Laserfiche WebLink
RESOLUTION 2018 -XXX 3,88% <br />PROPOSED <br />REVENUE FY 17-18 FY 18-19 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br />SECTION IX PLANNING & BUILDING AGENCY <br />53600 <br />128) <br />Solar Panel -Structural Plan Check <br />hourly <br />213.86 <br />222.16 <br />51601 <br />129) <br />Solar Panel- Inspection Residential <br />flat <br />315.04 <br />327.26 <br />51601 <br />130) <br />Solar Panel -Inspection Commercial <br />flat <br />949.37 <br />986.21 <br />51601 <br />131) <br />Field Plan Check -subject to field Structural Plan Check <br />hourly <br />154.27 <br />160.26 <br />53600 <br />132) <br />Cell Tower -Structural Plan Check <br />hourly <br />213.86 <br />222.16 <br />53600 <br />133) <br />Deferred Submittal -Structural Plan Check <br />hourly <br />213.86 <br />222.16 <br />53600 <br />134) <br />Rooftop equipment -Structural Plan Check <br />hourly <br />213.86 <br />222.16 <br />53600 <br />135) <br />Equipment Changeout- Structural Plan Check <br />hourly, min 1/2 hr <br />213.86 <br />222.16 <br />53600 <br />136) <br />Dust Collecting- Structural Plan Check <br />hourly <br />213.86 <br />222.16 <br />53600 <br />137) <br />Above/Below Ground Tank- Structural Plan Check <br />hourly <br />213.86 <br />222.16 <br />53600 <br />138) <br />Trash Enclosures- Structural Plan Check <br />flat <br />213.86 <br />222.16 <br />53600 <br />139) <br />Lighting Standards- Structural Plan Check <br />hourly, min 1/2 hr <br />213.86 <br />222.16 <br />51601 <br />140) <br />Lighting Standards - Inspection <br />hourly <br />154.26 <br />160.25 <br />53600 <br />141) <br />Pedestrian Protection -Structural Plan Check <br />hourly, min 1/2 hr <br />213.86 <br />222.16 <br />51601 <br />142) <br />Pedestrian Protection - Inspection <br />hourly, min 2hr <br />154.26 <br />160.25 <br />53600 <br />143) <br />Security Card Reader- Structural Plan Check <br />hourly, min 1/2 hr <br />213.86 <br />222.16 <br />53600 <br />144) <br />Fire Damage Repair,Structural - Plan Check <br />hourly <br />213.86 <br />222.16 <br />51601 <br />145) <br />Certificate of Occupancy inspection <br />flat <br />55.17 <br />57.31 <br />51601 <br />146) <br />Temporary Certificate of Occupancy <br />flat <br />464.22 <br />482.23 <br />53600 <br />147) <br />Revision -Structural Plan Check `I <br />hourly, min 1/2 hr <br />213.86 <br />222.16 <br />53601 <br />148) <br />Revision -EMP Plan Check <br />hourly, min 1/2 hr <br />213.86 <br />222.16 <br />53602 <br />53603 <br />51601 <br />149) <br />Special Inspection <br />hourly <br />154.26 <br />160.25 <br />51602 <br />51601 <br />150) <br />Relocation Inspections <br />Main building orstructure <br />Each <br />469.65 <br />487.88 <br />Accessory structure <br />Each <br />93.17 <br />96.78 <br />Inspection forstructures located outside of the City <br />Per Mile <br />0.92 <br />0.95 <br />Travel time <br />Per Hour <br />93.17 <br />96.78 <br />75A-2-46 36 <br />