My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - FLOWER ST IMPROVEMENTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
05/15/2018
>
23A - FLOWER ST IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 7:53:50 PM
Creation date
5/10/2018 7:51:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
5/15/2018
Destruction Year
2023
Document Relationships
ALL AMERICAN ASPHALT (17)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM No. One <br />PROPOSAL <br />PROJECT NO.: I8-6916 <br />FLOWER ST. SLURRY: SUNFLOWER AVE. TO MACARTHUR BLVD. <br />PROJECT NO.: 18-6917 <br />MACARTHUR BLVD. SLURRY: RAITT ST. TO BRISTOL ST. <br />TOTAL BASE BID $ 5(o9, '%p (p. 0 0 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />f This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within forty-five (45) working days after the commencement date stated in the <br />Notice to Proceed. All work must be completed by August 31, 2018 <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $2,500 per calendar day. <br />Nae of Firm AII American Asphalt <br />Signature of BIDDER <br />Title Edward J. Carlson Vice President <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasiicer,and Manager; thereof.) <br />All American Asphalt -Corporation <br />Mark Luer- President <br />Edward J. Carlson- Vice President <br />Michael Farkas- Secretary <br />P-3 of P-17 <br />23A-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.