Laserfiche WebLink
THE DOT PRINTER <br />2525 Pullman Street <br />Santa Ana, CA <br />THE DOT PRINTER <br />12/2/2025 <br />reference <br />G-1 <br /> According To 2022 CBC <br />Note: Conditions of adhering to this plan are the sole responsibility of the <br />Owner/Tenant. If modifications to the building are conducted it is the Owner/Tenant's <br />responsibility to obtain a licensed contractor to perform such work along with any <br />necessary plan submittals to the local agencies for approval of permits. <br />71 <br />4 <br />- <br />5 <br />7 <br />2 <br />- <br />4 <br />4 <br />1 <br />0 <br />co <br />m <br />p <br />l <br />y <br />@ <br />c <br />o <br />m <br />p <br />l <br />i <br />a <br />n <br />c <br />e <br />f <br />i <br />r <br />s <br />t <br />. <br />c <br />o <br />m <br />10 <br />5 <br />7 <br /> <br />E <br />. <br /> <br />I <br />m <br />p <br />e <br />r <br />i <br />a <br />l <br /> <br />H <br />w <br />y <br />. <br />Pl <br />a <br />c <br />e <br />n <br />t <br />i <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />8 <br />7 <br />0 <br />Co <br />m <br />p <br />l <br />i <br />a <br />n <br />c <br />e <br /> <br />F <br />i <br />r <br />s <br />t <br />, <br /> <br />I <br />n <br />c <br />. <br />Co <br />v <br />e <br />r <br /> <br />S <br />h <br />e <br />e <br />t <br />/ <br />S <br />i <br />t <br />e <br /> <br />P <br />l <br />a <br />n <br />SITE MAP <br />ACCORDING TO 2022 CBC <br />VICINITY MAP <br />SITE PLAN <br /> Project Scope: Rack Storage Permitting <br /> Project Information Sheet Index <br />Building Information Code Information <br />APPLICABLE CODES: ALL WORK DONE UNDER THIS CONTRACT SHALL <br />COMPLY WITH THE PROVISIONS OF THE SPECIFICATIONS, DRAWINGS & <br />CONSTRUCTION CRITERIA OF THE OWNER, AND SHALL SATISFY ALL <br />APPLICABLE CODES, ORDINANCES, AND REGULATIONS OF ALL GOVERNING <br />BODIES INVOLVED. ANY MODIFICATIONS TO THE CONTRACT WORK REQUIRED <br />Y SUCH AUTHORITIES SHALLBE PERFORMED BY THE CONTRACTOR. ALL <br />PERMITS AND LICENSES NECESSARY FOR THE EXECUTION OF THE WORK <br />SHALL BE SECURED AND PAID FOR BY THE CONTRACTOR. APPLICABLE <br />CODES INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: <br />APPLICABLE CODES MAY/MAY NOT BE AS FOLLOWS: <br />* 2022 CBC BUILDING AND SAFETY CODE <br />* 2022 CALIFORNIA ELECTRICAL CODE <br />* 2022 CMC MECHANICAL CODE <br />* 2022 CPC PLUMBING CODE <br />* 2022 CFC FIRE CODE <br />* CALIFORNIA TITLE 24 ENERGY COMPLIANCE CODES AMERICANS WITH <br />DISABILITIES ACT <br />Jurisdiction: City of Santa Ana <br />A. Occupancy Use: S-I, B <br />B. Construction Type: III-B <br />C. Existing Automatic Sprinklered Building <br />THE DOT PRINTER <br />2525 Pullman Street, Santa Ana, CA <br />N <br />N <br />GI- Cover Sheet/Site Plan <br />G2- Rack Storage Floor Plan <br />SED 1 of 1- Storage Rack Elevations <br />Fire Code: <br />Fire Code Consultant <br />COMPLIANCE FIRST, INC. <br />1057 E Imperial Hwy <br />Placentia, California 714-572-4410 <br />Structural Engineering & Design Inc.: <br />STRUCTURAL ENGINEERING & DESIGN INC. <br />1815 Wright Ave. <br />La Verne, California 909-596-1351 <br />THE DOT PRINTER <br />2525 Pullman Street <br />Santa Ana, CA <br />Fire Department Access Road <br />BA <br />K <br />E <br />R <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />Fi <br />r <br />e <br /> <br />D <br />e <br />p <br />a <br />r <br />t <br />m <br />e <br />n <br />t <br /> <br />A <br />c <br />c <br />e <br />s <br />s <br /> <br />R <br />o <br />a <br />d <br />RISERS WITH <br />ALARM VALVES RISER WITH <br />ALARM VALVEExisting Domestic <br />Water Service <br />Existing Backflow <br />Service <br />12/2/25 <br />(6)6,2 251$3 /'((15*(7 ,16,(*((55 <br />$&/),)2 2(571$,7 $6 9 ,,/& <br />((55 <br />$&/),)2 2(555555555555555555555555555555555555555555555555555555555777777777777777777777777777777777777777777777777111111111111111111111111111111111111111111111111111111111$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$7 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,7$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$$66666666666666666666666666666666666666666666666 <br />1R1R <br />(([S[S7 <br />THE P.E. CERTIFICATION PROVIDED HEREIN PERTAINS <br />TO THE ADEQUACY OF THE STORAGE RACK <br />STRUCTURAL COMPONENTS ONLY. ALL <br />OTHER AREAS ARE OUTSIDE THE SCOPE OF <br />WORK OF THIS CERTIFICATION. .