Laserfiche WebLink
RESOLUTION 2018 -XXX 3.88% <br />PROPOSED <br />REVENUE FY 17-18 FY 18-19 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br />SECTION IX PLANNING& BUILDING AGENCY <br />53600 <br />120) <br />Code Modification - moderate <br />flat <br />1,706.80 <br />1,773.02 <br />53601 <br />53602 <br />53603 <br />53600 <br />121) <br />Code Modification - complex <br />flat <br />3,413.60 <br />3,546.05 <br />53601 <br />53602 <br />53603 <br />53600 <br />122) <br />Notice of Violation- Structural Plan Check New <br />hourly <br />213.86 <br />222.16 <br />51601 <br />123) <br />Permit Issuance Fee- EMP and Misc. Building <br />flat <br />52.98 <br />55.04 <br />51602 <br />51603 <br />51604 <br />51601 <br />124) <br />Permit Issuance Fee- Residential and Non Residential <br />flat <br />141.32 <br />146.80 <br />51600 <br />125) <br />Permit Issuance Fee- General Plan Update surcharge p <br />flat <br />21.25 <br />22.08 <br />51601 <br />126) <br />Permit Renewal/Extension Fee <br />flat <br />77.13 <br />80.13 <br />51602 <br />(per permit renewed or extended) <br />51603 <br />51604 <br />Residential Reeftep sole, (!WN to HION) <br />51601 <br />127a) <br />Residential Photovoltaic System (1kW to 15kW) <br />flat <br />500.00 <br />450.00 <br />Plus each additional kW over 15kW <br />r <br />each <br />15.50 <br />15A0 <br />127b) <br />Residential Thermal Systems(lkwth to 10 kWth) <br />flat <br />500.00 <br />450.00 <br />Plus each additional kWth over 10kWth <br />each <br />15.50 <br />15.00 <br />127c) <br />Commercial Rooftop Solar(1kW to SOkW) <br />flat <br />1,033.60 <br />1,000.00 <br />Plus each additional kW over SOkW up to 250 kW <br />each <br />7.24 <br />7.OD <br />Plus each additional kW over 250kW <br />each <br />5.17 <br />5.00 <br />127d) <br />Commercial Thermal Systems(SkWth up to 30kWth) <br />flat <br />2,480.64 <br />1,000.OD <br />Plus each additional kWth between 30kWth up to 2601<Wth <br />each <br />7.24 <br />7.00 <br />Plus each additional kWth over 2601kW <br />each <br />5.17 <br />5.00 <br />'Refer to Summary of New, Modified and Deleted Fees <br />75A-2-45 35 <br />