THE PH OF THE SURFACE SHOULD BE
<br />BETWEEN 6 AND 9 UNLESS THE PRODUCTS ARE DESIGNED TO BE USED IN HIGH PH
<br />ENVIRONMENTS SUCH AS LOXON.
<br />O. WOOD: MUST BE CLEAN AND DRY. PRIME AND PAINT AS SOON AS POSSIBLE.
<br />KNOTS AND PITCH STREAKS MUST BE SCRAPED, SANDED, AND SPOT PRIMED BEFORE A FULL
<br />PRIMING COAT IS APPLIED. PATCH ALL NAIL HOLES AND IMPERFECTIONS WITH A WOOD
<br />FILLER OR PUTTY AND SAND SMOOTH.
<br />Z. INSTALLATION:
<br />A. APPLY ALL COATINGS AND MATERIALS WITH THE MANUFACTURER'S SPECIFICATIONS IN
<br />MIND. MIX AND THIN COATINGS ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
<br />B. DO NOT APPLY IT TO WET OR DAMP SURFACES. WAIT AT LEAST 30 DAYS BEFORE APPLYING
<br />TO NEW CONCRETE OR MASONRY. OR FOLLOW MANUFACTURER'S PROCEDURES TO APPLY
<br />APPROPRIATE COATINGS PRIOR TO 30 DAYS. TEST NEW CONCRETE FOR MOISTURE
<br />CONTENT. WAIT UNTIL WOOD IS FULLY DRY AFTER RAIN OR MORNING FOG OR DEW.
<br />C. APPLY COATINGS USING METHODS RECOMMENDED BY MANUFACTURER.
<br />D. UNIFORMLY APPLY COATINGS WITHOUT RUNS, DRIPS, OR SAGS, WITHOUT BRUSH MARKS,
<br />AND WITH CONSISTENT SHEEN.
<br />E. APPLY COATINGS AT SPREADING RATE REQUIRED TO ACHIEVE THE MANUFACTURERS
<br />RECOMMENDED DRY FILM THICKNESS.
<br />F. REGARDLESS OF THE NUMBER OF COATS SPECIFIED, APPLY AS MANY COATS AS
<br />NECESSARY FOR COMPLETE HIDE, AND UNIFORM APPEARANCE.
<br />G. INSPECTION: THE COATED SURFACE MUST BE INSPECTED AND APPROVED BY THE
<br />ARCHITECT JUST PRIOR TO THE APPLICATION OF EACH COAT.
<br />AA. PROTECTION: PROTECT FINISHED COATINGS FROM DAMAGE UNTIL COMPLETION OF PROJECT.
<br />TOUCH-UP DAMAGED COATINGS AFTER SUBSTANTIAL COMPLETION, FOLLOWING MANUFACTURER'S
<br />RECOMMENDATION FOR TOUCH UP OR REPAIR OF DAMAGED COATINGS. REPAIR ANY DEFECTS
<br />THAT WILL HINDER THE PERFORMANCE OF THE COATINGS.
<br />12 FURNISHINGS
<br />A. PROVIDE INTERIOR SIGNAGE PER ALL LOCAL AND STATE CODE REQUIREMENTS, INCLUDING
<br />ROOM IDENTIFICATION.
<br />B. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
<br />INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
<br />C. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS INDICATING MATERIAL CHARACTERISTICS,
<br />DETAILS OF CONSTRUCTION, CONNECTIONS, AND RELATIONSHIP WITH ADJACENT
<br />CONSTRUCTION.
<br />D. SAMPLES: SUBMIT TWO REPRESENTATIVE SAMPLES OF EACH MATERIAL SPECIFIED
<br />INDICATING VISUAL CHARACTERISTICS AND FINISH. INCLUDE RANGE SAMPLES IF
<br />VARIATION OF FINISH IS ANTICIPATED.
<br />E. QUALITY ASSURANCE: COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE
<br />PRODUCTS OF ACCEPTABLE MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN
<br />SIMILAR SERVICE FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND
<br />STORE MATERIALS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />F. MATERIALS -VERIFY EXISTING SYSTEM IN FIELD AND MATCH FOR ALL NEW SIGNAGE
<br />TYPE: UNFRAMED.
<br />MATERIAL: PLASTIC.
<br />LETTERING: RAISED
<br />G.INSTALL MATERIALS AND SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS
<br />AND APPROVED SUBMITTALS. INSTALL MATERIALS AND SYSTEMS IN PROPER RELATION WITH
<br />ADJACENT CONSTRUCTION AND WITH UNIFORM APPEARANCE. COORDINATE WITH WORK
<br />OF OTHER SECTIONS.
<br />H.RESTORE DAMAGED FINISHES. CLEAN AND PROTECT WORK FROM DAMAGE.
<br />12.1 INTERIOR SIGNAGE
<br />8.3 HOLLOW METAL DOORS & FRAMES
<br />PART 1 GENERAL
<br />1.1 SUMMARY
<br />A. PROVIDE STEEL DOORS AND FRAMES.
<br />1.2 SUBMITTALS
<br />A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
<br />INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
<br />B. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS INDICATING MATERIAL CHARACTERISTICS,
<br />DETAILS OF CONSTRUCTION, CONNECTIONS, AND RELATIONSHIP WITH ADJACENT
<br />CONSTRUCTION.
<br />1.3 QUALITY ASSURANCE
<br />A. COMPLY WITH GOVERNING CODES AND REGULATIONS. PROVIDE PRODUCTS OF
<br />ACCEPTABLE MANUFACTURERS, WHICH HAVE BEEN IN SATISFACTORY USE IN SIMILAR SERVICE
<br />FOR THREE YEARS. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS
<br />IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />B. STANDARDS: ANSI/SDI-100, RECOMMENDED SPECIFICATIONS FOR STANDARD STEEL
<br />DOORS AND FRAMES.
<br />C. PERFORMANCE STANDARDS:
<br />THERMAL-RATED ASSEMBLIES AT EXTERIOR: ASTM C 236 OR ASTM C 976.
<br />PART 2 PRODUCTS
<br />2.1 MATERIALS
<br />A. EXTERIOR STEEL DOORS:
<br />1. MANUFACTURERS: AS SELECTED BY GENERAL CONTRACTOR
<br />2. MATERIAL: MINIMUM 16 GAUGE GALVANIZED STEEL SHEET.
<br />3. DOOR THICKNESS: 1-3/4 INCHES, THERMALLY INSULATED.
<br />4. FINISH: FACTORY PRIMED AND FIELD PAINTED.
<br />5. ACCESSORIES:
<br />C. SILENCERS.
<br />B. EXTERIOR STEEL FRAMES:
<br />1. TYPE: KNOCKDOWN.
<br />2. FINISH: FACTORY PRIMED AND FIELD PAINTED.
<br />PART 3 EXECUTION
<br />3.1 INSTALLATION
<br />A. FABRICATE WORK TO BE RIGID, NEAT AND FREE FROM SEAMS, DEFECTS, DENTS, WARP,
<br />BUCKLE, AND EXPOSED FASTENERS. INSTALL DOORS AND FRAMES IN COMPLIANCE WITH
<br />SDI-100, NFPA 80, AND REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION.
<br />B. PROVIDE THERMALLY IMPROVED DOORS WITH MAXIMUM U-VALUE OF 0.24 BTU/HR./SQ.
<br />FT. DEGREE F (ASTM C 236) FOR ALL EXTERIOR DOORS AND ELSEWHERE AS NOTED.
<br />C. PROVIDE ACOUSTICALLY IMPROVED DOORS WITH MINIMUM STC OF 33 (ASTM E 90 AND
<br />ASTM E 413) WHERE INDICATED.
<br />D. HARDWARE: PREPARE DOORS AND FRAMES TO RECEIVE HARDWARE ON FINAL
<br />SCHEDULE. PROVIDE FOR 3 SILENCERS ON SINGLE DOORFRAMES; 2 ON DOUBLE
<br />DOORFRAMES.
<br />E. SHOP FINISH: CLEAN, TREAT AND PRIME PAINT ALL WORK WITH RUST-INHIBITING PRIMER
<br />COMPARABLE WITH FINISH PAINT SPECIFIED IN DIVISION 9 SECTION. PROVIDE ASPHALT
<br />EMULSION SOUND DEADENING COATING ON CONCEALED FRAME INTERIORS.
<br />F. TOUCH-UP DAMAGED COATINGS READY TO RECEIVE FINISH PAINTING.
<br />9.0 FINISHES
<br />8.2 INTERIOR SOLID WOOD DOORS
<br />A. PRODUCT DATA: SUBMIT MANUFACTURER'S PRODUCT DATA AND INSTALLATION
<br />INSTRUCTIONS FOR EACH MATERIAL AND PRODUCT USED.
<br />B. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS INDICATING MATERIAL CHARACTERISTICS,
<br />DETAILS OF CONSTRUCTION, CONNECTIONS, AND RELATIONSHIP WITH ADJACENT
<br />CONSTRUCTION.
<br />C. WARRANTY: SUBMIT MANUFACTURER'S STANDARD WARRANTY. INCLUDE LABOR AND
<br />MATERIALS TO REPAIR OR REPLACE DEFECTIVE MATERIALS.
<br />1. WARRANTY PERIOD: LIFE OF INSTALLATION
<br />D. OPERATION AND MAINTENANCE DATA: SUBMIT MANUFACTURER'S OPERATION AND
<br />MAINTENANCE DATA, INCLUDING OPERATING INSTRUCTIONS, LIST OF SPARE PARTS AND
<br />MAINTENANCE SCHEDULE.
<br />E. QUALITY STANDARDS: AWI'S 'ARCHITECTURAL WOODWORK STANDARDS.
<br />F. INTERIOR FLUSH WOOD DOORS:
<br />1.TYPE: SOLID CORE.
<br />2.THICKNESS: 1-3/4 INCHES THICK.
<br />4.FRAMES: HOLLOW METAL.
<br />5.FACE: PAINT-GRADE MDF AT ALL PAINTED DOORS; WOOD VENEER TO MATCH
<br />EXISTING ADJACENT AT ALL WOOD VENEER DOORS - VERIFY SPEC IN FIELD PRIOR TO
<br />BID
<br />6.FINISH: SEE DOOR SCHEDULE
<br />G. COMPLY WITH NWMA I.S. 1A AND SPECIFIED QUALITY STANDARD.
<br />H.PREFIT DOORS TO FRAMES. PREMACHINE DOORS FOR HARDWARE LISTED ON FINAL
<br />SCHEDULES. FACTORY BEVEL DOORS.
<br />I. INSTALL DOORS WITH NOT MORE THAN 1/8 INCH CLEARANCE AT TOP AND SIDES, 1/4 INCH AT
<br />BOTTOM. COMPLY WITH NFPA 80 FOR RATED ASSEMBLIES.
<br />J. ADJUST, CLEAN, AND PROTECT.
<br />AH: ADJUSTMENT, CLEANING, AND DEMONSTRATING: PRIOR TO FINAL ADJUSTMENTS, THE
<br />HVAC SYSTEM MUST BE COMPLETED AND BALANCED. TEST THAT ALL OPENINGS MEET ANSI
<br />A117.1 FOR CLOSER OPENING PRESSURE, CLOSING SPEED, LATCHING, AND HARDWARE
<br />OPERATING FORCES. REPLACE ITEMS THAT CANNOT BE ADJUSTED TO OPERATE FREELY AND
<br />SMOOTHLY OR AS INTENDED FOR APPLICATION. PRIOR TO FINAL WALK-THROUGH INSPECTION,
<br />CLEAN ADJACENT SURFACES SOILED BY HARDWARE INSTALLATION. CLEAN FINISH HARDWARE PER
<br />MANUFACTURER’S INSTRUCTIONS AFTER FINAL ADJUSTMENTS HAVE BEEN MADE. REMOVE ALL
<br />PROTECTION AND REPLACE ITEMS THAT CANNOT BE CLEANED TO MANUFACTURER’S LEVEL OF
<br />FINISH QUALITY. DEMONSTRATION AND TRAINING WILL BE CONDUCTED AS PER THE
<br />FOLLOWING SESSIONS. ALL SESSIONS WILL BE RECORDED AND TURNED OVER TO THE OWNER
<br />FOR FUTURE USE.
<br />1. HARDWARE MAINTENANCE: CONDUCT A TRAINING CLASS FOR BUILDING
<br />MAINTENANCE PERSONNEL DEMONSTRATING THE ADJUSTMENT, OPERATION, AND
<br />MAINTENANCE OF ALL HARDWARE. SPECIAL TOOLS FOR FINISH HARDWARE TO BE
<br />TURNED OVER AND DEMONSTRATED USAGE AT THE MEETING.
<br />2. KEY CONTROL SYSTEM: TRAIN THE OWNER’S DESIGNATED REPRESENTATIVE ON THE KEY
<br />CONTROL SYSTEM DEMONSTRATING THE PERMANENT FILE KEYS, DUPLICATE LOANER
<br />KEYS, KEY RECEIPTS, KEY ENVELOPES, KEY CHANGE IDENTIFICATION SHEETS, BITTING
<br />LISTS, TAGS, AND LABELS. WHEN KEY MANAGEMENT SOFTWARE IS PROVIDED TRAINING
<br />WILL BE PROVIDED FOR THE SETUP AND USAGE OF THE SOFTWARE.
<br />AI: PROTECTION: LEAVE MANUFACTURER’S PROTECTIVE FILM INTACT AND, PROTECT EXIT
<br />DEVICES, LOCKS, AND SURFACE MOUNTED HARDWARE WITH KRAFT PAPER OR BUBBLE WRAP.
<br />COVER FIRE LABELS AT PAINTED PRODUCTS THAT BEAR A LABEL WITH MAGNETIC OR MASKING
<br />TAPE. KEEP PROTECTION IN PLACE UNTIL TIME OF FINAL CLEANING AND ADJUSTMENT.
<br />AJ: HARDWARE SET SCHEDULE: DOOR HARDWARE ITEMS HAVE BEEN PLACED IN SETS WHICH ARE
<br />INTENDED TO BE A GUIDE OF DESIGN, GRADE, QUALITY, FUNCTION, OPERATION, AND
<br />PERFORMANCE. REVIEW PRODUCTS THAT MAY REQUIRE MOUNTING ACCESSORIES TO MEET
<br />DOOR, FRAME, AND SWING CONDITIONS AS THESE FINAL DETAILS VARY FROM MANUFACTURER
<br />TO MANUFACTURER AND PROVIDE AS REQUIRED. WHERE ADDITIONAL ITEMS OF HARDWARE ARE
<br />REQUIRED FOR COMPLETION OF THE WORK, A WRITTEN STATEMENT OF SUCH OMISSION,
<br />ERROR, OR OTHER DISCREPANCY IS REQUIRED TO BE SUBMITTED TO THE ARCHITECT, PRIOR TO
<br />BID DATE FOR CLARIFICATION VIA AN ADDENDUM. ABBREVIATIONS LISTED BELOW DO NOT
<br />APPEAR IN THE MANUFACTURER’S LITERATURE, FOR ANY OTHER ABBREVIATIONS REFER TO
<br />MANUFACTURER’S LITERATURE:
<br />a. LDW = LESS THAN DOOR WIDTH
<br />b. LAR = LENGTH AS REQUIRED
<br />c. QTY = QUANTITY
<br />d. CTC = CENTERLINE TO CENTERLINE
<br />e. BTB = BACK-TO-BACK MOUNTING.
<br />AK: HARDWARE SCHEDULE - SEE DOOR SCHEDULE
<br />AB. LATCH PROTECTORS
<br />A. LATCH PROTECTORS OF ONE MANUFACTURER AS LISTED FOR CONTINUITY OF DESIGN AND
<br />CONSIDERATION OF WARRANTY.
<br />B.STANDARDS: MANUFACTURER TO BE LISTED BY THE FOLLOWING: AUXILIARY HARDWARE:
<br />ANSI/BHMA A156.16.
<br />C. DESIGN:
<br />1. 12-GAUGE STEEL, STAINLESS STEEL MATERIAL.
<br />2. SIZE: 3” X 11”.
<br />3. NON-HANDED.
<br />4. FRAME PIN PREVENTS PRYING OF DOOR.
<br />5. USE WITH 1-3/4” THICK DOOR.
<br />6. USE WITH CYLINDRICAL LOCKSETS WITH A 2-3/4” BACKSET AT EXTERIOR OUT-SWINGING
<br />DOORS.
<br />7. FASTENERS: TWO 5/16-20 X 1-1/2” CARRIAGE BOLTS WITH SEX NUTS.
<br />AC. SILENCERS
<br />A. WHERE SMOKE, LIGHT, OR WEATHER SEAL ARE NOT REQUIRED, PROVIDE THREE SILENCERS
<br />PER SINGLE DOOR FRAME, TWO PER DOUBLE DOOR FRAME AND FOUR PER DUTCH DOOR
<br />FRAME.
<br />B.PRODUCTS TO BE CERTIFIED AND LISTED BY THE FOLLOWING:
<br />1. AUXILIARY HARDWARE: ANSI/BHMA A156.16
<br /> AD: APPEARANCE OF FINISHED WORK: VARIATIONS IN APPEARANCE OF ABUTTING OR ADJACENT
<br />PIECES ARE ACCEPTABLE IF WITHIN RANGE OF APPROVED SAMPLES. NOTICEABLE VARIATIONS IN
<br />THE SAME PIECE ARE NOT ACCEPTABLE. VARIATIONS IN APPEARANCE OF OTHER COMPONENTS
<br />ARE ACCEPTABLE IF THEY ARE WITHIN RANGE OF APPROVED SAMPLES. COMPLY WITH BASE
<br />MATERIAL AND FINISH REQUIREMENTS INDICATED BY ANSI/BHMA A156.18 DESIGNATIONS IN
<br />HARDWARE SCHEDULE.
<br />AE: EXAMINATION: EXAMINE DOORS AND FRAMES, WITH INSTALLERS PRESENT, FOR COMPLIANCE
<br />WITH REQUIREMENTS FOR INSTALLATION TOLERANCES, LABELED FIRE-RATED CONSTRUCTION,
<br />WALL AND FLOOR CONSTRUCTION, AND OTHER CONDITIONS AFFECTING PERFORMANCE.
<br />WHERE HARDWARE WILL BE INSTALLED DIRECTLY ON WALLS INSPECT APPLICATIONS FOR
<br />BLOCKING MATERIAL OF SUFFICIENT TYPE AND SIZE FOR HARDWARE. WHERE EXISTING
<br />PRODUCTS WILL BE REUSED, EXAMINE EXISTING DOOR AND FRAME SIZES, PREPS, SWINGS,
<br />RATINGS, AND COMPARE TO THE SPECIFIED HARDWARE FOR COMPATIBILITY AND
<br />FUNCTIONALITY. THE HARDWARE SET SPECIFIED SHOULD ACT AS GUIDE FOR DESIGN AND
<br />FUNCTION. PROVIDE FILLER PLATES AS NEEDED TO FILL AND REPAIR EXISTING MATERIALS. TEST
<br />ANY EXISTING TO REMAIN HARDWARE FOR FUNCTIONALITY AND VISUALLY INSPECT FOR
<br />DAMAGE. NOTE ANY DEFECTIVE OR DAMAGED PRODUCTS AS WELL AS NOTING ANY CODE
<br />DEFICIENCIES AND SUBMIT ISSUES AND ESTIMATED COSTS FOR DIRECTION OF HOW TO
<br />PROCEED WITH REPAIR OR REPLACEMENT. NOTIFY ARCHITECT VIA A PREPARED WRITTEN REPORT
<br />AND ENDORSED BY INSTALLER OF ANY DISCREPANCIES BETWEEN THE DOOR SCHEDULE, DOOR
<br />TYPES, DRAWINGS, AND SCHEDULED HARDWARE. LIST CONDITIONS DETRIMENTAL TO
<br />APPLICATION, TO THE PROPER AND TIMELY COMPLETION OF THE WORK AND PERFORMANCE OF
<br />THE HARDWARE. PROCEED ONLY AFTER SUCH DISCREPANCIES OR CONFLICTS HAVE BEEN
<br />RESOLVED IN WRITING.
<br />AF: INSTALLATION: INSTALL HARDWARE USING MANUFACTURERS’ RECOMMENDED FASTENERS
<br />AND INSTALLATION INSTRUCTIONS, AT HEIGHT LOCATIONS AND CLEARANCE TOLERANCES THAT
<br />COMPLY WITH:
<br />1. NFPA 80
<br />2. NFPA 105
<br />3. ICC/ANSI A117.1
<br />4. DHI PUBLICATION – INSTALLATION GUIDE FOR DOORS AND HARDWARE
<br />5. APPROVED SHOP DRAWINGS
<br />6. APPROVED HARDWARE SCHEDULE
<br />INSTALL SOFFIT MOUNTED GASKETS PRIOR TO OTHER SOFFIT MOUNTED HARDWARE
<br />ENSURING A CONTINUOUS SEAL AROUND THE PERIMETER OF THE OPENING WITHOUT
<br />CUTTING OR NOTCHING. LOCATE SURFACE MOUNTED DOOR CLOSERS ON STAIRWELL SIDE
<br />OF STAIR DOORS, INTERIOR SIDE OF EXTERIOR OPENINGS, OR ON THE ROOM SIDE OF
<br />OPENINGS, UNLESS IT IS A STERILE ROOM. LOCATE WALL MOUNTED BUMPER TO CONTACT
<br />THE OPERATING TRIM. VERIFY THAT PUSHBUTTONS OF LOCKSETS DO NOT CONTACT THE
<br />STOP AND INADVERTENTLY LOCK THE DOOR. MOUNT ARMOR, MOP, AND KICK PLATES FLUSH
<br />WITH THE BOTTOM OF THE DOOR AND CENTERED HORIZONTALLY ON THE DOOR. NOTCH
<br />THRESHOLDS WITH NO LARGER THAN A 1/32-INCH GAP MATCHING THE FRAME PROFILE. SET
<br />IN A FULL BED OF SEALANT COMPLYING WITH REQUIREMENTS SPECIFIED IN DIVISION 07
<br />SECTION “JOINT SEALANTS” FORMING A TIGHT SEAL BETWEEN THRESHOLD AND MOUNTING
<br />SURFACE. CAULK AND SEAL THE ENTIRE PERIMETER TO PREVENT WATER LEAKAGE. REMOVE
<br />EXCESS SEALANTS IMMEDIATELY AND CLEAN THE AREA THOROUGHLY. DO NOT INSTALL
<br />SURFACE MOUNTED ITEMS UNTIL FINISHES HAVE BEEN COMPLETED ON SUBSTRATES INVOLVED.
<br />SET UNIT LEVEL, PLUMB AND TRUE TO LINE LOCATION.
<br />AG: FIELD QUALITY CONTROL: SCHEDULE A FINAL WALK THROUGH TO INSPECT HARDWARE
<br />INSTALLATION TEN (10) BUSINESS DAYS BEFORE FINAL ACCEPTANCE OF THE OWNER. VISUALLY
<br />INSPECT FOR PROPER FASTENERS AND VERIFY THAT DOORS OPEN, CLOSE, LATCH PROPERLY, AND
<br />THAT OPENINGS ARE INSTALLED TO MEET NFPA 80 AND ANSI A117.1 REQUIREMENTS. CORRECT
<br />DEFICIENCIES, INCLUDING MISSING HARDWARE IMMEDIATELY. PROVIDE A WRITTEN REPORT
<br />DETAILING DISCREPANCIES OF EACH OPENING WITHIN FIVE (5) BUSINESS DAYS OF THE WALK
<br />THROUGH. PRIOR TO RECEIVING CERTIFICATE OF OCCUPANCY HAVE DOORS INSPECTED BY A
<br />CERTIFIED FIRE AND EGRESS DOOR ASSEMBLY INSPECTOR (CFDAI), AS CERTIFIED BY INTERTEK (ITS),
<br />SUBMIT A WRITTEN REPORT TO THE OWNER AND CONTRACTOR. DOORS FAILING INSPECTION
<br />MUST BE ADJUSTED, MODIFIED, OR REPLACED TO BE WITHIN APPROPRIATE CODE REQUIREMENTS
<br />WITHOUT DELAY.
<br />B. DRYWALL: WALLS, CEILINGS, GYPSUM BOARD, AND SIMILAR ITEMS.
<br />1. LATEX SYSTEMS:
<br />A. EG-SHEL / SATIN FINISH (EVERYWHERE UNO):
<br />1) 1ST COAT: S-W PROMAR 200 ZERO VOC INTERIOR LATEX PRIMER,
<br />B28W2600 (4 MILS. WET, 1.5 MILS. DRY PER COAT).
<br />2) 2ND COAT: S-W PROMAR 200 ZERO VOC LATEX EG-SHEL,
<br />B20-2600 SERIES.
<br />3) 3RD COAT: S-W PROMAR 200 ZERO VOC LATEX EG-SHEL,
<br />B20-2600 SERIES (4 MILS. WET, 1.7 MILS. DRY PER COAT).
<br />B. EG-SHEL FINISH SCUFF RESISTANT WATERBASE ENAMEL (AT YOUTH ROOM):
<br />1) 1ST COAT: SHERWIN-WILLIAMS PROMAR 200 ZERO VOC INTERIOR
<br />LATEX PRIMER, B28W2600 (4 MILS. WET, 1.5 MILS. DRY PER COAT).
<br />2) 2ND COAT: SHERWIN-WILLIAMS SCUFF TUFF INT. WATERBASED
<br />ENAMEL, EG-SHEL, S24-150 SERIES.
<br />3) 3RD COAT: SHERWIN-WILLIAMS SCUFF TUFF INT. WATERBASED
<br />ENAMEL, EG-SHEL, S24-150 SERIES (4 MILS. WET, 1.2 MILS. DRY PER COAT).
<br />C. METAL: MISCELLANEOUS AND ORNAMENTAL IRON, STRUCTURAL IRON, AND FERROUS
<br />METAL.
<br />1. LATEX SYSTEMS:
<br />A. EG-SHEL / SATIN FINISH HIGH PERFORMANCE:
<br />1) 1ST COAT: S-W PRO INDUSTRIAL PRO-CRYL UNIVERSAL
<br />PRIMER, B66-1310 SERIES (5.0 MILS. WET, 2.0 MILS. DRY PER
<br />COAT).
<br />2) 2ND COAT: S-W PRO INDUSTRIAL ACRYLIC EG-SHEL,
<br />B66-660 SERIES.
<br />3) 3RD COAT: S-W PRO INDUSTRIAL ACRYLIC EG-SHEL,
<br />B66-660 SERIES (2.0-4.0 MILS. DRY PER COAT).
<br />V. EXTERIOR PAINT AND COATING SYSTEMS
<br />A. METAL
<br />1. ALKYD SYSTEMS; WATERBASED:
<br />A. SEMI-GLOSS FINISH (VERIFY / MATCH FINISH OF METAL PANELS :
<br />1) 1ST COAT: S-W PRO INDUSTRIAL PRO-CRYL UNIVERSAL PRIMER,
<br />B66-1310 SERIES (5.0 MILS. WET, 2.0 MILS. DRY PER COAT).
<br />2) 2ND COAT: S-W PRO INDUSTRIAL WATERBASED ALKYD URETHANE
<br />ENAMEL SEMI-GLOSS, B53-1150 SERIES.
<br />3) 3RD COAT: S-W PRO INDUSTRIAL WATERBASED ALKYD URETHANE
<br />ENAMEL SEMI-GLOSS, B53-1150 SERIES (4.0-5.0 MILS. WET, 1.4 -1.7 MILS.
<br />DRY PER COAT).
<br />B. CONCRETE
<br />1. LATEX SYSTEMS:
<br />A. SATIN FINISH:
<br />1) 1ST COAT: S-W A-100 EXTERIOR LATEX SATIN, A82 SERIES.
<br />2) 2ND COAT: S-W A-100 EXTERIOR LATEX SATIN, A82 SERIES.
<br />3) 3RD COAT: S-W A-100 EXTERIOR LATEX SATIN, A82 SERIES (4.0 MILS.
<br />WET, 1.5 MILS. DRY PER COAT).
<br />X. EXAMINATION: DO NOT BEGIN INSTALLATION UNTIL THE SUBSTRATES HAVE BEEN PROPERLY
<br />PREPARED; NOTIFY ARCHITECT OF UNSATISFACTORY CONDITIONS BEFORE PROCEEDING. IF
<br />SUBSTRATE PREPARATION IS THE RESPONSIBILITY OF ANOTHER INSTALLER, NOTIFY
<br />ARCHITECT OF UNSATISFACTORY PREPARATION BEFORE PROCEEDING. PROCEED WITH
<br />WORK ONLY AFTER CONDITIONS HAVE BEEN CORRECTED AND APPROVED BY ALL PARTIES,
<br />OTHERWISE APPLICATION OF COATINGS WILL BE CONSIDERED AS AN ACCEPTANCE OF
<br />SURFACE CONDITIONS. PREVIOUSLY PAINTED SURFACES: VERIFY THAT EXISTING PAINTED
<br />SURFACES DO NOT CONTAIN LEAD BASED PAINTS, NOTIFY ARCHITECT IMMEDIATELY IF LEAD
<br />BASED PAINTS ARE ENCOUNTERED.
<br />Y. SURFACE PREPARATION:
<br />A. GENERAL: SURFACES SHALL BE DRY AND IN SOUND CONDITION. REMOVE OIL, DUST,
<br />DIRT, LOOSE RUST, PEELING PAINT, OR OTHER CONTAMINATION TO ENSURE GOOD
<br />ADHESION.
<br />1. PRIOR TO ATTEMPTING TO REMOVE MILDEW, IT IS RECOMMENDED TO
<br />TEST ANY CLEANER ON A SMALL, INCONSPICUOUS AREA PRIOR TO USE. BLEACH
<br />AND BLEACHING TYPE CLEANERS MAY DAMAGE OR DISCOLOR EXISTING PAINT
<br />FILMS. BLEACH ALTERNATIVE CLEANING SOLUTIONS ARE ADVISED.
<br />2. REMOVE MILDEW BEFORE PAINTING BY WASHING WITH A SOLUTION OF 1
<br />PART LIQUID HOUSEHOLD BLEACH AND 3 PARTS OF WARM WATER. APPLY
<br />SOLUTION AND SCRUB THE MILDEWED AREA. ALLOW SOLUTION TO REMAIN ON
<br />THE SURFACE FOR 10 MINUTES. RINSE THOROUGHLY WITH CLEAN WATER AND
<br />ALLOW THE SURFACE TO DRY BEFORE PAINTING. WEAR PROTECTIVE GLASSES OR
<br />GOGGLES, WATERPROOF GLOVES, AND PROTECTIVE CLOTHING. QUICKLY WASH
<br />OFF ANY OF THE MIXTURE THAT COMES IN CONTACT WITH YOUR SKIN. DO NOT
<br />ADD DETERGENTS OR AMMONIA TO THE BLEACH/WATER SOLUTION.
<br />3. REMOVE ITEMS INCLUDING BUT NOT LIMITED TO THERMOSTATS,
<br />ELECTRICAL OUTLETS, SWITCH COVERS AND SIMILAR ITEMS PRIOR TO PAINTING.
<br />AFTER COMPLETING PAINTING OPERATIONS IN EACH SPACE OR AREA, REINSTALL
<br />ITEMS REMOVED USING WORKERS SKILLED IN THE TRADES INVOLVED.
<br />4. NO EXTERIOR PAINTING SHOULD BE DONE IMMEDIATELY AFTER A RAIN,
<br />DURING FOGGY WEATHER, WHEN RAIN IS PREDICTED, OR WHEN THE TEMPERATURE
<br />IS BELOW 50 DEGREES F (10 DEGREES C), UNLESS PRODUCTS ARE DESIGNED
<br />SPECIFICALLY FOR THESE CONDITIONS. ON LARGE EXPANSES OF METAL SIDING,
<br />THE AIR, SURFACE, AND MATERIAL TEMPERATURES MUST BE 50 DEGREES F (10
<br />DEGREES F) OR HIGHER TO USE LOW TEMPERATURE PRODUCTS.
<br />B. ALUMINUM: REMOVE ALL OIL, GREASE, DIRT, OXIDE, AND OTHER FOREIGN
<br />MATERIAL BY CLEANING PER SSPC-SP1, SOLVENT CLEANING.
<br />D. CONCRETE, SSPC-SP13 OR NACE 6: THIS STANDARD GIVES REQUIREMENTS FOR SURFACE
<br />PREPARATION OF CONCRETE BY MECHANICAL, CHEMICAL, OR THERMAL METHODS PRIOR
<br />TO THE APPLICATION OF BONDED PROTECTIVE COATING OR LINING SYSTEMS. THE
<br />REQUIREMENTS OF THIS STANDARD ARE APPLICABLE TO ALL TYPES OF CEMENTITIOUS
<br />SURFACES INCLUDING CAST-IN-PLACE CONCRETE FLOORS AND WALLS, PRECAST SLABS,
<br />MASONRY WALLS, AND SHOTCRETE SURFACES. AN ACCEPTABLE PREPARED CONCRETE
<br />SURFACE SHOULD BE FREE OF CONTAMINANTS, LAITANCE, LOOSELY ADHERING
<br />CONCRETE, AND DUST, AND SHOULD PROVIDE A SOUND, UNIFORM SUBSTRATE SUITABLE
<br />FOR THE APPLICATION OF PROTECTIVE COATING OR LINING SYSTEMS.
<br />E. CEMENT COMPOSITION SIDING/PANELS: REMOVE ALL SURFACE CONTAMINATION BY
<br />WASHING WITH AN APPROPRIATE CLEANER, RINSE THOROUGHLY AND ALLOW TO DRY.
<br />EXISTING PEELED OR CHECKED PAINT SHOULD BE SCRAPED AND SANDED TO A SOUND
<br />SURFACE. PRESSURE CLEAN, IF NEEDED, WITH A MINIMUM OF 2100 PSI PRESSURE TO
<br />REMOVE ALL DIRT, DUST, GREASE, OIL, LOOSE PARTICLES, LAITANCE, FOREIGN MATERIAL,
<br />AND PEELING OR DEFECTIVE COATINGS. ALLOW THE SURFACE TO DRY THOROUGHLY. THE
<br />PH OF THE SURFACE SHOULD BE BETWEEN 6 AND 9 UNLESS THE PRODUCTS ARE DESIGNED
<br />TO BE USED IN HIGH PH ENVIRONMENTS.
<br />F. COPPER AND STAINLESS STEEL: REMOVE ALL OIL, GREASE, DIRT, OXIDE, AND OTHER
<br />FOREIGN MATERIAL BY CLEANING PER SSPC-SP 2, HAND TOOL CLEANING.
<br />A. PRODUCT DATA: FOR EACH PAINT SYSTEM INDICATED, INCLUDING.
<br />1. PRODUCT CHARACTERISTICS.
<br />2. SURFACE PREPARATION INSTRUCTIONS AND RECOMMENDATIONS.
<br />3. PRIMER REQUIREMENTS AND FINISH SPECIFICATION.
<br />4. STORAGE AND HANDLING REQUIREMENTS AND RECOMMENDATIONS.
<br />5. APPLICATION METHODS.
<br />B. SELECTION SAMPLES: FOR COLORS NOT SPECIFIED, SUBMIT A COMPLETE SET OF COLOR CHIPS
<br />THAT REPRESENT THE FULL RANGE OF MANUFACTURER'S PRODUCTS, COLORS, AND SHEENS
<br />AVAILABLE.
<br />C. VERIFICATION SAMPLES: FOR EACH FINISHED PRODUCT SPECIFIED, SUBMIT SAMPLES THAT
<br />REPRESENT THE ACTUAL PRODUCT, COLOR, AND SHEEN.
<br />D. COATING MAINTENANCE MANUAL: UPON CONCLUSION OF PROJECT, THE CONTRACTOR OR
<br />PAINT MANUFACTURER/SUPPLIER SHALL FURNISH A COATING MAINTENANCE MANUAL, SUCH
<br />AS SHERWIN-WILLIAMS, "CUSTODIAN PROJECT COLOR AND PRODUCT INFORMATION"
<br />REPORT OR EQUAL. MANUAL SHALL INCLUDE AN AREA SUMMARY WITH FINISH SCHEDULE,
<br />AREA DETAIL DESIGNATING WHERE EACH PRODUCT/COLOR/FINISH WAS USED, PRODUCT
<br />DATA PAGES, MATERIAL SAFETY DATA SHEETS, CARE AND CLEANING INSTRUCTIONS,
<br />TOUCH-UP PROCEDURES, AND COLOR SAMPLES OF EACH COLOR AND FINISH USED.
<br />F.SUBMIT THE FOLLOWING:
<br />a. MAINTENANCE DATA: MAINTENANCE DATA FOR INSTALLED PRODUCTS IN
<br />ACCORDANCE WITH DIVISION 1 SECTIONS. INCLUDE METHODS FOR
<br />MAINTAINING INSTALLED PRODUCTS, AND PRECAUTIONS AGAINST
<br />CLEANING MATERIALS AND METHODS DETRIMENTAL TO FINISHES AND
<br />PERFORMANCE
<br />b. WARRANTY: WARRANTY DOCUMENTS SPECIFIED HEREIN
<br />c. QUALIFICATION DATA
<br />1. FOR A QUALIFIED RESILIENT FLOORING INSTALLER SPECIFIED
<br />HEREIN
<br />C. SUBMITTALS
<br />a. PRODUCT DATA: SUBMIT MANUFACTURER'S TECHNICAL DATA FOR EACH TYPE OF
<br />ACOUSTICAL CEILING UNIT AND SUSPENSION SYSTEM REQUIRED.
<br />b. SAMPLES: MINIMUM 6 INCH X 6 INCH SAMPLES OF SPECIFIED ACOUSTICAL
<br />PANEL; 8 INCH LONG SAMPLES OF EXPOSED WALL MOLDING AND SUSPENSION
<br />SYSTEM, INCLUDING MAIN RUNNER AND 4 FOOT CROSS TEES.
<br />c. ACOUSTICAL CERTIFICATIONS: MANUFACTURER'S CERTIFICATIONS THAT
<br />PRODUCTS COMPLY WITH SPECIFIED REQUIREMENTS, INCLUDING LABORATORY
<br />REPORTS SHOWING COMPLIANCE WITH SPECIFIED TESTS AND STANDARDS. FOR
<br />ACOUSTICAL PERFORMANCE, EACH CARTON OF MATERIAL MUST CARRY AN
<br />APPROVED INDEPENDENT LABORATORY CLASSIFICATION OF NRC, CAC, AND AC.
<br />8.1 DOOR HARDWARE (CONTINUED)
<br />M. STEVEN
<br />CAMP
<br />C-18,407
<br />JUN. 30, 2027
<br />RENEWAL DATESTATEOFCALIFORNIA
<br />LICENSED A RCHITECT
<br />PROJECT ARCHITECT:
<br />PROJECT MANAGER:
<br />DRAWN BY:
<br />PROJECT NUMBER:
<br />All ideas, designs and plans indicated or represented
<br />by these drawings are owned by and are the property
<br />of Elements Architecture, Inc. and were created and
<br />developed for use in connection with the specified
<br />project. None of such ideas, designs, or plans shall
<br />be used for any purpose whatsoever without the
<br />written permission of Elements Architecture.
<br />Elements Architecture, Inc.
<br />PROJECT NAME:
<br />NO.DESCRIPTION DATE
<br />M. Steven Camp, AIA
<br />Scott Holland, AIA
<br />PROJECT ADDRESS:
<br />SHELLEY MACDONALD
<br />EA
<br />SHELLEY MACDONALD
<br />STAMPED/SIGNED: 04/08/2026
<br />4/
<br />9
<br />/
<br />2
<br />0
<br />2
<br />6
<br />
<br />7
<br />:
<br />5
<br />2
<br />:
<br />5
<br />7
<br />
<br />A
<br />M
<br />21.105
<br />TENANT
<br />IMPROVEMENT
<br />(PHASE 3)
<br />2909 DAIMLER STREET
<br />SANTA ANA, CA 92705
<br />A9.3
<br />SPECIFICATIONS
<br />COMPASS BIBLE CHURCH,
<br />TUSTIN SANTA ANA
|