My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-CALL ENGINEERING SERVICES 19, <br />Wdgrnes MO-OPIMA <br />PROJECT ORRANIZATiONAL CHART <br />Tom <br />Mark Bush, PE <br />Mike Tsoi, irE <br />Motor Ramirez, PC, SE <br />M 6 10h Kassar; PE <br />IAyie Sohn, l'C.,', <br />Er10 V len, PP �gl.. <br />N(OOIb„FtartlnP� ` 'r ::,. <br />Grin Labatierc.: <br />�J RNEIR .. <br />SCAOA <br />LOCAtj&TATEAEALTH. <br />Paella Fell <br />Astrid Fletsoher, PE <br />Gory f-ieggtveit <br />• OEOTEONNIOAL <br />HYRROGEOLOGY SURVEY <br />TRAFFIC CONTROL POTHOLING <br />Leighton <br />Richard Slade Matz surveying <br />PMK Cardno, <br />Consulting <br />& Associates <br />Associates saf r Dig, <br />C -Below <br />Mr. Victor Ramirez, PE, BE, will be the Project Manager for Structural Engineering. <br />Mr. Ramirez has more than 28 years of experience In structural engineering design and <br />construction support services with an emphasis in the design of water storagelwater <br />containment and waterconveyance related structures, This includes: reservoirs, <br />water/wastewater treatment plants, booster pump stations, waif facilities, flow control facilities, <br />pressure reducing.stations and pipelines. Mr. Ramirez also has experience working with this City <br />and the City Building Department since lie worked on the John Gartho Reservoir improvements, <br />Well No, $2 Rehabilitation Study, and San Lorenzo Sewer Lift Station. <br />Mr. Mazen Kassar, PE, will be the Project Manager for Electrical and Controls, Mr. Kassar has <br />more than 24 years of experience in electrical onginsering design and construction <br />management. His background Includes designing medium and low voltage power distribution as <br />well as instrumentation and control systems for a wide variety of projects. He is also very <br />familiar with the City since he worked on the SA -3, SA -4 and SA -5 Flow Control Facilities, the <br />Crooke Reservoir Pump Station, and Well No, 24 Electrical Upgrades. <br />Subconsultants <br />In order to provide all the services we feel will be needed for this project, Tetra Tech has added <br />the following suboonsultents to our project team: <br />City of Santa Ane • 5 � TETRA TECH <br />25E-170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.