My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EBS GENERAL ENGINEERING, INC. (6)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
EBS GENERAL ENGINEERING, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2018 1:50:26 PM
Creation date
6/13/2018 3:58:40 PM
Metadata
Fields
Template:
Contracts
Company Name
EBS GENERAL ENGINEERING, INC.
Contract #
Various
Agency
Public Works
Council Approval Date
5/1/2018
Document Relationships
20A - AA WESTMINISTER IMPROVEMENTS
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2018\05/01/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 15-6825 <br />WESTMINSTER AVE. FROM HARBOR BLVD. TO CLINTON ST. <br />PROJECT 18-6902 <br />WESTMINSTER AVE. FROM CLINTON ST TO FAIRVIEW ST. <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />PCC Pattern Stamped Concrete <br />300 <br />SF <br />$ <br />$ <br />' <br />Goo <br />15 <br />Root Shave <br />5 <br />EA <br />$1 <br />$ <br />va -� <br />SGro -- <br />16 <br />Adjust Water Valve Frame and Cover to <br />69 <br />EA <br />$ <br />$ <br />Finished Grade <br />17 <br />Adjust Sewer and Drainage Manhole to <br />42 <br />EA <br />$ <br />$ <br />Finished Grade <br />18 <br />Adjust Water Meter Frame and Cover to <br />4 <br />EA <br />$ <br />$ <br />Finished Grade <br />(l DUO - <br />19 <br />Adjust Survey Monument to Finished <br />4 <br />EA <br />$ <br />$ <br />Grade <br />oo - <br />20 <br />Furnish and Install New #6 Pullbox <br />6 <br />EA <br />$ <br />$ <br />21 <br />Furnish and Install Cast -in Place ADA <br />2 <br />EA <br />$ <br />$ <br />Truncated Dome Panel <br />7.� <br />t - <br />22 <br />Furnish and Install Traffic Loops Type <br />16 <br />EA <br />$ <br />$ <br />E <br />..-- <br />'7 Lr® <br />23 <br />Furnish and Install Traffic Loops Type <br />39 <br />EA <br />$ <br />$ <br />D <br />5b — <br />24 <br />Temporary Construction Signs <br />10 <br />EA <br />$ <br />$ <br />D' <br />o <br />25 <br />Signing and Striping <br />1 <br />LS <br />$ <br />$ <br />!3"� <br />Li(% <br />26 <br />Traffic Control and Traffic Control Plan <br />1 <br />LS <br />$�/j 9 L) <br />$ <br />27 <br />Project Advertising Sign <br />3 <br />EA <br />$ <br />$ <br />3 42M <br />28 <br />Push Button <br />3 <br />EA <br />$ <br />$ <br />P-2 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.