My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2525 N Grand Ave & MTR01 - Plan
PBA
>
Building
>
ProjectDox
>
G
>
Grand Ave
>
2525 N Grand Ave Unit# MTR01
>
2525 N Grand Ave & MTR01 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2026 5:38:04 AM
Creation date
6/19/2026 5:00:17 AM
Metadata
Fields
Template:
Plan
Permit Number
20188745
101126642
101126643
Full Address
2525 N Grand Ave Unit# MTR01
2525 N Grand Ave
Street Number
2525
Street Direction
N
Street Name
Grand
Street Suffix
Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Rev: 07/16//2019 Page 1 of 2 <br /> <br />Eligibility Checklist for Expedited EV Charging Station Permit: <br />Multi-Family Dwellings <br />Type of Charging Station(s) Power Levels (proposed circuit rating) Check one <br />Level 1 110/120 volt alternating current (VAC) at 15 or 20 Amps <br />Level 2 - 3.3 kilowatt (kW) (low) 208/240 VAC at 20 or 30 Amps <br />Level 2 – 6.6kW (medium) 208/240 VAC at 40 Amps <br />Level 2 – 9.6kW (high) 208/240 VAC at 50 Amps <br />Level 2 – 19.2kW (highest) 208/240 VAC at 100 Amps <br />Other (provide <br />detail): <br />Provide rating: <br /> <br />Permit Application Requirements: <br /> <br /> <br />A. Does the application include EVCS manufacturer's specs and installation guidelines? Y N <br />Electrical Load Calculation Worksheet: <br /> <br />A. Is an electrical load calculation worksheet included? (CEC 220) Y N <br />B. Based on the load calculation worksheet, is a new electrical service panel upgrade <br />required? Y N <br />1) If yes, do plans include the electrical service panel upgrade? Y N <br />C. Is the charging circuit appropriately sized for a continuous load of 125%? Y N <br />D. If charging equipment proposed is a Level 2 – 9.6 kW station with a circuit rating of 50 <br />Amps or higher, is a completed panel schedule with electrical calculations included <br />with the single line diagram? <br /> <br />Y <br /> <br />N <br /> <br />Site Plan and Single Line Drawing: <br /> <br />A. Is a site plan and separate electrical plan with a single-line diagram included <br />with the permit application? Y N <br />1) If mechanical ventilation requirements are triggered for indoor venting <br />requirements (CEC 625.52 (B)), is a mechanical plan included with the <br />permit application? <br /> <br />Y <br /> <br />N <br />B. Is the site plan fully dimensioned and drawn to scale? Y N <br />1) Showing location, size, and use of all structures Y N <br />2) Showing location of electrical panel to charging system Y N <br />3) Showing type of charging system and mounting Y N <br />480/277level 3
The URL can be used to link to this page
Your browser does not support the video tag.