My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 13 Storm Drain Plans (option a) ..................................... <br />I <br />.... ................ .............. <br />We will prepare storm drain pians showing proposed eataln basloaand lateral eonnaotlons to the existing train Imes, <br />.+ <br />Catch basin sizing, inlet dimensions, and laterals pipe sizes wtli be determined as pad of Task 4. Potentiai oonfitcts with <br />existing utilities will be shown on protilea with approximate loostiorn of utilities, per the utility agencies readily available <br />C) <br />r000rd.drawings. Storm drain plans wail be. prepared at a scale of 1" 20" horizontal and V;; 4' vertical for profiles, <br />Deilvorables: 30, 60%, end Final plans, electronlo files kr Mlorostagon V81 and PDP ((met plans will be seated end <br />slgned), and responses toprovious revlowcomments from theCtiy. <br />( <br />01 <br />Task 14 Street Light and Electrical flans (gpfion 13) <br />........... ............... .. ................. <br />Klmlay-Horn wait prepare street light pians for the project, Plans will incorporate street lighting along both aides of -the <br />C) <br />street. We, will conduct Voltage drop calculations to:datarmine the wiring sizes. Part of this task win Include eoordinaffon <br />with Southern California Edison to determine now and existing service points, We will provide a photometric a"nalysis to <br />detormlarequiredlilamination for the corridor. <br />Deliverables: 30 Yo. 60, and Fin a/ flan, alection/a rites in Micros islion V61 and PDF (final pians will ba sealed and <br />signed), and responses to previous review comments from the City' <br />Task 15Trak Signal Plans (Option !) ........ ........ ........ <br />We Wit propane traffic signal plans to Incorporate ilio now Improvements Siong project area, installation of olosed-oirbutt <br />j <br />Wevision (CCTV), video detection, ooridults, and cablos or modification of existing communication systems is anticipated <br />within the project limits and will be shown on the frafflo signal plans. Plans will show the connection to each signalized <br />Intersection vutthlff-iho project limits. Pull box detalls and modification of condultsweeps for the signal Interconnect are <br />included. The traffic signal modification plan will be prepared in accordance with current City and Caltrans standards and <br />I <br />will be prepared at a scale of 1" c 20' <br />Dallverabl <br />
The URL can be used to link to this page
Your browser does not support the video tag.