<br />Rev: 07/16//2019 Page 2 of 2 <br />Compliance with the California Electrical Code: <br /> <br />A. Does the plan include EVCS manufacturer's specs and installation guidelines? Y N <br />B. Does the electrical plan identify the amperage and location of existing electrical <br />service panel? Y N <br />1) If yes, does the existing panel schedule show room for additional breakers? Y N <br />C. Is the charging unit rated more than 60 amps or more than 150V to ground? Y N <br />1) If yes, are disconnecting means provided in a readily accessible location in line of <br />site? (CEC 625.43) Y N <br />D. Does the charging equipment have a Nationally Recognized Testing Laboratory <br />(NRTL) approved listing mark? (UL 2202/UL 2200) Y N <br />E. If trenching is required, is the trenching detail called out? Y N <br />1) Is the trenching in compliance with minimum cover requirements for wiring <br />methods or circuits? (18” for direct burial per CEC 300.5) Y N <br /> <br />Compliance with California Green Building Standards Code: <br /> <br />A. Do the CAL Green EV Readiness installation requirements apply to this project: Y N <br />1) Do the plans demonstrate conformance with mandatory measures for 10% of total <br />parking spaces, for new multifamily dwellings provided for all types of parking <br />facilities, to be electric vehicle charging spaces (EV spaces) capable of <br />supporting future EVCS? (4.106.4.2) <br /> <br />Y <br /> <br />N <br />2) Do the construction documents indicate the location of the proposed EV spaces <br />where at least one is located in common use areas and available to all residents <br />for use? (4.106.4.2.1) Calculations for the required number of EV spaces shall be <br />rounded up to the nearest whole number. <br /> <br />Y <br /> <br />N <br />3) When EV chargers are installed, EV spaces required by Section 4.106.4.2.2, item 3 <br />shall comply with at least one of the following options: <br />a. The EV space shall be located adjacent to an accessible parking space <br />that complies with CBC Chapter 11A, to allow use of the EV charger from <br />the accessible parking space. <br />b. The EV space shall be located on an accessible route, as defined by CBC <br />Chapter 2, to the building. <br />c. EV charging space(s) comply with Section 4.106.4.2.2, items 1, 2 and 3. <br /> <br /> <br /> Y <br /> <br /> <br /> <br /> N <br /> <br />Notes: This criteria is intended for an expedited EVCS permitting process. If any items are checked NO, <br />please revise plans to fit within the eligibility checklist; otherwise the permit application may go <br />through the standard plan review and approval process. <br /> <br />Electrical plans shall be completed, stamped and signed by a California Licensed Electrical Engineer <br />or a C-10 electrical contractor. <br /> <br />EVCS project review is limited to health and safety requirements found under local, state, and federal <br />law. EVCS permit approval is not subject to approval of an association (as defined in Section 4080 of <br />the Civil Code). <br /> <br />Project Address: <br />Applicant Signature: <br />Applicants Printed Name: <br /> <br />Contractor’s License Number and type: - <br />2525 North Grand Ave <br />Aaron Wallen