Laserfiche WebLink
Addendum to EIR No. 1988-01, AA No. 2015-01 <br />GPA No. 2015-01 & ZOA No. 2015-01 <br />April 9, 2018 <br />Page 6 <br />Analvsis of the Issues <br />Amendment ADDlication <br />The adoption of the Bristol Street Corridor Specific Plan in 1991 resulted in the redesignation of <br />the majority of parcels along the corridor for various uses, including for commercial or office <br />development, with the majority of the parcels identified to be used as a linear park. Since <br />adoption of the Plan, several parcels along the corridor have been redeveloped per the <br />standards identified in the Plan. However, due to a reconsideration in the amount of right-of-way <br />for the remaining segments of the corridor, the size of the remnant parcels has increased, which <br />allows potential development opportunities for these parcdels. The previous right-of-way needed <br />for the widening project was 150 feet; the right-of-way needed for the final phases has been <br />reduced to 128 feet. Development on the parcels identified earlier in this report on Table 1 will <br />allow the City to generate revenue to help offset the cost for improving Bristol Street, revenue <br />that was not anticipated when the Plan was originally adopted. The proposed zone changes will <br />not adversely affect the neighborhoods adjacnet to the Bristol Street boundaries but will be in <br />keeping with the existing land use and subdivision patterns of the area which they are located. <br />General Plan Amendment <br />The City's Land Use Element of the General Plan serves as the long-range guide for land use <br />and development in the City and facilitates growth reflecting the community's vision. The Bristol <br />Street Specific Plan anticipated the widening of Bristol Street from four to six lanes while <br />introducing a series of linear parks with limited new development along the corridor. However, <br />given the reduction in the right-of-way needed to complete the widening project, numerous <br />parcels along the corridor that were once too small to accommodate development are now <br />appropriately sized to facilitate development. Therefore, the proposed general plan amendment <br />to change the land use designations for the parcels listed earlier in this report on Table 1 to <br />reflect their new development potential is supported by staff. <br />The proposed changes to the general plan land use designations will comply with State law as <br />they will be consistent with the proposed zoning designations for the parcels. In addition to the <br />amendment to the General Plan Land Use Plan maps, various text and maps in the General Plan <br />Land Use Element are proposed to be updated to reflect the buildout detailed in the Bristol Street <br />Corridor Specific Plan in order to maintain consistency with the Citys General Plan vision. <br />Zoning Ordinance Amendment <br />Staff is proposing several updates to the existing Bristol Street Corridor Specific Plan (SP -1) <br />document, which requires the approval of a zoning ordinance amendment. Per Santa Ana <br />Municipal Code (SAMC) Section 41-592, the SAMC establishes regulations for the creation of <br />and amendments to specific plans. As stated in the SAMC, the purpose of a specific plan is to <br />protect the health, safety and general welfare of the City by encouraging the use of innovative <br />75D-8 <br />