ARCHITECT SIX (6) BOUND SETS OF DIMENSIONED SHOP DRAWINGS AND
<br />NEW CEILING HEIGHTS. INSTALL ALL EQUIPMENT IN SUCH A MANNER AS TO
<br />BE READILY ACCESSIBLE FOR MAINTENANCE AND REPAIRS. INSTALL ALL
<br />PIPING AND EQUIPMENT IN SUCH A MANNER AS TO PRESERVE HEADROOM,
<br />AVOID OBSTRUCTIONS, AND KEEP OPENINGS AND PASSAGEWAYS CLEAR.
<br />REQUIRED, THEY SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL
<br />B.
<br />CHARGES.
<br />1.13 LOCATIONS AND ACCESSIBILITY
<br />ITEMIZED EQUIPMENT LISTS, COMPLETE IN ALL DETAILS, WHICH HE
<br />AFTER RECEIPT OF SAME BY THE ARCHITECT.
<br />EXCEPTION TAKEN, WITH EXCEPTIONS NOTED THEREON OR W ILL CALL FOR
<br />MATERIALS IN A MANNER NOT ACCEPTABLE TO THE ARCHITECT WITHOUT
<br />RESUBMIT IF INDICATED, BEFORE COMMENCING THE WORK INVOLVED.
<br />RESUBMITTAL.THE CONTRACTOR SHALL MAKE ALL REVISIONS NOTED,
<br />RETURNED TO THE CONTRACTOR WITHIN A REASONABLE LENGTH OF TIME
<br />TIME. THESE SUBMITTALS WILL BE CHECKED BY THE ARCHITECT AND
<br />GUARANTEE THAT HIS "AS BUILT" DRAWINGS ARE ACCURATE.
<br />LOCATION, ETC., AS REFERRED TO CONCEALED LINES AND EQUIPMENT.
<br />DIFFERENTLY FROM THAT SHOWN ON THE DRAWINGS. THIS SHALL INCLUDE
<br />APPROVAL, ANY CHANGES WHICH ARE REQUIRED SHALL BE MADE AT THE
<br />ALL IN A LEGIBLE WORKMAN LIKE MANNER. THIS CONTRACTOR SHALL
<br />SET OF BLUELINE PRINTS SHOWING ALL WORK WHICH IS INSTALLED
<br />HAVING FIRST SUBMITTED SHOP DRAWINGS AND EQUIPMENT LIST FOR
<br />PROPOSES TO INSTALL. ALL ITEMS SHALL BE SUBMITTED AT THE SAME
<br />CONTRACTOR HAS COMPLIED WITH THE REQUIREMENTS HEREIN SPECIFIED.
<br />EQUIPMENT, MATERIALS, WORKMANSHIP AND TEST AND DETERMINE WHEN THE
<br />JOURNEYMEN, HELPERS AND LABORERS REQUIRED. ALL MATERIALS SHALL BE
<br />CONSTANTLY IN CHARGE OF THE WORK, TOGETHER WITH ALL NECESSARY
<br />SERVICES OF AN EXPERIENCED SUPERINTENDENT, WHO SHALL BE
<br />TRADES SHALL BE EMPLOYED. THE CONTRACTOR SHALL FURNISH THE
<br />BEST QUALITY AND NONE BUT COMPETENT MECHANICS SKILLED IN THEIR
<br />USE SHALL BE OF THE SAME MAKE. ALL WORKMANSHIP SHALL BE OF THE
<br />INSTALLED. ALL ARTICLES PROVIDED FOR THE SAME GENERAL PURPOSE OR
<br />REQUIREMENTS AND SHALL BE NEW AND IN PERFECT CONDITION WHEN
<br />THE INSTALLATION SHALL MEET ASME, ASTM, NFPA, U.L. AND IAPMO
<br />INSTALLED AS RECOMMENDED BY THE MANUFACTURER.
<br />WHOLESALER, DATE OF ORDERS, AND APPROXIMATE DELIVERY DATES.
<br />GIVING DESCRIPTION, PLATE NUMBERS, AND BROCHURES, NAME OF THE
<br />THE ARCHITECT A COMPLETE LIST OF EQUIPMENT AND MATERIALS ORDERED
<br />IN AMPLE QUANTITIES AND AT THE PROPER TIME. HE SHALL DELIVER TO
<br />PURCHASE AND DELIVERY OF ALL EQUIPMENT AND MATERIALS REQUIRED,
<br />RAISE ALL EXISTING PIPING NOT ABOVE NEW CEILING HEIGHTS TO ABOVE
<br />SUBMITTALS BY THE ARCHITECT, THE CONTRACTOR SHALL ARRANGE FOR THE
<br />A. THE ARCHITECT SHALL HAVE THE RIGHT TO ACCEPT OR REJECT
<br />A. IMMEDIATELY AFTER AWARD OF THE CONTRACT AND FINAL RETURN OF
<br />1.12 SELECTION AND ORDERING OF EQUIPMENT AND MATERIALS
<br />A. UNLESS OTHERWISE SPECIFIED, ALL EQUIPMENT AND MATERIALS USED IN
<br />A. INSTALL ALL NEW PIPING ABOVE CEILINGS AND AS HIGH AS POSSIBLE.
<br />C. SUBMITTALS SHALL INCLUDE BUT NOT NECESSARILY BE LIMITED TO THE
<br />D. IN THE EVENT THAT THE CONTRACTOR INSTALLS EQUIPMENT OR
<br />B. COPIES RETURNED TO THE CONTRACTOR WILL BE REVIEW ED WITH NO
<br />1.10 QUALITY OF EQUIPMENT, MATERIALS, AND WORKMANSHIP
<br />A. THE CONTRACTOR SHALL KEEP UP TO DATE, AN ACCURATE DIMENSIONED
<br />1.11 APPROVALS
<br />4. PLUMBING FIXTURES
<br />5. SEISMIC BRACING
<br />6. VALVES
<br />CONTRACTOR'S EXPENSE.
<br />1.9 AS-BUILT DRAWINGS
<br />FOLLOWING:
<br />2. PIPE AND FITTINGS
<br />3. PIPE ISOLATORS
<br />1. INSULATION
<br />1.4 SITE INSPECTION
<br />FULL SET FORTH IN BOTH.
<br />1.7 DRAWINGS AND SPECIFICATIONS
<br />BE CONSTRUED AS MINIMUM REQUIREMENTS.
<br />TO PERMIT WORK IN VIOLATION THEREOF. REGULATIONS AND CODES ARE TO
<br />CONTRACTOR FOR ANY ERROR THROUGH NEGLIGENCE IN OBSERVING THE SITE
<br />CONNECTION, ETC. NO ALLOWANCE WILL BE MADE SUBSEQUENTLY TO THE
<br />SITE UNDER WHICH HE WILL BE REQUIRED TO OPERATE INCLUDING EXIST.
<br />PIPING TO BE RAISED OR REROUTED AND VERIFYING ALL POINTS OF
<br />THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, OR NEAR THE
<br />REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE
<br />AGENCIES SHALL BE CONSIDERED AS PART OF THE CODES.
<br />BUT NOT SPECIFIED OR SHOWN ON THE DRAWINGS.
<br />INSPECTIONS TO THE ARCHITECT.
<br />DRAWINGS AND SPECIFICATIONS.
<br />COMPLEMENTARY DRAWINGS AND CALCULATIONS REQUIRED BY ANY
<br />TO THE ARCHITECT FOR ADJUSTMENT BEFORE PROCEEDING WITH THE WORK.
<br />TO THE MATTER, HE DOES SO ON HIS OWN RESPONSIBILITY AND AT HIS
<br />SHOULD THE CONTRACTOR PROCEED WITH THE WORK WITHOUT SO REFERRING
<br />AUTHORITIES HAVING JURISDICTION. ARRANGE AND PAY FOR ANY REQUIRED
<br />INSPECTIONS OR EXAMINATIONS AND DELIVER CERTIFICATES OF SUCH
<br />DRAWINGS AND SPECIFICATIONS,THE CONTRACTOR SHALL REFER THE MATTER
<br />CALLED FOR ON ONE AND NOT THE OTHER SHALL BE FURNISHED AS THOUGH
<br />A. THE ARCHITECT'S DECISION WILL BE FINAL ON INTERPRETATION OF THE
<br />C. SHOULD THERE APPEAR AN ERROR OR DISCREPANCY IN OR BETWEEN THE
<br />B. THE DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY AND ANY WORK
<br />D. DRAWINGS ARE DIAGRAMMATIC.
<br />A. CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE CONDITIONS AT THE
<br />B. NOTHING IN THESE DRAWINGS AND SPECIFICATIONS IS TO BE CONSTRUED
<br />A. OBTAIN AND PAY FOR ALL NECESSARY PERMITS, FEES, ASSESSMENTS,
<br />E. THE RESPONSIBILITY OF THE ARCHITECT TO CONDUCT CONSTRUCTION
<br />D. RULINGS, REGULATIONS, AND INTERPRETATIONS OF THE ENFORCING
<br />C. NO EXTRAS WILL BE PAID FOR FURNISHING ITEMS REQUIRED BY CODES
<br />1.6 PERMITS, FEES, AND INSPECTIONS
<br />1.5 ORDINANCE, REGULATIONS, AND CODES
<br />ETC. SHALL BE FIELD VERIFIED.
<br />BE SECURED BUT THEIR EXTREME ACCURACY CANNOT BE GUARANTEED. THE
<br />BE GOVERNED BY THE BUILDING. THIS CONTRACTOR SHALL ACCEPT THIS
<br />THE CONTRACTOR AND EXACT LOCATIONS, DISTANCES, LEVELS, ETC. WILL
<br />DRAWINGS AND SPECIFICATIONS ARE FOR ASSISTANCE AND GUIDANCE OF
<br />CONDITIONS, UTILITIES, POINTS OF CONNECTION, INVERT ELEVATIONS,
<br />DATA WITH THIS UNDERSTANDING. ALL DATA CONCERNING EXISTING
<br />A. BEFORE STARTING WORK, THE CONTRACTOR SHALL FURNISH TO THE
<br />E. THE DATA GIVEN HEREIN AND ON THE DRAWINGS ARE AS EXACT AS COULD
<br />OWN EXPENSE.
<br />1.8 SUBMITTALS
<br />CONSTRUCTION SITE.
<br />CONDITIONS.
<br />INCLUDED UNDER THIS SECTION.
<br />TO COMPLETE THE CONTRACT, INCLUDING BUT NOT LIMITED TO THESE
<br />BE AS DIRECTED AND SCHEDULED BY THE OWNER.
<br />WORK AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS NECESSARY
<br />A. FURNISH MATERIALS AND PERFORM LABOR REQUIRED TO EXECUTE THIS
<br />B. ACCESS TO PORTIONS OF THE BUILDING MAY BE RESTRICTED AND SHALL
<br />A. THE GENERAL CONDITIONS OF THE SPECIFICATIONS APPLY TO ALL WORK
<br />ELECTRICAL, CONCRETE, PAINTING, STRUCTURAL AND AIR CONDITIONING
<br />1.2 RELATED WORK SPECIFIED ELSEWHERE
<br />1.3 GENERAL REQUIREMENTS
<br />WORK EXCEPT AS NOTED.
<br />MAJOR ITEMS.
<br />A. THE INSTALLATION SHALL COMPLY WITH ALL OF THE LATEST APPLICABLE
<br />ORDINANCES, REGULATIONS, CODES AND REQUIREMENTS OF ANY AGENCY
<br />HAVING JURISDICTION, INCLUDING BUT NOT LIMITED TO THE STATE FIRE
<br />MARSHAL, DIVISION OF INDUSTRIAL SAFETY, O.S.H.A., N.F.P.A. 13 AND 99,
<br />CALIFORNIA ELECTRIC CODE, CALIFORNIA PLUMBING CODE, CALIFORNIA
<br />MECHANICAL CODE, AND THE CALIFORNIA ENERGY CONSERVATION
<br />COMMISSION.
<br />YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. SHOULD ANY
<br />REPAIR OR REPLACE THE DEFECTIVE ITEM FREE OF CHARGE TO THE OWNER,
<br />DEFECTS OCCUR DURING THIS PERIOD, THE CONTRACTOR SHALL PROMPTLY
<br />MATERIAL INSTALLED BY HIM FOR A PERIOD OF NOT LESS THAN ONE (1)
<br />A. THE CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, EQUIPMENT AND
<br />INCLUDING COST OF LABOR, BASED UPON NORMAL WORKING HOURS.
<br />OBJECTIONABLE VIBRATION AND NOISE.
<br />1.17 PROTECTION OF EQUIPMENT AND MATERIALS
<br />1.18 CLOSING-IN OF UN-INSPECTED WORK
<br />REPAIRS WITH SUCH MATERIALS AS MAY BE NECESSARY TO RESTORE ALL
<br />HIS WORK AND THAT OF THE OTHER TRADES TO ITS ORIGINAL AND PROPER
<br />CHARACTERISTICS, SIZE, MODEL, SERIAL NUMBER, ETC.
<br />A. THE PREMISES AND EXISTING BUILDING AT THE SITE W ILL BE IN USE
<br />ATTACHED TO EACH PIECE OF EQUIPMENT, SHOWING COMPLETE PERFORMANCE
<br />BE PROVIDED WITH THE MANUFACTURER'S METAL IDENTIFICATION LABELS
<br />A. ALL EQUIPMENT FURNISHED AND INSTALLED UNDER THIS SECTION SHALL
<br />OR FIXTURES FURNISHED AND/OR INSTALLED BY HIM FOR A PERIOD OF ONE
<br />OF THE PREMISES CAUSED BY LEAKS OR BREAKS IN PIPING, EQUIPMENT,
<br />A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO ANY PART
<br />(1) YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION.
<br />ETC., SHALL BE CORE DRILLED BY THE CONTRACTOR AS DIRECTED BY THE
<br />EQUIPMENT. ANY OPENINGS OR CHANGES TO THE EXISTING WALLS, SLABS,
<br />OF OPENINGS WHICH ARE REQUIRED IN NEW WALLS, ETC., FOR PIPING AND
<br />A. FURNISH INFORMATION TO AFFECTED SECTIONS ON SIZE AND LOCATION
<br />ARCHITECT WITH PRIOR APPROVAL BY THE STRUCTURAL ENGINEER.
<br />OR DANGER TO THE PERSONNEL OR PREMISES.
<br />A. PAINTING OF ALL PIPING AND MISCELLANEOUS METALS IS INCLUDED
<br />A. PIPING SHALL BE PROVIDED WITH WESTLINE KOLBI "CUSTOM" OR SETON
<br />2021 NFPA 99 STANDARDS AND AS RECOMMENDED BY THE MANUFACTURER.
<br />"SETMARK" PIPE MARKERS. INSTALLED IN ACCORDANCE WITH THE OSHA AND
<br />WITH ONE COAT OF METAL PRIMER IMMEDIATELY FOLLOWING FABRICATION.
<br />TO THE WEATHER WHICH ARE NOT FACTORY FINISHED SHALL BE PAINTED
<br />UNDER ANOTHER SECTION OF THE WORK; HOWEVER, ALL SURFACES EXPOSED
<br />BE MADE. THE SCHEDULING OF THE SHUT DOWN PERIOD SHALL BE AT A
<br />EXCEPT FOR DESIGNATED INTERVALS DURING WHICH CONNECTIONS CAN
<br />B. HE SHALL MAINTAIN CONTINUITY OF SERVICE TO THE EXISTING WATER,
<br />CONTRACTOR SHALL CONDUCT HIS WORK SO AS TO CAUSE NO INCONVENIENCE
<br />NO. A-11G METAL FRAME UNDER GLASS, OR APPROVED EQUAL, LOCATED AS
<br />C. PROVIDE A TYPED VALVE IDENTIFICATION LIST MOUNTED IN A SETON
<br />B. ALL VALVES SHALL BE PROVIDED WITH NUMBERED VALVE TAG WITH
<br />ABBREVIATION "PLBG" COMPLETE WITH "S" MOUNTING CLIP.
<br />AT THE TIME THE WORK OF THIS CONTRACT IS IN PROGRESS. THE
<br />EQUIPMENT AND MATERIALS FROM DAMAGE.
<br />FACILITIES FOR ALL EQUIPMENT AND MATERIALS AND PROTECT SUCH
<br />A. THE CONTRACTOR SHALL PROVIDE ADEQUATE AND PROPER STORAGE
<br />HIM SHALL BE SUPPORTED IN SUCH A MANNER AS TO BE FREE FROM
<br />C. HE SHALL GUARANTEE THAT ALL EQUIPMENT OR PIPING INSTALLED BY
<br />PERFORM IN ACCORDANCE WITH THE DETAILED DRAWINGS AND
<br />ENTIRE SYSTEM INSTALLED BY HIM AND THAT ALL APPARATUS WILL
<br />WORK AND AFTER IT HAS BEEN INSPECTED AND TESTED, MAKE ALL
<br />INSPECTION AND TEST, HE SHALL, AT HIS OWN EXPENSE, UNCOVER THE
<br />B. SHOULD ANY OF HIS WORK BE COVERED UP OR ENCLOSED BEFORE SUCH
<br />COVERED UP OR ENCLOSED UNTIL IT HAS BEEN INSPECTED AND TESTED.
<br />B. HE SHALL GUARANTEE THE COMPLETE AND PERFECT OPERATION OF THE
<br />THIS SECTION OR SPECIFICATIONS.
<br />(SEE CALIFORNIA PLUMBING CODE, 2022 EDITION).
<br />CONNECTIONS, AND BE RESPONSIBLE FOR THE PROPER OPERATION OF HIS
<br />THE LINE VOLTAGE ELECTRICAL WORK IS UNDER ELECTRICAL SPECS. AND LOW
<br />VOLTAGE CONDUIT WHEN REQUIRED IS SPECIFIED AND INSTALLED UNDER
<br />A. FURNISH ALL CONTROLS, WITH INSTRUCTIONS FOR MAKING THE
<br />ACCOMPLISH THE ABOVE RESULTS.
<br />CONTRACTOR'S RESPONSIBILITY AND EXPENSE.
<br />MAXIMUM HEADROOM AND ACCESSIBILITY.
<br />INTEREST OF OBTAINING THE MOST PRACTICAL OVERALL ARRANGEMENT OF
<br />EQUIPMENT, PIPING, LIGHTING, CONDUIT AND DUCTS TO MAINTAIN
<br />UNDERSTOOD THAT NO EXTRAS TO THE CONTRACTOR WILL BE PERMITTED TO
<br />SO DIRECTED BY THE ARCHITECT OR HIS REPRESENTATIVE. IT SHALL BE
<br />SHALL BE REMOVED AND REINSTALLED AT THE CONTRACTOR'S EXPENSE WHEN
<br />BY THIS CONTRACTOR WHICH INTERFERES WITH THE WORK OF OTHER TRADES
<br />PROPERLY ADJUSTED BEFORE THE WORK IS INSTALLED. WORK INSTALLED
<br />HIS WORK AND THAT OF OTHER TRADES SO THAT THE CONFLICT MAY BE
<br />SCALE WITH ALL PIPING, DUCTS, CONDUITS, LIGHTING, BEAMS, ETC.,
<br />INSTALLING OF NEW PIPING AND/OR RELOCATION OF PIPING. ANY PIPING
<br />ELEVATIONS OF ALL EXISTING PIPING AND CONNECTIONS PRIOR TO
<br />COORDINATION WITH OTHER TRADES SHALL BE DONE AT THE
<br />INSTALLED PRIOR TO VERIFYING POINTS OF CONNECTION AND
<br />A. THE CONTRACTOR SHALL COOPERATE WITH THE OTHER TRADES IN THE
<br />C. THE CONTRACTOR SHALL COORDINATE ANY POINTS OF CONFLICT BETWEEN
<br />A. THE CONTRACTOR SHALL VERIFY LOCATIONS, SIZES AND INVERT
<br />B. AREAS OF LIMITED CLEARANCE SHALL BE LAID OUT TO 3/4" = 1'0"
<br />1.15 VERIFICATION OF EXISTING SERVICES
<br />1.14 COOPERATION WITH OTHER TRADES
<br />SHOWN.
<br />1.25 ELECTRICAL WORK
<br />DIRECTED BY THE ARCHITECT.
<br />EQUIPMENT.
<br />B.
<br />1.24 PIPE AND VALVE IDENTIFICATION
<br />1.23 PAINTING
<br />1.21 EQUIPMENT LABELS
<br />1.22 MAINTAINING EXISTING SERVICES
<br />AND SANITARY SEWER SYSTEMS,
<br />TIME DIRECTED BY THE OWNER.
<br />CONDITION.
<br />1.20 DAMAGE BY LEAKS
<br />1.19 OPENINGS
<br />1.16 GUARANTEES
<br />SPECIFICATIONS.
<br />IF CHANGES IN THE INDICATED LOCATIONS OR ARRANGEMENTS ARE
<br />APPROVED BY AHJ AND FACTORY MUTUAL.
<br />COUPLINGS APPROVED BY AHJ AND FACTORY MUTUAL.
<br />CAST IRON SOIL PIPE AND FITTINGS, WITH HEAVY DUTY STAINLESS STEEL
<br />PIPE AND FITTINGS WITH HEAVY DUTY STAINLESS STEEL COUPLINGS
<br />FERROUS SEAT, 150 PSI.
<br />B. VENT PIPING: SHALL BE COATED SERVICE WEIGHT NO-HUB CAST IRON SOIL
<br />SHUTOFF VALVES SHALL BE SOLDERED ENDS,
<br />SOLDERED, LEAD FREE, ASTM B32-
<br />BALL - APOLLO 82-100 SERIES, 3 PIECE BRONZE, FULL PORT
<br />ANSI B16.22, WROUGHT COPPER OR BRASS, SOLDER
<br />ASTM B88, TYPE L, HARD DRAWN COPPER TUBE.
<br />CAST BRONZE OR COPPER, GROUND JOINT, NON-
<br />PACKING, DESIGNED FOR WORKING PRESURES UP TO
<br />BRONZE - BODIED, DOUBLESEAL, FULL FLOW, UNION
<br />D. WHEREVER DISSIMILAR PIPING IS CONNECTED, THE CONTRACTOR SHALL
<br />COMPOUND APPLIED TO THE MALE THREAD ONLY WITH NOT MORE THAN TWO
<br />PROVIDE A DIELECTRIC FITTING BY "CAPITOL", "EPCO" OR "WEDGESEAL".
<br />C. COLD WATER, HOT WATER, HOT WATER RETURN AND
<br />A. SCREWED PIPE JOINTS SHALL BE MADE UP WITH APPROVED PIPE
<br />B. CAST IRON PIPE JOINTS SHALL BE MADE UP WITH APPROVED IDEAL
<br />C. ALL CAST IRON SOIL PIPE AND FITTINGS SHALL CONFORM TO THE
<br />CURRENT CAST IRON SOIL PIPE INSTITUTE SPECIFICATIONS.
<br />THREADS LEFT EXPOSED. ENDS OF PIPE SHALL BE REAMED TO THE FULL
<br />A. SOIL AND WASTE PIPING: SHALL BE COATED SERVICE WEIGHT, NO-HUB
<br />COUPLINGS OR EQUAL.
<br />UNIONS:
<br />2.2 MAKING-UP PIPE
<br />DIAMETER.
<br />VALVES:
<br />300 PSI.
<br />CONDENSATE DRAIN PIPING:
<br />FITTINGS:
<br />JOINTS:
<br />PIPE:
<br />TYPE.
<br />95TA.
<br />2.1 MATERIALS
<br />1.1 DESCRIPTION
<br />C. CAST IRON PIPE SHALL HAVE A HANGER AT THE JOINT OF EACH PIPE
<br />B. COPPER PIPE SHALL HAVE HANGERS EVERY 10 FEET, EXCEPT 1-1/2 INCH
<br />SUCH AS MASON INDUSTRIES, INC. OPM-0043-13 OR B-LINE/TOLCO
<br />A. SUPPORT HORIZONTAL PIPING WITH ELCEN NO. 89, PHD NO. 151 OR
<br />OPM-0052-13. USE INSULATION PROTECTION SHIELD FOR INSULATED PIPING.
<br />"UNISTRUT", "SPEED STRUT", "SUPER STRUT", OR "FAMET" CHANNEL.
<br />D. WHERE PIPING IS CONCEALED IN WALLS, SUPPORTS SHALL BE
<br />SUPPORTS WITH EARTHQUAKE BRACING AS PRE-APPROVED SYSTEMS
<br />GRINNEL NO. 70, ADJUSTABLE STEEL BAND; PIPE HANGERS AND ROD
<br />STRUCTURE. WHERE PIPE MUST COME IN CONTACT, PROVIDE PIPE
<br />E. IN NO CASE SHALL PIPING COME IN CONTACT WITH THE BUILDING
<br />COLD WATER AND MEDICAL GAS PIPING WITH SEMCO "TRISOLATORS".
<br />A. ISOLATE ALL PIPE HANGERS OR PIPING SUPPORTS FROM HOT WATER,
<br />B. PROVIDE CHROME PLATED SET SCREW FLANGE ON ALL PIPING
<br />PENETRATING FINISHED FLOORS, WALLS AND CEILINGS.
<br />IDENTIFIED WITH SEMIRIGID PLASTIC IDENTIFICATION MARKERS, SETMARK
<br />OPERATIONS (EXCEPT PIPING IN INACCESSIBLE SPACES) SHALL BE
<br />A. ALL SERVICE PIPING WHICH IS ACCESSIBLE FOR MAINTENANCE
<br />SLEEVES SHALL BE CAULKED WITH 3M BRAND FIRE BARRIER OR CSFM
<br />A. WHERE FIREPROOFING IS REQUIRED, THE SPACE BETWEEN PIPE AND
<br />2.5 PIPE SLEEVES AND PLATES
<br />PIPE MARKERS, OR EQUAL.
<br />2.6 PIPE IDENTIFICATION
<br />APPROVED EQUAL.
<br />2.4 PIPE ISOLATORS
<br />AND SMALLER, EVERY 6 FEET.
<br />ISOLATORS AS HEREIN SPECIFIED.
<br />LENGTH.
<br />2.3 HANGERS AND SUPPORTS
<br />BE MOUNTED UNDER THE FIXTURES, UNLESS OTHERWISE SPECIFIED.
<br />3. FIXTURE HEIGHTS SHALL BE AS DIRECTED BY THE ARCHITECT.
<br />2. WHERE SERVICES PASS THROUGH A WALL, FLOOR OR CEILING, PROVIDE
<br />FOR AND ESCUTCHEON HEAVILY CHROME PLATED AND FASTENED WITH
<br />AND THE FIXTURE SHALL BE FILLED WITH DAP OR APPROVED EQUAL
<br />5. FIXTURES AND ACCESSORIES SHALL BE AMERICAN STANDARD, KOHLER,
<br />BRIGGS, CRANE, JUST OR ELKAY AS EQUAL, UNLESS OTHERWISE NOTED.
<br />FIXTURES AND TRIM SHALL BE OF ONE MANUFACTURER.
<br />4. ALL VOIDS BETWEEN THE COUNTERTOP
<br />FIXTURE GROUT.
<br />SET SCREW.
<br />LABORATORIES, INC. (UL). TEST SHALL INCLUDE INSULATION, JACKETS,
<br />FITTINGS, ADHESIVES, COATINGS AND ACCESSORIES. COMPOSITE PRODUCTS
<br />A. ALL HOT WATER PIPING INSULATION SHALL BE TESTED BY UNDERWRITERS
<br />ANY OTHER COMPONENTS, SHALL HAVE A FLAME-SPREAD RATING NOT TO
<br />INSULATION MATERIALS, INCLUDING FACINGS, ADHESIVE FOR FACINGS AND
<br />EXCEED 25, AND A SMOKE DENSITY NOT TO EXCEED 50 WHEN TESTED IN
<br />ACCORDANCE WITH U.B.C. STANDARD NO. 42-1, EXCEPT WHERE MORE
<br />STRINGENT REQUIREMENTS ARE NOTED. FURNISH AFFIDAVIT FROM
<br />SECTIONAL PIPE INSULATION WITH FACTORY APPLIED JACKETS (AP-T)
<br />HOT PIPING, TEMPERATURE TO 450°F: GLASS FIBER, ONE-PIECE (HD)
<br />THERMAL CONDUCTIVITY (AT 75°F MEAN) NOT MORE THAN 0.23 BTU/HR.
<br />SQ. FT./F/IN. 3 P.C.F. DENSITY MINIMUM.
<br />INSULATION SHALL BE AS MANUFACTURED BY: JOHNS-MANVILLE,
<br />SHALL MEET THE FIRE HAZARD REQUIREMENTS OF NFPA 99.
<br />1. PLUMBING FIXTURE TRIM SHALL BE BRASS WITH HEAVY POLISHED
<br />CHROMIUM PLATED FINISH, UNLESS OTHERWISE SPECIFIED. INDIVIDUAL
<br />LOOSE KEY STOPS SHALL BE PROVIDED FOR ALL SUPPLIES AND SHALL
<br />2.8 PLUMBING FIXTURES
<br />OWENS-CORNING OR NATIONAL GYPSUM
<br />A. GENERAL
<br />MANUFACTURER THAT PRODUCTS DELIVERED TO PROJECT MEET
<br />2.7 INSULATION:
<br />REQUIREMENTS SPECIFIED.
<br />WITH SELF SEALING LAPS FIBERGLASS INSULATION (HD) SHALL HAVE
<br />D. ALL BURRED ENDS OF ALL WATER PIPING AND TUBING SHALL BE REAMED
<br />3.1 CLEANING UP
<br />H. UNLESS FLANGES ARE INDICATED, A UNION SHALL BE INSTALLED ON ONE
<br />AND SERVICING. UNDER NO CIRCUMSTANCES SHALL UNIONS BE
<br />K. NO HOT WATER LINE SHALL BE RUN PARALLEL TO A COLD WATER LINE
<br />OF ALL PIPING. PROVIDE SWING FITTINGS AND ANCHORS AS REQUIRED
<br />I. MAKE SUITABLE PROVISION FOR MAXIMUM EXPANSION AND CONTRACTION
<br />SIDE OF ALL SCREWED SHUTOFF VALVES, EQUIPMENT CONNECTIONS AND
<br />J. REDUCING FITTINGS SHALL BE USED IN LIEU OF BUSHINGS. CLOSE
<br />ELSEWHERE AS INDICATED OR REQUIRED FOR EASE OF INSTALLATION
<br />AND THE TESTS OPERATED IN THE PRESENCE OF THE INSPECTOR
<br />BE TESTED IN ACCORDANCE WITH CITY AND STATE ORDINANCES, N.F.P.A.,
<br />ADVANCE WHEN THE PIPING IS READY FOR TESTING. ALL PIPES SHALL
<br />ELIMINATING OF NOISE AND VIBRATION AND LET IN FIRST CLASS
<br />ADJUSTED TO INSURE PROPER FUNCTIONING OF ALL CONTROLS,
<br />B. THE ARCHITECT SHALL BE NOTIFIED TWENTY-FOUR (24) HOURS IN
<br />L. IN MAKING UP LINES OF BRASS OR CHROME PIPE, AN APPROVED TYPE
<br />A. EACH PIECE OF EQUIPMENT AND ALL OF THE SYSTEMS SHALL BE
<br />FRICTION WRENCH SHALL BE USED TO AVOID MARKING OF THE PIPE.
<br />NEARER THAN 8", EXCEPT NEAR FIXTURES OR EQUIPMENT, CONNECTIONS.
<br />OPERATING CONDITION.
<br />3.4 TESTING AND ADJUSTING
<br />INSTALLED IN UNACCESSIBLE LOCATIONS.
<br />NIPPLES WILL NOT BE PERMITTED.
<br />AND/OR AS DIRECTED ON THE JOB.
<br />INSTALLED AND FINAL CONNECTIONS MADE.
<br />THIS SECTION OF THE SPECIFICATIONS. PATCHING SHALL BE OF THE SAME
<br />MEMBRANE CUTTING AND PATCHING SHALL BE PROVIDED UNDER THIS
<br />MEMBER, THE WORK SHALL BE DONE A DIRECTED BY THE ARCHITECT.
<br />PIPES ARE TO PASS THROUGH, OR INTERFERE WITH ANY STRUCTURAL
<br />PATCHING SHALL BE DONE UNDER THE ARCHITECT'S DIRECTION. WHERE
<br />MATERIALS, WORKMANSHIP AND FINISH AS, AND SHALL ACCURATELY
<br />B. ALL PIPING SHALL BE THOROUGHLY CLEANED BEFORE INSTALLATION AND
<br />WILL PERMIT AND SHALL BE COMPLETE AND THE PIPING TESTED BEFORE
<br />A. ROUGH-IN SHALL PROCEED AS RAPIDLY AS THE BUILDING CONSTRUCTION
<br />MATCH, ALL SURROUNDING CONSTRUCTION. ALL CORE DRILLING OR
<br />WHICH MAY BE REQUIRED FOR THE INSTALLATION OF THE W ORK UNDER
<br />SHALL PROVIDE ALL OPENINGS COMPLETE WITH SLEEVES AND SUPPORTS
<br />A. THE CONTRACTOR SHALL DO ALL CORE DRILLING AND PATCHING AND
<br />PREMISES SHALL BE CLEANED OF UNUSED MATERIAL, RUBBISH, DEBRIS,
<br />AND CLEAN, AND ALL PLATED WORK SHALL BE POLISHED. THE ENTIRE
<br />A. ALL EQUIPMENT, PIPING AND EXPOSED SURFACES SHALL BE LEFT SMOOTH
<br />E. HORIZONTAL SANITARY AND DRAIN PIPING SHALL BE RUN AT A UNIFORM
<br />GRADE OF 1/4" PER FOOT, UNLESS OTHERWISE NOTED.
<br />BURRS, EACH LENGTH TO BE CAREFULLY INSPECTED AND ALL
<br />C. ALL JOINTS SHALL BE SMOOTH INSIDE, PIPE ENDS REAMED TO REMOVE
<br />AND SHALL BE PROVIDED WITH NEAT PLATED ESCUTCHEONS WITH ROUND
<br />SHALL BE CAREFULLY MADE; SHALL SHOW NO TOOL MARKS OR THREADS
<br />D. EXPOSED PLATED, POLISHED OR ENAMELED CONNECTIONS FROM FIXTURES
<br />HEAD SCREWS OF THE SAME FINISH. ALL FINISHED SURFACES SHALL BE
<br />ALL PIPE OPENINGS CAPPED TO EXCLUDE DEBRIS UNTIL FIXTURES ARE
<br />OBSTRUCTIONS REMOVED PRIOR TO FABRICATION.
<br />CAREFULLY TAPED.
<br />SECTION OF THE WORK AS DIRECTED BY THE ARCHITECT.
<br />3.3 GENERAL PLUMBING INSTALLATION
<br />BEING ENCLOSED.
<br />3.2 SLEEVING, CUTTING AND PATCHING
<br />GREASE SPOTS.
<br />OF RECORD.
<br />PRESSURE SHALL BE ISOLATED FROM THE SYSTEM.
<br />WORK REPLACED SHALL AGAIN BE TESTED BY THE CONTRACTOR AT HIS OWN
<br />PERFECT MATERIAL AT THE CONTRACTOR'S EXPENSE. THE PORTION OF THE
<br />OF THESE TESTS, IT SHALL BE IMMEDIATELY REMOVED AND REPLACED BY
<br />C. SHOULD ANY PIECE OF APPARATUS, ANY WORK OR MATERIAL FAIL IN ANY
<br />D. ALL EQUIPMENT WHICH WOULD BE SUBJECT TO DAMAGE AT THE TEST
<br />EXPENSE IN THE PRESENCE OF THE INSPECTOR OF RECORD.
<br />E. TESTS:
<br />REFER TO 2022 CPC, SEC 609.9
<br />1. WATER SYSTEMS: INSTALLATION, TESTING AND STERILIZATION SHALL
<br />BE IN ACCORDANCE WITH AWWA C651-92 STANDARDS.
<br />ACCORDANCE WITH 2022 C.P.C. AND I.A.P.M.O. STANDARDS AND
<br />2. WASTE AND VENT SYSTEMS: INSTALLATION AND TESTING SHALL BE IN
<br />RECOMMENDATIONS.
<br />INJECTION PORTS COMPLETE WITH ISOLATION VALVES SHALL BE
<br />INSTALLED FOR CHLORINATION.
<br />*
<br />PART 1: GENERAL PLUMBING SPECIFICATION:
<br />PART 2: PRODUCTS AND MATERIALS:
<br />PART 3: EXECUTION:
<br />5.1 GENERAL
<br />A. SECTION INCLUDES
<br />1.PLUMBING DEMOLITION
<br />2.FIRE SUPPRESSION DEMOLITION
<br />3.CUTTING AND PATCHING
<br />B. SUBMITTAL
<br />1.A DEMOLITION PLAN INDICATING PIPING TO BE DEMOLISHED / REMAIN / REMAIN
<br />OPERATIONAL / CAPPED AND PLUGGED.
<br />5.2 PRODUCTS
<br />A.MATERIALS AND EQUIPMENT
<br />1.MATERIALS AND EQUIPMENT SHALL BE AS SPECIFIED IN INDIVIDUAL SECTIONS.
<br />5.3 EXECUTION
<br />A.EXAMINATION
<br />1.THE DRAWINGS ARE INTENDED TO INDICATE THE GENERAL SCOPE OF WORK AND DO
<br />NOT SHOW EVERY PIPE, DUCT, OR PIECE OF EQUIPMENT THAT MUST BE REMOVED. THE
<br />CONTRACTOR SHALL VISIT THE SITE AND VERIFY CONDITIONS PRIOR TO SUBMITTING A
<br />BID.
<br />2.WHERE WALLS, CEILINGS, ETC., ARE SHOWN AS BEING REMOVED ON ARCHITECTURE
<br />(GENERAL) DRAWINGS, THE CONTRACTOR SHALL REMOVE ALL PLUMBING / FIRE
<br />SUPPRESSION EQUIPMENT, DEVICES, FIXTURES, PIPING, SYSTEMS, ETC., FROM THE
<br />REMOVED AREA.
<br />3.VERIFY THAT ABANDONED UTILITIES SERVE ONLY ABANDONED EQUIPMENT OR
<br />FACILITIES. EXTEND SERVICES TO FACILITIES OR EQUIPMENT THAT SHALL REMAIN IN
<br />OPERATION FOLLOWING DEMOLITION.
<br />4.COORDINATE WORK WITH ALL OTHER CONTRACTORS AND THE OWNER. SCHEDULE
<br />REMOVAL OF EQUIPMENT, FIXTURES AND PIPING TO AVOID CONFLICTS.
<br />5.BID SUBMITTAL SHALL MEAN THE CONTRACTOR HAS VISITED THE PROJECT SITE AND
<br />VERIFIED EXISTING CONDITIONS AND SCOPE OF WORK.
<br />B. PREPARATION
<br />1.DISCONNECT PIPING SYSTEMS IN WALLS, FLOORS, AND CEILINGS SCHEDULED OR
<br />REMOVAL.
<br />2.PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE
<br />DURING CONSTRUCTION, WHEN WORK MUST BE PERFORMED ON OPERATING
<br />EQUIPMENT, USE PERSONNEL EXPERIENCED IN SUCH OPERATIONS.
<br />3.EXISTING PLUMBING, FIRE PROTECTION AND MEDICAL GAS SYSTEM: MAINTAIN
<br />EXISTING TO REMAIN SERVICE UNTIL NEW PIPING IS INSTALLED. OBTAIN PERMISSION
<br />FROM OWNER AT LEAST 48 HOURS BEFORE SHUTTING DOWN SYSTEM FOR ANY
<br />REASON. MAKE CHANGEOVER AND CERTIFY SYSTEM AS PART NEW PIPING, ALL WITH
<br />MINIMUM OUTAGE. DO NOT DISCONNECT ANY ROOF DRAINAGE PIPING UNTIL NEW
<br />PIPING IS IN PLACE AND OPERATIONAL.
<br />C. DEMOLITION AND EXTENSION OF EXISTING MECHANICAL W ORK
<br />1.DEMOLISH AND EXTEND EXISTING PLUMBING WORK UNDER PROVISIONS OF DIVISION 2
<br />AND THIS SECTION.
<br />2.REMOVE, RELOCATE, AND EXTEND EXISTING INSTALLATIONS TO ACCOMMODATE NEW
<br />CONSTRUCTION.
<br />3.REMOVE EXPOSED ABANDONED PIPES, INCLUDING ABANDONED PIPES ABOVE
<br />CEILINGS. CUT PIPES ABOVE CEILINGS, BELOW FLOORS AND BEHIND WALLS. CAP
<br />REMAINING LINES. REPAIR BUILDING CONSTRUCTION TO MATCH ORIGINAL. REMOVE ALL
<br />CLAMPS, HANGERS, SUPPORTS, ETC. ASSOCIATED WITH PIPE REMOVAL.
<br />4.REPAIR ADJACENT CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION AND
<br />EXTENSION WORK.
<br />5.EXTEND EXISTING INSTALLATIONS USING MATERIALS AND METHODS COMPATIBLE
<br />WITH EXISTING INSTALLATIONS, OR AS SPECIFIED.
<br />6.REMOVE UNUSED SECTIONS OF DOMESTIC HOT AND COLD WATER PIPING BACK TO
<br />MAINS AND CAP. CAPPED PIPE SHALL BE LESS THAN 6" FROM MAIN TO PREVENT "DEAD
<br />LEGS".
<br />7.TEMPORARILY CAP ALL OPENINGS TO THE SANITARY AND VENT SYSTEM TO PREVENT
<br />ODOR FROM ENTERING THE WORK ARE AND BUILDING.
<br />D. CUTTING AND PATCHING
<br />1.THIS CONTRACTOR IS RESPONSIBLE FOR ALL PENETRATIONS OF EXISTING
<br />CONSTRUCTION REQUIRED TO COMPLETE THE WORK OF THIS PROJECT. REFER TO
<br />SECTION 22 05 29 FOR ADDITIONAL REQUIREMENTS.
<br />2.NEW PENETRATIONS SHALL BE NEAT AND CLEAN WITH SMOOTH AND/OR FINISHED
<br />EDGES. CORE DRILL WHERE POSSIBLE FOR CLEAN OPENING.
<br />3.REPAIR EXISTING CONSTRUCTION AS REQUIRED AFTER PENETRATION IS COMPETE TO
<br />RESTORE TO ORIGINAL CONDITION. USE SIMILAR MATERIALS AND MATCH ADJACENT
<br />CONSTRUCTION UNLESS OTHERWISE NOTED OR AGREED TO BY THE
<br />ARCHITECT/ENGINEER PRIOR TO START OF WORK.
<br />4.ALL FLOOR SLAB PENETRATIONS SHALL BE X-RAYED PRIOR TO CUTTING AND/OR
<br />DRILLING TO AVOID ANY TENSION CABLES, REINFORCING ROD OR UTILITIES ENCASED IN
<br />FLOOR CONSTRUCTION.
<br />PART 4: DEMOLITION FOR REMODELLING:
<br />END OF SECTION
<br />BETWEEN ARCHITECTURAL AND PLUMBING APPROVED DRAWINGS. CONTRACTOR TO
<br />C. IN EXISTING CONSTRUCTION, PIPE OPENINGS SHALL BE CORE DRILLED AS ALIGNED
<br />IDENTIFY ANY NEARBY REBAR AND CONFIRM THAT THE PROPOSED CORING WILL NOT
<br />COMPROMISE ANY EXISTING REBAR WITH INSPECTOR IN THE FIELD PRIOR TO CORING.
<br />A. THE CONTRACTOR SHALL NOT ALLOW OR CAUSE ANY OF THE WORK TO BE
<br />6. TESTING AND APPROVAL OF ALL SYSTEMS.
<br />4. PLUMBING FIXTURES, FITTINGS, TRIM, ACCESSORIES, ETC.
<br />2. COLD WATER, HOT WATER AND HOT WATER RETURN PIPING SYSTEMS
<br />1. SANITARY SEWER AND VENT SYSTEM INCLUDING CONNECTIONS
<br />INCLUDING CONNECTIONS, TO EXISTING, ETC.
<br />3. CONDENSATE PIPING
<br />5. PIPE INSULATION.
<br />TO EXISTING, ETC.
<br />SPECIFICATIONS
<br />LACINAHCEM AINROFILACFOETATS
<br />M29915
<br />Exp. 06/30/26
<br />REGISTERED PROFESSIONAL
<br />ENGINEER
<br />ROBERT M .OKAJIMA
<br />IMEG RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO
<br />THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAW ING
<br />AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG AND SHALL NOT
<br />BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE
<br />EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG.
<br />©2024 IMEG CONSULTANTS CORP.
<br />REF. SCALE IN INCHES
<br />0 1 2 3
<br />222 S. HARBOR BOULEVARD
<br />SUITE 800
<br />ANAHEIM, CA 92805
<br />P: 714.490.5555 F: 714.490.5560
<br />The FUTURE. Built Smarter www.imegcorp.com
<br />PROJECT #24007312.00
<br />0 5'
<br />GRAPHIC SCALES:
<br />Issue Date
<br />1/16" = 1'-0"
<br />50'
<br />1/8" = 1'-0" 1/4" = 1'-0" 1/2" = 1'-0" 3/4" = 1'-0" 1" = 1'-0" 1-1/2" = 1'-0" 3" = 1'-0"
<br />0 5'25'0 1'12'0 1'6'0 4'0 3'1' 0 2'0 1'
<br />Chckd By
<br />Drwn By
<br />Scale
<br />Building ID:
<br />KP Proj. No.
<br />Permit No.
<br />Sheet
<br />SheetsOf
<br />Sheet Title
<br />Project
<br />Facility
<br />This document is the property of the Owner and is
<br />Project Architect Approval:
<br />Architect/Engineer Of Record:
<br />IF THIS SHEET IS NOT 30"x42" , IT IS
<br />A REDUCED PRINT - SCALE ACCORDINGLY
<br />National Facilities Services
<br />Post Office Box 12916
<br />Oakland California 94604
<br />not to be used without owner's written permission.
<br />Floor Lev: Section:
<br />HGW Proj. No.
<br />©
<br />A
<br />R
<br />C
<br />H
<br />I
<br />T
<br />E
<br />C
<br />T
<br />S
<br />
<br />h
<br />a
<br />n
<br />n
<br />a
<br />
<br />g
<br />a
<br />b
<br />r
<br />i
<br />e
<br />l
<br />
<br />w
<br />e
<br />l
<br />l
<br />s
<br />,
<br />
<br />a
<br />l
<br />l
<br />
<br />r
<br />i
<br />g
<br />h
<br />t
<br />s
<br />
<br />r
<br />e
<br />s
<br />e
<br />r
<br />v
<br />e
<br />d
<br />.
<br />
<br />A
<br />n
<br />y
<br />
<br />u
<br />s
<br />e
<br />
<br />w
<br />i
<br />t
<br />h
<br />o
<br />u
<br />t
<br />
<br />p
<br />e
<br />r
<br />m
<br />i
<br />s
<br />s
<br />i
<br />o
<br />n
<br />
<br />i
<br />s
<br />
<br />e
<br />x
<br />p
<br />r
<br />e
<br />s
<br />s
<br />l
<br />y
<br />
<br />p
<br />r
<br />o
<br />h
<br />i
<br />b
<br />i
<br />t
<br />e
<br />d
<br />.
<br />
<br />P
<br />l
<br />o
<br />t
<br />t
<br />e
<br />d
<br />CAP029271
<br />1955 Bacon Street. San Diego, CA 92107
<br />Office 619 523 8487
<br />www.hgwarchitecture.com
<br />PROJECT #24007312.00
<br />Revisions
<br />By Appr.
<br />12" = 1'-0"
<br />9/
<br />2
<br />5
<br />/
<br />2
<br />0
<br />2
<br />5
<br />
<br />5
<br />:
<br />1
<br />3
<br />:
<br />2
<br />2
<br />
<br />P
<br />M
<br />08/15/2025
<br />Checker
<br />Author
<br />P002
<br />PLUMBING SPECIFICATIONS
<br />3401 South Harbor Boulevard,
<br />Santa Ana, CA 92704
<br />10
<br />0
<br />%
<br />
<br />C
<br />D
<br />
<br />S
<br />E
<br />T
<br />2441
<br />HARBOR-MAC ARTHUR
<br />No. Revisions Date
<br />pl
<br />a
<br />n
<br />
<br />c
<br />h
<br />e
<br />c
<br />k
<br />
<br />s
<br />u
<br />b
<br />m
<br />i
<br />t
<br />t
<br />a
<br />l
<br />09/19/2025
<br />90% CD 08/14/2025
<br />Plan Check Submittal 09/19/2025
<br />pl
<br />a
<br />n
<br />
<br />c
<br />h
<br />e
<br />c
<br />k
<br />
<br />r
<br />e
<br />s
<br />u
<br />b
<br />m
<br />i
<br />t
<br />t
<br />a
<br />l
<br />Plan Check Resubmittal 02/25/2026
<br />02/25/2026
|