My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦00o <br />*TWINING <br />Amir Ghavibazoo, Ph.D., Senior Pavement Engineer <br />Dr. Amir Ghavlbazoo is the Senior pavement Engineer at Twining, Inc. He directs and works on <br />pavement design, highway design, and engineering specifications. During hls.graduats study, Amir <br />obtained extensive knowledge and expertise on pavement Management Systems (M1croP6er), <br />Pavement. Evaluation and Pavement Rehabilitation Strategies. He is an expert in calculating Pavement <br />Condition index (PCQ through visual Inspection following the United Stated Army Corps of Engineers' <br />methodology, as well ab conducting Life Cycle Cost Analysis (LCCA) rehabilitation strategies for. <br />pavements. Amir has extensive practloal experience In asphalt pavement engkisering Including, <br />pavement dealgn, rehabilitation, preservat{on, pavement management, materials, and construction, His <br />experience includes the characterization of ruhbotizsd asphalt binders and developing mix designs <br />following Suporpave specifications. He works closely with cities and govemment agencies to:dsvelop <br />unique and specialized mix designs, pavement constructions Inspections, and pavement design <br />solutions. <br />Overview <br />In the Industryslnce 2014 <br />Joined Twining in 2014 <br />Education <br />Ph.D. In Civil and Environmental Engineering <br />North Dakota State University <br />Master of Science in Railways Engineering <br />Iran University of Science and Technology, Tehran, Iran <br />Project Experience Summaries <br />• City of Huntington Beach, Nichols Lane Rahabliltation Twining performed inspection and <br />material testing. on this project. Amir served as project manager to assure the quality of the job <br />that was Wng delivered to the City, He oversaw the material sampling and testing and provided <br />technical comments to the City. He was also responsible for developing Cement -treated soil mix <br />design for the City. <br />• City of Claremont, Foothill Boulevard Improvement Twining performed pavement evaluation <br />on approximately four lane miles of Foothill Boulevard in the City of Claremont to recommend <br />repair and rehabilitation strategies for the pavement. Amir served as senior pavement engineer, <br />coordinating the required testing and preparation of the final recommendation and design, <br />Several alternative options woes provided to the City, Including mill and overlay, Cold In -Place <br />recycling, reconstructlon, and soil 'stabilization, <br />• Pavement Evaluation & Repair Recommendations at Various Parke Twining performed <br />network level pavement evaluation on approximately 20 loins miles of road in various parks of <br />sorest Lawn in Southern California to develop a 5 -year plan for rehabilitation of the road network. <br />Amir was the lead pavement Engineer on this project, coordinating all required surface evaluation <br />tasks, date collection, and preparation of the final report. <br />• City of EI Monte, Ramona Boulevard Resurfacing Pavement Evaluation This project <br />consisted of repairing the PS&E and related construction documents for the 2014- 2015 STP -L <br />Ramona Boulevard Street Resurfacing project. Twining performed gootechnlcat pavement <br />avralnattnna and rrahahilltAtion ryrnmmandatinns fnr thin nrnlant Amir p ArvAd pa tFra nAvameant <br />25E-145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.