FOUNDATION NOTES <br />1. SEE SPECIFICATIONS ON SHEET SD-1 FOR ADDITIONAL INFORMATION. <br />2. BUILDING PAD SOIL BEARING VALUE SHOULD BE AT LEAST 1500 PSF <br />3. CEMENT USED IN FOUNDATIONS SHALL BE TYPE II UNLESS OTHERWISE REQUIRED <br />BY THE SOIL ENGINEER. <br />4. THE FLOOR SLAB SHALL BE POURED LEVEL TO WITHIN 1 /8 INCH IN 10 FEET. <br />5. THE FLOOR SLAB AND FOUNDATION MAY BE POURED HOMOGENEOUSLY (AT THE <br />SAME TIME) OR IN TWO POURS, WITH A COLD JOINT BETWEEN THE SLAB AND FOUNDATION, <br />AT THE CONTRACTORS DISCRESSION. THE DETAILS DRAWN GENERALLY SHOW TWO POURS. <br />6. ANCHOR BOLTS: AT ALL EXTERIOR WALLS, INSTALL A 5/8" DIA. ANC. BOLTS @ 48" O.C. <br />WITH MINIMUM EMBEDMENT OF 7 INCHES INTO CONCRETE (U.N.O. ON SHEAR WALL SCHED.) <br />INCLUDING AT LEATST ONE WITHIN A MAXIMUM OF 12" FROM EACH END. PLATES SMALLER <br />THAN 24" IN LENGTH, SHALL BE PROVIDED WITH AT LEAST TWO ANC. BOLTS UNLESS <br />OTHERWISE INDICATED ON PLANS. PROVIDE ALL EXTERIOR WALLS AS INDICATED ON PLANS. <br />SEE FLOOR FRAMING PLAN FOR REFERENCE IN PROVIDING AN EXTENSION OF ANCHOR BOLTS <br />ABOVE CONCRETE. HARDWARE SHALL BE TIED INPLACE PRIOR TO PLACEMENT OF CONCRETE. <br />7. ANY PENETRATIONS INTO PRESSURE TREATED WOOD MUST BE GALVANIZED, STAINLESS <br />STEEL, SILICON BRONZE OR COPPER NAILS. <br />8. FOUNDATION SILL PLATE SHALL BE TREATED LUMBER OR FOUNDATION RED WOOD. <br />9. REFER TO ARCH. DWG. FOR TOP -OF -SLAB ELEVATIONS. <br />10. NEW / EXISTING OR DEMO STUD WALLS NEED TO BE VERIFIED WITH ARCH. DRAWINGS. <br />11. ALL HOLDOWNS ANCHOR BOLTS AND STRAPS MUST BE TIED IN PLACE PRIOR TO FOUNDATION <br />INSPECTION AND POURING CONCRETE. <br />12. ALL BOLT SIZES SHALL BE DRILLED 1 /32" TO 1 /16" OVERSIZED. <br />13. SHOT PINS: AT ALL INTERIOR, NON BEARING, NON SHEAR WALLS AND PARTITIONS, INSTALL <br />A 0.145" DIA. X 2.875" LONG, SHANK AND METAL PLATE WASHER AT 36" O.C. ADDING ONE <br />AT EACH END. PLATES SMALLER THAN 16" IN LENGTH SHALL HAVE A MINIMUM OF TWO FASTENERS, <br />ONE AT EACH END. PLATES 16" OR LONGER AND INDICATED AS SHEAR WALLS, PLACE TWO <br />ADDITIONAL FASTENERS, ONE AT 6" AND ANOTHER AT 10" FROM EACH END. <br />14. COORDINATE AND VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS. <br />ALL BOLT HOLES SHALL BE DRILLED 1 /32" TO 1 /16" OVERSIZED. <br />CONTINUOUS INSPECTION BY A DEPUTY <br />INSPECTOR IS REQUIRED FOR EPDXY ANCHORS. <br />CONTINUOUS INSPECTION BY A DEPUTY <br />INSPECTOR REQUIRED FOR INSTALLATION OF <br />HARDY FRAME HOLDWON ANCHOR BOLTS. <br />CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION <br />OF A MAIN WIND- OR SEISMIC FORCE RESISTING SYSTEM/ <br />COMPONENT LISTED IN THE STATEMENT OF SPECIAL <br />BOLT SIZE I MINIMUM PLATE WASHER SIZE <br />5/8" 0.229" x 3" x 3" <br />3/4" 5/16" x 3" x 3" <br />7/8" 5/ 16" x 3" x 3" <br />1" I 3/8" x 3 1 /2" x 3 1 /2" <br />SLOTTING OF WASHER IS ALLOWED TO BE 1.75" LONG. <br />PAD FOOTING SCHEDULE <br />NO. <br />SIZE <br />THICKNESS <br />REINFORCEMENT <br />EAC H WAY <br />PF1 <br />2'-0" <br />SQ. <br />2'-0" <br />(3)-#4, <br />BOTTOM <br />PF2 <br />2'-6" <br />SQ. <br />2'-0" <br />(4)-#4, <br />BOTTOM <br />PF3 <br />3'-0" <br />SQ. <br />2'-0" <br />(3)-#5, <br />BOTTOM <br />PF4 <br />4'-0" <br />SQ. <br />2'-0" <br />(4)-#5, <br />BOTTOM <br />PF5 <br />5'-0" <br />SQ. <br />2'-0" <br />(5)-#5, <br />BOTTOM <br />PF6 <br />6'-0" <br />SQ. <br />2'-0" <br />(6)-#5, <br />BOTTOM <br />FRAMING NOTES <br />INSPECTIONS SHALL SUBMIT A WRITTEN STATEMENT <br />RESPONSIBILITY TO THE LADBS INSPECTORS AND THE <br />1• <br />REFER TO STRUCTURAL GENERAL NOTES SHEET <br />OWNER PRIOR TO THE COMMENCEMENT OF WORK <br />SD1 FOR MORE INFORMATION. <br />ON SUCH SYSTEM OR COMPONENT. <br />2. <br />MULTIPLE ELEMENT MEMBERS (i.e. DBL JOISTS, <br />DBL STUDS, etc.) SHALL BE NAILED TOGETHER <br />THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL <br />W/ 16d's @ 16" O.C. STAGGERED. BEAMS <br />CONTAIN ACKNOWLEDGEMENT OF AWARENESS OF THE SPECIAL <br />COMPOSED OF MULTIPLE PIECES (4X OR LARGER) <br />REQUIREMENT CONTAINED IN THE STATEMENT OF SPECIAL <br />SHALL BE BOLTED TOGETHER W/ 1/2"0 M.B.'S <br />INSPETIONS. <br />@ 12" O/C., STAG'D. <br />NAILS FOR PRESERVATIVE -TREATED WOOD SHALL BE <br />3• <br />WALL STUDS: <br />HOT -DIP GALVANIZED <br />1) <br />EXTERIOR WALLS: <br />HOLD-DOWN CONNECTOR BOLTS INTO WOOD FRAMING <br />a) 1ST FLR. OF 3-STORY BL <br />3X4 DFL-#2 OR 2X6 STUDSS @ @ 16" 0/C. <br />REQUIRE APPROVED PLATE WASHERS; AND HOLD-DOWNS <br />b) 1ST FLR OF 2-STORY BLD'GS AND <br />SHALL BE FINGER TIGHT AND 1 /2 WRENCH TURN JUST <br />2ND FLR OF 3-STORY BLD'GS: <br />PRIOR TO COVERING THE WALL FRAMING. CONNECTOR <br />2x4 DFL-#2 STUDS @ 16" 0/C. <br />BOLTS INTO WOOD FRAMING REQUIRE STEEL PLATE <br />c) OTHER CASES: SHALL BE 2X4 MIN. DFL STUD <br />WASHERS ON THE POST ON THE OPPOSITE SIDE OF THE <br />GRADE OR BETTER STUDS @ 16" 0/C. FOR 4" <br />ANCHORAGE DEVICE. PLATE SIZE SHALL BE A MIN. OF <br />WALLS & 2X6 MIN. DFL STUD GRADE OR BETTER <br />STUDS @ 16" 0/C. FOR 6" WALLS, U.N.O. <br />0.299"X3"X3". <br />d) ALL OUTSIDE WALL OF EXTERIOR WALL <br />HOLD-DOWN HARDWARE MUST BE SECURED IN PLACE <br />ARE BEARING WALL (U.N.O.) <br />PRIOR TO FOUNDATION INSPECTION. <br />2) <br />INTERIOR WALLS: <br />FASTENERS FOR PRESERVATIVE -TREATED OR FIRE -RETREATED <br />a) ALL INTERIOR SHEAR/ BEARING WALLS SHALL <br />BE 2X4 MIN. STUD GRADE OR BETTER STUDS @ 16" <br />WOOD SHALL BE OF HOT DIPPED ZINC -COATED GALVANIZED <br />0/C. FOR 4" WALLS & 2X6 MIN. DFL STUD GRADE <br />STEEL IN ACCORDANCE WITH ASTM A 153. <br />OR BETTER STUDS @ 16" 0/C. FOR 6" WALLS, <br />ALL EXTERIOR AND WOOD FRAMED HIMNEYS MUST <br />b) ALL INTERIOR NON -BEARING/ NON -SHEAR WALL <br />BE SHEATHED WITH SHEAR PANEL 1 (U.N.O.). <br />SHALL BE 2X4 STUD GRADE OR BETTER STUDS <br />@ MAX. 24" 0/C. U.N.O. <br />1 /8" GAP AT ALL PLYWOOD PANEL EDGES REQUIRED. <br />4. <br />U.N.O. PROVIDE SOLID BLOCKING OR DBL. JOIST <br />CONTINUOUS INSPECTION BY DEPUTY <br />UNDER ALL WALLS ABOVE. <br />INSPECTOR IS REQUIRED FOR ALL CONCRETE <br />DESIGNED WITH STRENGTH GREATER THAN <br />5. <br />WHERE HANGERS ARE NEEDED, WHETHER <br />2,500 PSI. <br />INDICATED ON PLAN OR NOT, U.N.O., USE "U" OR <br />"LB" "HU" <br />HANGERS FOR JOSTS/RAFTERS, & OR <br />[INSPECTOR TO VERIFY] BOTL HOLES SHALL BE <br />"HW" HANGERS FOR BEAMS OR MULTIPLE JOISTS. <br />MAX. 1 /16" OVERSIZED. <br />6. <br />WHERE SHEAR WALLS ARE THRU WALLS AS <br />MIN. 2x6 WALL STUD FRAMING AT PLUMBING WALLS <br />INDICATED ON PLANS, SHEAR MATERIAL SHALL <br />TO ACCOMMODATE DRILLING AND NOTCHING OF STUDS. <br />BE CONT. THRU WALLS. <br />7. <br />ALL POSTS/MULTIPLE STUDS IN WALLS SHALL <br />[FOR THE LOCATION OF PLUMBING WALLS, SEE ARCH PLAN] <br />RECEIVE EDGE NAILING FROM WALL SHEATHING. <br />ALL BM'S, DRAGS GIRDER TRUSSES SHALL <br />PERIODIC SPECIAL INSPECTION IS REQUIRED FOR WOOD <br />RECEIVE BOUDARY NAILING FROM SHEATHING. <br />SHEAR WALLS, SHEAR PANELS, AND DIAPHRAGMS, <br />8. <br />CONTRACTOR SHALL VERIFY EXACT HEIGHT AND <br />INCLUDING NAILING, BOLTING, ANCHORING, AND OTHER <br />LOCATION OF HARDY FRAME OR STRONG WALL. <br />FASTENING TO COMPONENTS OF THE SEISMIC FORCE <br />9. <br />FURR CEILINGS TO CONCEAL VALLEY OR HIP <br />RESISTING SYSTEM. SPECIAL INSPECTION BY A DEPUTY <br />THAT ARE BELOW TOP PLATE LINE <br />INSPECTOR IS REQUIRED WHERE THE FASTENER SPACING <br />10. <br />FURR ALL WALLS AS REQ'D IF SHEAR WALL DOES NOT <br />OF THE SHEATHING IS 4" O.C. OR LESS. <br />COVER ENTIRE WALL TO WALLS FLUSH <br />FOUNDATION SILLS SHALL BE NATURALLY DURABLE OR <br />11. <br />SHEAR WALLS ARE TO ROOF SHEATHING <br />PRESERVATIVE -TREATED WOOD. <br />12. <br />WHERE TOP PLATES OR SOLE PLATES ARE CUT FOR <br />PIPES, A METAL TIE MINIMUM 0.058" THICK AND 1 1/� <br />IF ADVERSE SOIL CONDITIONS ARE ENCOUNTERED, A <br />WIDE SHALL BE FASTENED TO EACH PLATE ACROSS <br />SOIL INVESTIGATION REPORT MAY BE REQUIRED. <br />AND TO EACH SIDE OF THE OPENING WITH NOT <br />LESS THAN 6-16d NAILS. <br />MINIMUM ANCHOR BOLTS WITH A MINIMUM 7" EMBEDMENT. <br />13. <br />WOOD FRAMING MEMBERS, INCLUDING WOOD SHEATHIN( <br />THAT REST ON EXTERIOR FOUNDATION WALLS AND <br />AT LEAST TWO (2) ANCHOR BOLTS PER PLATE WITH A <br />ARE LESS THAN 8 INCHES FROM EXPOSED EARTH <br />MINIMUM 7-BOLT DISTANCE FROM THE END OF THE SILL <br />SHALL BE OF PRESERVATIVE -TREATED WOOD. <br />PLATE, BUT NOT MORE THAN 12". <br />14. <br />COORDINATE AND VERIFY ALL DIMENSIONS WITH <br />ARCHITECTURAL DRAWINGS. <br />55. ROOF DIAPHRAGM NAILING TO BE INSPECTED BEFORE <br />COVERING, FACE GRAIN OF PLYWOOD SHALL BE <br />PERPENDICULAR TO SUPPORTS. FLOOR SHALL HAVE <br />TONGUE AND GROOVE OR BLOCKED PANEL EDGES. <br />PLYWOOD SPANS SHALL CONFORM WITH TABLE 2304.7. <br />16. ROOF DIAPHRAGM USE 1 /2" CDX (P.I. 32/16) NAIL W, <br />8d @ 6" O.C. EDGE (BLOCKED) AND 8d @ 12" O.C. <br />FIELD & MST37 PER CHORD SPLICE. <br />17. SHEAR WALLS SHALL RUN CONTINUOUSLY FROM <br />FOUNDATION TO ROOF FRAMING. <br />18. ALL DIAPHRAGM AND SHEAR WALL NAILING SHALL <br />UTILIZE COMMON NAILS OR GALVANIZED BOX. <br />CODE REFERENCE NUMBER (SIMPSON HARDWARE) <br />HARDWARE ICC-ES ESRR# IAPMO UES ER# <br />A34, A35, LPT5 J096 112 <br />LPT4 J096 172 <br />GH46, GH48 2616 -- <br />MSTA, MSTC, FHA, <br />LSTA, ST,, MST, <br />2105 <br />-- <br />CMST, CS <br />HU, HUC, L U, U <br />2549 <br />- - <br />HGU, HHGU, <br />MGU, LGU <br />2552 <br />-- <br />PSL, L IV, LSL <br />I J87 <br />HDU, HDOB <br />HHDO, DTT <br />25828 <br />HD, HDB <br />- - <br />143 <br />EPCZ, ECCO <br />ECC, EC <br />2604 <br />- - <br />HRRC <br />2551 <br />LTS <br />2615 <br />ROOF DIAPHRAGM <br />1 /2" CDX (P.I. 32/16) NAIL <br />VU/ 8d @ 6" O.C. EDGE (UNBLOCKED) <br />AND 8d @ 12" O.C. FIELD <br />& MST37 PER CHORD SPLICE. (ONLY <br />DBL. TOP SPLICE AT THE SAME LOCATION) <br />ROOF AND CEILING FRAMING PLAN <br />L- <br />� -v-v-v <br />> <br />MST48 <br />MST48 <br />SYMBOLS & LEGENDS <br />NEW WALL <br />1 <br />10.25 SHEAR PANEL SCHEDULE & LENGTH <br />SIMPSON HOLDOWNS <br />DIRECTION, SPAN OF 2x8 @ 16" O.C. (U.N.O.) <br />ROOF RAFTER (R.R.) <br />DIRECTION, SPAN OF 2x8 16" O.C. (U.N.O.) <br />R v CEILING JOIST (C.J.) <br />EXISTING ROOF LAYOUT <br />\ DIRECTION, SPAN OF EXISTING ROOF RAFTER (EX. R.R.) <br />CONTRACTOR NOTE: <br />1. CONTRACTOR TO VERIFY ALL EXISTING <br />FRAMING/CONDITIONS AND NOTIFY THE <br />ENGINEER OF ANY DISCREPANCIES <br />IMMEDIATELY PRIOR TO COMMENCING ANY <br />WORK. <br />2. PLYWOOD OF SHEAR WALL CAN BE INSTALLED <br />ON EITHER SIDE OF WALL. <br />CITY OF SANTA ANA <br />ANnning and Building Agenc <br />4x4/ 4x6/ 6x6 POSTS (U.N.O.) <br />S2.2 <br />DETAIL KEYS <br />SHEAR PANEL - PLYWD. ON 0 E SIDE <br />I- NEW FOOTING <br />A pproved <br />R PERMIT ISSUANCE <br />I I CONCRETE SLAB ON GRADE Ma ter ID: <br />I_ <br />NEW ROOF LAYOUT Da e: <br />MST 37 _ SIMPSON DRAG STRAP <br />AHJ STAMP APPROVAL <br />r EXISTING FOOTING TO BE REMAINED <br />L__ __J <br />BEARING WALL <br />2x4 MIN. @ 16" O.C. <br />DFL NO.2 (U.N.O.) <br />EXTERIOR WALL <br />2x4 MIN. @ 16" O.C. <br />DFL NO.2 (U.N.O.) <br />FOUNDATION PLAN <br />21 <br />> 1 <br />IFCENGIN ENGINEERING. Na <br />CONSULTING ENGINEERS <br />STRUCTURAL DESIGN <br />1822 E Route 66, Suite 328 <br />Glendora, CA 91740 <br />Office: (818) 814-8268 <br />Email: ifcengineeringca@gmail.com <br />THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND <br />CONDITIONS OF THE JOB PRIOR TO STARTING <br />CONSTRUCTION, AND THE ARCHITECT/ DESIGNER/ <br />ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY <br />DISCREPANCIES INCONSISTENCIES. CHECK WITH <br />ARCHITECT FOR ACTUAL DIMENSIONS. <br />THIS DRAWINGS, DOCUMENTS, DESIGNED ARE THE <br />PROPERTY AND COPYRIGHTS OF IFC ENGINEERING. <br />THOSE ARE FOR USE ON THE SPECIFIED PROJECT, AND <br />NO PART THEREOF SHALL BE COPIED OR DISCLOSED TO <br />OTHERS WITHOUT WRITTEN PERMISSION FROM IFC <br />ENGINEERING. <br />QROVESS/ON9 <br />14C.Wpy�lF� <br />Flo. C69393 <br />W Ex 06/30/2026� <br />v <br />9T CIVIC ��Q <br />\or CAL�F�� <br />Stamp: <br />Residential Project for: <br />PRIVATE <br />RESIDENCE <br />1519 PARK DRIVE <br />SANTA ANA, CA 92707 <br />Project: <br />STRUCTURAL <br />FRAMING <br />PLAN <br />Drawing Title: <br />PLAN CHECK <br />PCC1 02-08-2026 <br />Revisions: Date <br />Date: 11-22-2025 <br />Scale: 1 /4"= V-0" <br />Drawn By: IFC <br />Job Number: 1102015A <br />S1 <br />