My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19C - CIP STATUS MAY 2018
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/05/2018
>
19C - CIP STATUS MAY 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2018 7:56:11 PM
Creation date
5/31/2018 7:47:33 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19C
Date
6/5/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monthly CIP Executive Report for May 2018 <br />June 5, 2018 <br />Page 2 <br />Alley Improvement Program <br />This project will replace two existing alleys with new concrete. Through cost savings from the <br />prior year's alley project, the rehabilitation of one alley on the project schedule was expedited. <br />This alley is located south of Pine Street and north of Chestnut Avenue, east of Halladay Street <br />and west of Cedar Street in the Eastside Neighborhood in Ward 2. The remaining alley is located <br />south of Walnut Street, North of Pine Street, East of Standard Avenue and West of Minnie Street <br />in Ward 2. The project will be released for bid advertisement in early summer 2018. <br />Civic Center Storm Drain Lift Station <br />The City of Santa Ana has issued a request for proposals to obtain a qualified professional <br />engineering design firm to provide design services and recommendations for the replacement of <br />two existing Civic Center storm drain lift stations. The firm will also ensure compliance with all <br />safety, permit, and regulatory requirements for mechanical, electrical, and civil work. Once <br />proposals are received, the project will be expedited with the goal to complete work prior to <br />Winter 2018. <br />First Street Drainage Lift Station <br />The project includes reconstruction of an existing storm drain lift station. The improvements <br />include upgrading the existing building, power supply, motor control systems, and Supervisory <br />Control and Data Acquisition System (SCADA). It is anticipated the design/build contract will be <br />awarded in the summer of 2018. <br />STRATEGIC PLAN ALIGNMENT <br />This item supports the City's efforts to meet Goal #5 — Community Health, Livability, Engagement <br />& Sustainability, Objective #1 (establish a comprehensive community engagement initiative to <br />expand access to information and create opportunities for stakeholders to play an active role in <br />discussing public policy and setting priorities). <br />FISCAL IMPACT <br />There is no fiscal impact associated with this item <br />Edwin "William" GaTvez, PS. <br />Acting Executive Director <br />Public Works Agency <br />Exhibit 1: CIP — Executive Summary Schedule may be reviewed at: <br />http://www.santa-ana.orq/pwa/documents/ExecutiveMonthlyCI PMav20l 8.pdf <br />19C-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.