<br />SITE PLAN KEYNOTES
<br />01 (E.) STREET PUBLIC ACCESSIBLE
<br />RAMP W./ TRUNCATED DOME
<br />NO CHANGE.
<br />02
<br />03
<br />(E.) STREET CURB NO CHANGE.
<br />04
<br />(E.) PUBLIC PARKING TYP. .
<br />05 (E.) DESIGNATED PARKING SIGN
<br />06
<br />07 (E.) ACCESSIBILITY PARKING
<br />4 09 (E.) 4" WIDE BLUE PAINTED STRIPING
<br />10 (E.) 12" HIGH WHITE PAINTED LETTERING
<br />11
<br />08 (E.) ACCESSIBILITY SYMBOL
<br />(E.) CENTERLINE OF STREET
<br />(E.) CONCRETE WHEEL STOP
<br />3 (E.) TOW AWAY SIGN
<br />THE STATE MANDATED CONSTRUCTION & DEMOLITION RECYCLING PLAN (CDRP).
<br />-A MINIMUM OF 65 PERCENT OF THE NONHAZARDOUS CONSTRUCTION AND DEMOLITION WASTE SHALL BE
<br />RECYCLE AND/OR SALVAGE FOR REUSE IN ACCORDANCE WITH CALIFORNIA GREEN BUILDING STANDARD CODE.
<br />DEMO AND CONSTRUCTION PHASE.
<br />-DUMPSTER, ROLL-OFFS, CONSTRUCTION MATERIAL/SUPPLIES AND DEBRIS SHALL BE COVERED IF STORE
<br />OUTDOOR.
<br />A4
<br />A4
<br />6
<br />A4
<br />16
<br />4
<br />1
<br />
<br />E
<br />
<br />1
<br />7
<br />t
<br />h
<br />
<br />S
<br />t
<br />r
<br />e
<br />e
<br />t
<br />
<br />#
<br />A
<br />,
<br />
<br />S
<br />a
<br />n
<br />t
<br />a
<br />
<br />A
<br />n
<br />a
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />5
<br />De
<br />s
<br />i
<br />g
<br />n
<br />10
<br />4
<br />9
<br />2
<br />
<br />T
<br />R
<br />A
<br />S
<br />K
<br />
<br />A
<br />V
<br />E
<br />,
<br />
<br />U
<br />N
<br />I
<br />T
<br />
<br />B
<br />Ga
<br />r
<br />d
<br />e
<br />n
<br />
<br />G
<br />r
<br />o
<br />v
<br />e
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />8
<br />4
<br />3
<br />Ph
<br />o
<br />n
<br />e
<br />:
<br />
<br />(
<br />7
<br />1
<br />4
<br />)
<br />4
<br />1
<br />7
<br />-
<br />1
<br />8
<br />3
<br />9
<br />
<br />-
<br />
<br />(
<br />6
<br />5
<br />7
<br />)
<br />7
<br />2
<br />0
<br />-
<br />8
<br />5
<br />5
<br />5
<br />ki
<br />m
<br />k
<br />h
<br />u
<br />e
<br />.
<br />n
<br />g
<br />u
<br />y
<br />e
<br />n
<br />2
<br />0
<br />1
<br />8
<br />@
<br />g
<br />m
<br />a
<br />i
<br />l
<br />.
<br />c
<br />o
<br />m
<br />ar
<br />t
<br />.
<br />d
<br />e
<br />s
<br />i
<br />g
<br />n
<br />.
<br />g
<br />r
<br />o
<br />u
<br />p
<br />2
<br />0
<br />2
<br />2
<br />@
<br />g
<br />m
<br />a
<br />i
<br />l
<br />.
<br />c
<br />o
<br />m
<br />.
<br />A
<br />P
<br />R
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />F
<br />O
<br />R
<br />TE
<br />N
<br />A
<br />N
<br />T
<br />
<br />I
<br />M
<br />P
<br />R
<br />O
<br />V
<br />E
<br />M
<br />E
<br />N
<br />T
<br />DATE:
<br />09.08.25
<br />COVER SHEET
<br />SITE PLAN
<br />CS1
<br />REVISION
<br />DA
<br />T
<br />E
<br />RE
<br />V
<br />I
<br />S
<br />I
<br />O
<br />N
<br />WA
<br />T
<br />E
<br />R
<br />
<br />S
<br />T
<br />O
<br />R
<br />E
<br />1. These plans and specifications are the property of KN DEIGN and shall not
<br />be used for any work other than the project shown herein.
<br />2. Temporary barriers and/or a protective construction fence shall be provided where required
<br />by the Building Department and shall be constructed in accordance with the rules,
<br />regulations, and ordinances governing the place of the Building.
<br />3. Sanitary facilities shall be provided and maintained by Contractor during construction per
<br />applicable regulations.
<br />4. Contractor shall arrange and pay for all temporary utility services and connections during
<br />construction.
<br />5. General Notes, notes, and typical details apply to all drawings unless noted otherwise.
<br />6. All A.S.T.M. designations shall be amended to date unless otherwise noted.
<br />7. Framing conditions not specifically shown shall be framed similar to the details shown for the
<br />respective materials.
<br />8. Provide openings and supports for mechanical equipment, ducts, piping, vents, etc. as
<br />required. Refer to Architectural, and Mechanical Drawings for additional openings and
<br />equipment not shown on Structural Drawings. All suspended equipment to be provided with
<br />approved lateral bracing.
<br />9. DO NOT SCALE DRAWINGS.
<br />10. All dimensions are to face of studs, concrete or masonry unless noted otherwise.
<br />11. Provide 6" or 8" studs, or furring full length of room wall where required to accommodate
<br />plumbing and electrical installations.
<br />12. If existing facilities are related to the Work, the Contractor shall not disrupt the existing
<br />services or utilities without obtaining the Owner's prior approval and instructions in each case.
<br />13. Verify sizes and locations of all mechanical equipment before construction of any bases or
<br />pads to support such equipment.
<br />14. Verify all plumbing and equipment sizes before beginning construction of cabinets.
<br />15. Contractor is responsible for total coordination between all subcontractors and trades.
<br />16. Unless noted otherwise, all vestibules, closets, columns, projections, recesses or other
<br />adjacent areas within scheduled areas shall have finishes as scheduled for the respective
<br />spaces in which they occur.
<br />17. Anyone supplying labor and/or materials to the Project shall carefully examine all subsurfaces
<br />to receive work. Any conditions detrimental to work shall be reported in writing to Contractor
<br />prior to beginning. Commencement of work shall imply acceptance of all subsurfaces.
<br />18. Temporary bracing shall not be removed from any element until the element is capable of
<br />supporting its design load.
<br />19. Any material stored at the Site shall be completely supported free from the ground, covered
<br />and otherwise protected to avoid damage from the elements.
<br />20. All weather-exposed surfaces shall have a weather-resistive barrier to protect the interior wall
<br />covering and that exterior openings shall be flashed in such a manner as to make them
<br />weatherproof.
<br />21. All new conditions similar to existing conditions shall match existing construction, unless
<br />noted otherwise.
<br />22. All exposed ends of steel tubes, pipes, and other similar members shall receive steel
<br />closures/caps to be welded, ground smooth, and painted to match.
<br />23. Provide fire blocking per CBC Sections 717.2.2 through 717.2.7. Fire blocking shall be
<br />provided in concealed spaces of stud walls and partitions, including furred spaces at the
<br />ceiling and floor level and at 10 ft. intervals both vertical and horizontal. In combustible
<br />construction, fire blocking shall be installed to cut off concealed draft openings (both vertical
<br />and horizontal) and shall form an effective barrier between floors, and between a top story
<br />and a roof or attic space.
<br />24. Contractor to provide pedestrian protection in accordance with CBC Section 3306. If a
<br />separate building permit is required, the Contractor shall be responsible for submitting and
<br />acquiring approval from the governing agency.
<br />GENERAL NOTES
<br />A.BEFORE MAKING A REQUEST FOR FINAL FIRE INSPECTION, PLEASE READ AND COMPLY WITH THE
<br />APPLICABLE RCFPD NOTES: ADDITIONALLY, THE PERSON REQUESTING THE INSPECTION IS
<br />RESPONSIBLE FOR MEETING THE INSPECTOR ON TIME, PROVIDING ACCESS TO THE AREA
<br />REQUIRING INSPECTION AND HAVING AN APPROVED SET OF PLANS AND SUPPORTING DOCUMENTS
<br />AVAILABLE AT THE TIME OF THE INSPECTION.
<br />B.B. A FIRE INSPECTION AND FINAL APPROVAL IS REQUIRED BEFORE THE BUILDING DEPARTMENT WILL
<br />ACCEPT A BUILDING FINAL INSPECTION REQUEST. PLEASE CALL FIRE CONSTRUCTION SERVICES
<br />(FCS) TO REQUEST ALL FIRE INSPECTIONS.
<br />C.C. THE KEY TO THE BUILDING OR SUITE MUST BE GIVEN TO THE FIRE INSPECTOR AT THE TIME OF
<br />FINAL INSPECTION. THE KEY WILL BE LOCKED IN THE KNOX BOX FOR FIRE DEPARTMENT
<br />EMERGENCY ACCESS.
<br />D.D. FIRE EXTINGUISHERS MUST BE INSTALLED PER RCFDP FIRE EXTINGUISHER POLICY. START THE
<br />PLACEMENT OF FIRE EXTINGUISHERS MUST BE NEAR EXTERIOR EXIT DOORS. MOUNT THE FIRE
<br />EXTINGUISHER IN A VISIBLE AND ACCESSIBLE LOCATION 3 1/2' TO 5' ABOVE THE FINISH FLOOR TO
<br />HANDLE. BUILDINGS WITH MULTIPLE FLOORS MUST HAVE AT LEAST ONE FIRE EXTINGUISHER PER.
<br />FLOOR LIGHT HAZARD ( OFFICE, CLASSROOMS, CHURCHES, ASSEMBLY ROOMS, RESIDENTIAL)
<br />OCCUPANCIES REQUIRE "2A1OBC" FIRE EXTINGUISHERS. THE MAXIMUM COVERAGE AREA IS 5,000
<br />SQ. FT. PER EXTINGUISHER AND THE MAXIMUM TRAVEL DISTANCE IS 75'. COMMERCIAL KITCHENS
<br />REQUIRE "K" FIRE EXTINGUISHERS WITH A MAXIMUM TRAVEL DISTANCE OF 30'.
<br />E.E. AFCS BUILDING & CONTACT INFORMATION FORM MUST BE FILLED OUT BY THE OCCUPANT
<br />/OWNER PRIOR TO FINAL INSPECTION AND BE PROVIDED TO THE FIRE INSPECTOR. THE FORM IS
<br />AVAILABLE FROM THE FIRE CONSTRUCTION SERVICES (FCS) COUNTER.
<br />F. F. THE FIRE SPRINKLER SYSTEM MODIFICATIONS REQUIRES A SEPARATE PLAN CHECK SUBMITTAL
<br />AND APPROVAL. WORK SHALL NOT COMMENCE UNTIL A PERMIT IS OBTAINED. INSPECTION OF THE
<br />ROUGH PIPING MUST BE PERFORMED PRIOR TO CONCEALMENT, A LIFT IS REQUIRED FOR MOST
<br />INSPECTIONS. CEILING TILES MUST NOT INSTALLED UNLESS APPROVED BY THE FIRE INSPECTOR.
<br />G.G. THE FIRE ALARM AND / OR FIRE SPRINKLER MONITORING MODIFICATIONS REQUIRED THAT A
<br />SEPARATE PLAN CHECK SUBMITTAL AND APPROVAL. WORK SHALL NOT COMMENCE UNTIL A PERMIT
<br />IS OBTAINED.
<br />H.IN OCCUPANCY GROUPS "A-3" "B" "F" "M" & "S" BUILDINGS, IT IS REQUIRED THAT A SIGN BE PLACED
<br />ABOVE THE MAIN ENTRANCE DOOR STATING (THIS DOOR MUST REMAIN UNLOCKED WHEN BUILDING
<br />IS OCCUPIED).
<br />I.ALL THE DOORS DESIGNATED AS EXITS EXCEPT FOR THE MAIN ENTRANCE IN "A-3" "B""F""S"
<br />OCCUPANCIES MUST BE EQUIPPED WITH COMMON KNOWLEDGE LEVER TYPE SINGLE ACTION
<br />HARDWARE, UNLESS PANIC HARDWARE IS SPECIFICALLY REQUIRED.
<br />J.ADDITIONAL EXIT SIGNS MAY BE REQUIRED AT THE TIME OF FINAL INSPECTION, IF THE ONES SHOW
<br />ON THE PLANS DO NOT MEET THE INTENT OF THE CODE.
<br />K.IF AS-BUILD PLANS ARE REQUIRED, ADDITIONAL FEES WILL BE DUE FOR THE REVIEW OF THE
<br />AS-BUILD PLANS.
<br />L.THE SUITE ADDRESS DESIGNATION MUST BE INSTALLED ON OR NEAR ALL EXTERIOR DOORS OF THE
<br />SUITE IN 6-INCH HIGH NUMBERS OR LETTERS CONTRASTING THE BACKGROUND.
<br />M.IF EMERGENCY ILLUNATION IS EXISTING AND/OR REQUIRED, ADDITIONAL FIXTURES MAY BE
<br />REQUIRED TO BE INSTALLED (VERIFY THE REQUIREMENT WITH THE PLANS) THE LIGHTING MUST
<br />PROVIDE A MINIMUM OF ONE FOOT CANDLE AT THE FLOOR LEVEL THROUGHOUT THE EXIT PATH.
<br />TESTING OF THE FIXTURES WILL BE REQUIRED AT FINAL INSPECTION. THE FIRE INSPECTOR MAY
<br />REQUEST A NIGHTTIME TEST AT HIS DISCRETION TO CONFIRM THE MINIMUM REQUIREMENT OF
<br />ONE-FOOT CANDLE AT FLOOR LEVEL.
<br />N.THE SMOKE DUCT DETECTORS FOR HVAC SHUT DOWN, WHEN REQUIRED, MUST BE INSTALLED TH
<br />THE SUPPLY PLENUM OF THE UNIT AND INTERCONNECTED TO THE FIRE ALARM (IF THE BUILDING IS
<br />EQUIPPED WITH A FIRE ALARM OR A SPRINKLER MONITORING SYSTEM) A SEPARATE PLAN CHECK
<br />SUBMITTAL AND PERMIT IS REQUIRED FOR THE ALARM WORK.
<br />O.THE FIRE/SMOKE DAMPERS, WHEN REQUIRED, MUST BE INTERCONNECTED TO THE FIRE ALARM (IF
<br />THE BUILDING IS EQUIPPED WITH A FIRE ALARM OF FIRE SPRINKLER MONITORING SYSTEM) A
<br />SEPARATE PLAN CHECK SUBMITTAL AND PERMIT IS REQUIRED FOR THE ALARM WORK.
<br />FIRE PREVENTION NOTES:SHEET INDEX
<br />DESCRIPTIONNo.
<br />SPRINKLERED
<br />TYPE OF CONSTRUCTION : V-B
<br />PREVIOUS OCCUPANCY : B
<br />ZONE : C5
<br />: NO SPRINKLERED
<br />TENANT IMPROVEMENT SQUARE FOOTAGE : 1,273 SQ. FT.
<br />OCCUPANCY MAX. : 13 OCC. < 50
<br />EXIT REQUIRED: 1 EXIT PROVIDED: 3
<br />PROJECT DATA
<br />CODE COMPLIANCE
<br />SCOPE OF WORK
<br />B.
<br />A.ALL WORK SHALL BE IN CONFORMANCE WITH THE CODES IDENTIFIED IN THE
<br />GOVERNING CODES SECTION LISTED BELOW.
<br />2022 CALIFORNIA BUILDING CODE AND JURISDICTIONAL AMENDMENTS
<br />2022 CALIFORNIA MECHANICAL CODE AND JURISDICTIONAL AMENDMENTS
<br />2022 CALIFORNIA PLUMBING CODE AND JURISDICTIONAL AMENDMENTS
<br />2022 CALIFORNIA ELECTRICAL CODE AND JURISDICTIONAL AMENDMENTS
<br />2022 CALIFORNIA ENERGY CODE AND JURISDICTIONAL AMENDMENTS
<br />2022 CALIFORNIA GREEN BUILDING STANDARDS AND JURISDICTIONAL AMENDMENTS
<br />CITY CODES AND ORDINANCES
<br />DISABLED ACCESSIBILITY
<br />CHAPTER 11B OF 2022 CBC
<br />ACCESSIBILITY REQUIREMENTS PER THE FEDERAL ADA, ANSI 117.1-2003 AND
<br />2022 CBC OR AS AMENDED BY STATE OR LOCAL REGULATIONS, WHICHEVER IS
<br />MOST RESTRICTIVE
<br />01
<br />02
<br />CS-1 COVER SHEET, SITE PLAN
<br />G1 GREEN BUILDING
<br />SEPARATE SUBMITTAL
<br />- ALL NEW EXTERIOR SIGNAGE SHALL BE SUBMIT ON A SEPARATE SIGN APPLICATION
<br />FOR PLANNING AND BUILDING DIVISION REVIEW, APPROVAL, AND INSPECTION.
<br />VICINITY
<br />N
<br />**It is the project designer’s/property owner’s responsibility to show compliance on the drawings with all applicable Federal
<br />and State Accessibility Standards.
<br />**Drawings submitted to the Building Division for review shall provide the following information to insure compliance with
<br />CBC Section 11B-202.4:
<br />-An accessible entrance
<br />-An accessible route to the altered area
<br />-Accessible restrooms
<br />-Accessible telephone (if any)
<br />-Accessible drinking fountains, and
<br />-Parking, signage and alarm
<br />** 1116A.5 Detectable Warnings at Vehicular Areas
<br />When a walk crosses or adjoins a vehicular way, the walking surface shall be separated from the vehicular area by curbs,
<br />railings or other elements, or the boundary between the pedestrian areas and the vehicular areas shall be defined by a
<br />continuous detectable warning 36 inches (914 mm) wide minimum, complying with Chapter 11B, Section 11B-705.
<br />NUMBER OF STORIES : ONE
<br />TENANT IMPROVEMENT FOR 1273 SF WATER STORE:
<br />- EXISTING ALL GENDER RESTROOMS TO BE REMAIN.
<br />- NEW ELECTRICAL
<br />- NEW PLUMBING
<br />- NEW NON-BEARING WALL
<br />** LEGALIZE ROOF TOP AC UNITS AND DUCT WORK
<br />**DEMOLITION EXISTING NON-BEARING WALLS
<br />APN 396-034-02
<br />PROJECT DIRECTORY
<br />OWNER:BOB & MARTHA GACIA
<br />1641 E, 17th Street #A,
<br />Santa Ana, CA 92705
<br />(714) 550-9899
<br />DESIGNER: ART DESIGN
<br />KIM NGUYEN
<br />10492 TRASK AVE. #B,
<br />GARDEN GROVE, CA 92843
<br />(714)417-1839
<br />MECH./PLUMB.:
<br />PHANH PHONGSAK
<br />13231 ACORO PL, CERRITOS, CA 90703
<br />(562)404-2695
<br />ELECTRICAL:
<br />CHAU TANG
<br />7252 Siena Avenue, Westminster, CA 92683
<br />(714) 249-3501
<br />1273 SF
<br />EXISTING PARKING: 72 TOTAL. INCLUDING 3 ACCESSIBLE PARKING SPACE
<br />( ONE VAN, TWO REGULAR)
<br />SITE PLAN
<br />SCALE: 1/15" = 1' 0"
<br />1 N
<br />NO
<br />PARKING
<br />NO
<br />PA
<br />R
<br />K
<br />I
<br />N
<br />G
<br />NO
<br />PA
<br />R
<br />K
<br />I
<br />N
<br />G
<br />PROJECT SITE
<br />07 02
<br />02
<br />03
<br />03
<br />03 03
<br />03
<br />03
<br />03
<br />03
<br />03
<br />04
<br />05
<br />07
<br />07
<br />07
<br />11
<br />11
<br />1009
<br />05
<br />A1 EXISTING-DEMOLITION PLAN, PROPOSED FLOOR PLAN
<br />03
<br />G2 GREEN BUILDING
<br />04
<br />G3 GREEN BUILDING
<br />06
<br />A2 CEILING PLAN, FINISH PLAN
<br />07
<br />A3 NOTES, DETAILS
<br />08
<br />E-1 GENERAL NOTES
<br />09
<br />E-2 POWER PLAN
<br />10
<br />E-3 LIGHTING PLAN
<br />11
<br />E-4 T24 COMPLIANCE FORM
<br />12
<br />P-1 NOTES, SPECS, SCHEDULE
<br />13
<br />P-2 FLOOR PLAN, DETAILS
<br />Accessible Path of Travel: 48 in minimum width walkway,
<br />5% maximum slope in the direction of travel, 2%
<br />maximum cross-slope. §11B-403.3 & §11B-403.5
<br />12 (E.) ACCESSIBLE CONC. PUBLIC SIDEWALK PATH
<br />OF TRAVEL TO THE BUILDING NO CHANGE
<br />12
<br />1641-A
<br />1641-B 123 DENTAL
<br />1631-A 1631-B 1631-C 1631-D 1631-E
<br />1631-F
<br />1631-J
<br />FR
<br />E
<br />E
<br />W
<br />A
<br />Y
<br />
<br />I
<br />N
<br />S
<br />U
<br />R
<br />A
<br />N
<br />C
<br />E
<br />ST
<br />A
<br />R
<br />
<br />N
<br />A
<br />I
<br />L
<br />S
<br />HA
<br />I
<br />R
<br />
<br />S
<br />A
<br />L
<br />O
<br />N
<br />CI
<br />G
<br />A
<br />R
<br />A
<br />T
<br />T
<br />E
<br />S
<br />
<br />&
<br />
<br />G
<br />I
<br />F
<br />T
<br />S
<br />JI
<br />U
<br />
<br />J
<br />I
<br />T
<br />S
<br />U
<br />PAYDAY ADVANCE
<br />CALI TACOS
<br />1A
<br />1s
<br />t
<br />
<br />B
<br />U
<br />I
<br />L
<br />D
<br />I
<br />N
<br />G
<br />/
<br />P
<br />L
<br />A
<br />N
<br />N
<br />I
<br />N
<br />G
<br />
<br />C
<br />R
<br />1s
<br />t
<br />
<br />H
<br />E
<br />A
<br />L
<br />T
<br />H
<br />
<br />C
<br />O
<br />R
<br />R
<br />E
<br />C
<br />T
<br />I
<br />O
<br />N
<br />1
<br />(E.) ROOF SCREENING
<br />1
<br />A4
<br />2
<br />A4 1
<br />PROPOSED OCCUPANCY : M
<br />RTU
<br />RTU
<br />OCCUPANCY B
<br />OCCUPANCY M
<br />1
<br />PROPERTY LINE
<br />PROPERTY LINE
<br />PR
<br />O
<br />P
<br />E
<br />R
<br />T
<br />Y
<br />
<br />L
<br />I
<br />N
<br />E
<br />PR
<br />O
<br />P
<br />E
<br />R
<br />T
<br />Y
<br />
<br />L
<br />I
<br />N
<br />E
<br /> “No known easements.”
<br />1
<br />A4 DETAILS (E) ENTRY
<br />(E) EXIT
<br />(E) ENTRY
<br />PARKING SUMMARY TABLE
<br />STALL STYLE PARKING STALLS
<br />STANDARD 69
<br />ADA
<br />TOTAL PARKING STALLS
<br />3 (INCLUDING 1 VAN)
<br />72
<br />1
<br />14
<br />M1 NOTES, SPECS, SCHEDULE
<br />15
<br />M2 FLOOR PLAN
<br />16
<br />T1 T24 ENERGY FORMS
<br />17
<br />T1 T24 ENERGY FORMS
<br />18
<br />T1 T24 ENERGY FORMS
<br />19
<br />06
<br />SN-1 GENERAL DETAILS & NOTES
<br />S-1.0 FRAMING PLAN
<br />20
<br />21
<br />MECHANICAL EQUIPMENT SCREENING: SCREEN WALL
<br />WILL BE PAINTED TO MATCH THE EXISTING ROOF
|