3033 S. Harbor Blvd.
<br />Santa Ana, CA 92704
<br />P: 714-427-0501
<br />F: 714-427-0502
<br />www.inspection-resources.com
<br />INSPECTION
<br />RESOURCES
<br />-111-/t- In Nondeltructtle Veltlng
<br />GPR / Cover Meter Results
<br />Project: 888 N. Main St. Santa Ana, CA
<br />6/29/2018 - 07/03/2018
<br />Area Line Inches Between Vertical Bars
<br />Floor 5
<br />West Low Beam @ Col 7 Vertical - Start inside window right, 13, 17, 11, end
<br />Horizontal - Start floor, 6, 12, 13, 2, 3, end
<br />West Col 7 Vertical - Start left, 3,11,7,4, end
<br />Horizontal, Start floor, 6, 6, 7, 6, 7, 10, 17, 17, end
<br />West Low Beam @ Col 11 Vertical - Start inside window left, 14, 16, 13, end
<br />Horizontal - Start floor, 17, 14, 4, end
<br />West Col 11 Vertical - Start left, 4,11,8,2, end
<br />Horizontal - Start floor, 6, 6, 4, 8, 5, 7, 11, 18, 18, end
<br />North Low Beam @ Col 4 Vertical - Start framing, 11, 18, 13, end
<br />Horizontal - Start floor, 18, 11, 5, 3, end
<br />North Col 4
<br />Floor 8
<br />Vertical - Start Left, 3, 11,8,4, end
<br />Horizontal - Start floor, 5, 8, 8, 5, 5, 4, 8, 20, 16, end
<br />West Low Beam @ Col 7 Vertical - Start Inside window left, 15, 17, 8, end
<br />Horizontal - Start floor, 6, 13, 13, end
<br />West Low Beam @ Col 11 Vertical - Start Inside window left, 13, 18, 9, end
<br />Horizontal - Start floor, 17, 14, 5, end
<br />West Col 11 Vertical - Start Left, 3, 11, 8,4, end
<br />Horizontal - Start floor, 8, 4, 5, 8, 7, 11, 15, 18, end
<br />North Low Beam @ Col 4 Vertical - Start inside window left, 13, 15, 13, end
<br />Horizontal - Start floor, 18, 14, 5, end
<br />North Col 4 Vertical - Start left, 3,11,8,3, end
<br />Horizontal - Start floor, 6, 6, 6, 6, 8, 11, 16, 16, end
<br />GPR DETECTED 3 TARGETS IN BOTTOM OF BEAMS
<br />GPR DETECTED 2 TARGETS IN BOTTOM OF GIRDERS
<br />Girders = 20" thickness
<br />Beams = 12" thickness
|