3033 S. Harbor Blvd.
<br />Santa Ana, CA 92704
<br />P: 714-427-0501
<br />F: 714-427-0502
<br />www.inspection-resources.com
<br />INSPECION
<br />RESOURCES
<br />i jrpift= 1. NOn¢„tructty- Te.tono
<br />GPR / Cover Meter Results
<br />Project: 888 N. Main St. Santa Ana, CA
<br />6/29/2018 - 07/03/2018
<br />Area Line Inches Between Vertical Bars
<br />Mezzanine Column 4
<br />Column 5
<br />Column 6
<br />Column 7
<br />Column 9
<br />Floor 3 West Low Beam @ Col 11
<br />West Low Beam @ Col 7
<br />North Low Beam @ Col 3
<br />West Col 11
<br />North Col 3
<br />North High Beam @ Col 1
<br />North High Beam @ Col 3
<br />GPR DETECTED 3 TARGETS IN BOTTOM OF BEAMS
<br />GPR DETECTED 2 TARGETS IN BOTTOM OF GIRDERS
<br />Girders = 20" thickness
<br />Beams = 12" thickness
<br />Chip location/Mesh Pattern Area
<br />Vertical - Start edge, 3,5,3,4,5,3, end
<br />Horizontal - Start bottom bar, 8,5,5,5,5,4,6, end
<br />Vertical - Start edge, 3,5,5,5,5,3, end
<br />Horizontal - Start bottom bar, 8,5,3,4,6,3,7, end
<br />Chip location/Mesh Pattern Area
<br />Vertical - Start Edge 2,7,5,7,3, end
<br />Horizontal - Start bottom bar, 9,4,5,5,4,4,8, end
<br />Vertical - Start Inside window, 8,24,9, end
<br />Horizontal - Start Floor, 18, 11, 6, end @ window
<br />Vertical - Start inside window, 11, 21, 10, end
<br />Horizontal - Start floor, 17, 14, 8, end @ window
<br />Vertical - Start inside window, 10, 24, 8, end
<br />Horizontal - Start Floor, 6, 14, 12, 5, end
<br />Vertical - Start left window edge, 2 10, 8, 3, end
<br />Horizontal - Start floor, 4, 8, 4, 3, 4, 7, 15, 18, 18, end
<br />Vertical - Start left window edge, 2,4,9,7,3, end
<br />Horizontal - Start floor, 8,6,5,5,9,8,18,17, end
<br />Vertical - Start wall, 18, 8, 14, 18, 18, end
<br />Vertical - Start wall, 18, 8, 7, 7, 13, 5, 11, 7, end
<br />Horizontal - Start roof, 9,6,6,6, eqd
<br />Vertical - Start framing, 10,21, 17, end
<br />Vertical - Start framing, 5, 5, 11, 10, 10,7, end
<br />Single horizontal bar middle of beam
|