My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - FLOWER ST IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
05/15/2018
>
23A - FLOWER ST IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 7:53:50 PM
Creation date
5/10/2018 7:51:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/15/2018
Destruction Year
2023
Document Relationships
ALL AMERICAN ASPHALT (17)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM No. One <br />PROPOSAL <br />PROJECT NO.: 18-6916 <br />FLOWER ST, SLURRY: SUNFLOWER AVE. TO MACARTHUR BLVD, <br />PROJECT NO,: 18-6917 <br />MACARTHUR BLVD. SLURRY: RAITT ST. TO BRISTOL ST. <br />ItemPFInishGrade <br />ption <br />Qty <br />Unit <br />YTnitPrice <br />Amount <br />13ave <br />1 <br />EA <br />$ 1100.00 <br />$ 1100,06 <br />14Metal <br />Pull Box Frame and Cover to <br />2 <br />EA <br />$ (050 • UU <br />$ 13Uw DU <br />15Manhole <br />Frame &Cwar to -Finish <br />Grade <br />10 <br />EA <br />$ arj�,UO <br />$�51U•UU <br />16 <br />FnmishandInstallWaterValveFmmeand <br />Cover to Finish Grade <br />B <br />BA <br />$QQO.UU <br />$ (p�UO•UU <br />17 <br />Furnish and Install New #6 Pull Box <br />4 <br />EA <br />$ ( qo • U 0 <br />$ Z� IRU _I00 <br />18 <br />Protection of Surface Utility Frames & Covers <br />(FlowerSt,) <br />1 <br />IS <br />$Uj50•UU <br />$g50.UU <br />19 <br />of Surface Utility Frames &Covers <br />Prote(MacArthur <br />(MaoArthur Blvvd.) <br />1 <br />LS <br />$ q 0.00 <br />$ q 50 0U 0 <br />20 <br />Temporary ConsnuctionSign <br />3 <br />EA <br />$ IlUU.00 <br />$ �30U • 00 <br />21 <br />Project advertisement sign <br />4 <br />EA <br />$ �05U.00 <br />T-42:0-0. UO <br />22 <br />Fumish and Install Traffic Loops Type D fi <br />28 <br />EA <br />23 <br />Fumish and Install TrafScLoops Typo Et <br />67 <br />EA <br />$ZUA•Dt7 <br />$13y3ia,00 <br />24 <br />Signing and Striping (Flowerst,) <br />1 <br />LS <br />$ g2oo.UU <br />$GJ 2,0,,0, <br />25 <br />Signing and Striping(MacArthurBlvd,) <br />1 <br />LS <br />$1j0oo.Od <br />$ 11U00.00 <br />26 <br />Labor Agreement Oversight <br />1 <br />LS <br />$ 15,000 <br />$ 15,000 <br />P-2 of P-17 <br />23A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.