Laserfiche WebLink
I <br />ON-CALL ENGINEERING SERViCES <br />Walafibyarras-tlgia" A <br />distribution system may require piping modifications to allow for the Initial well discharge to <br />waste or to the reservoir and not to the distribution system. <br />Pipeffne.i0esfgn <br />Tetra Techs previous experience will help the City to suooessfuliy address the key pipekne <br />Issues including: agency requirements, utilities, traffic control, alignment selection, and <br />construction phasing. Early on In the project; it will be Important to meet with the City Public <br />Works to define the following: requirements: work hours, lane closures; storage of equipment; <br />open cut verses boring of intersections; trench backfill; and pavement restoration, <br />Tetra Toch will.perform our utility research immediately upon issuance of the Notice -.to -Proceed. <br />The USA moiddngslot the geotechnical Investigation will also be used to verify Vie location of <br />existing utilities. Any potholing services will be completed by use of the vacuum extraction <br />method thereby minimizing pavement damage and trafficdisruption. in addition, a field walk will <br />be completed to. took for evidence of Infrastructure (e.g, valve -carts, trench patch; vaults, etc,) as <br />sorrie utility owners do not belong to USA Dig Alert, and others respond with only partially <br />'complete Information. We have learned the importance of taking extra steps to verify potential <br />underground infrastructures. <br />The proposed pipelines in tha sample project are stated to be located within on arterial: street. <br />Therefore, traffic control will be.a major concern of the City. The traffic control requirements <br />shall be determined with the objeGtiva pt prtoviding the Contractor with adequate room for safety <br />as well as efficient operation while providing the least possible disruption to the traveling public. <br />We believe traffic control is a key design element and should be completed hand-in-hand with <br />the design of the pipeline. Similar to $A-15 Vault Relocation and San Lorenzo Lift Station <br />projects, both have pipaUnesbeing constructed within Bristol Street, Tetra Tech will prepare the <br />conceptual traffic control requirements, specifying the work area and proposed lane closures <br />that are acceptable to the City: The contractor will be responsible for the,actual preparation of <br />the traffic control plans based on these requirements. <br />If the proposed pipelines cross a signalized intersection, Tetra Tech will evaluate whether a <br />bore and jack operation or open -cut construction will be the most beneficial solution. Typically, <br />Tetra Tech has been able to show that openwcut construction during limited work hours top during <br />times of minimal traffic is the better solution verses bore and Jack operations due to the g.4 <br />hours.,'7 day lane closures required for the plts. <br />Proloot Management <br />Over the years, Tetra Tech has established well defined, rigorous procedures for project <br />management. These techniques have been developed and refined and have contributed to our <br />success and reputation. The keys to our project management system ore communications, <br />project planning, monitoring, and quality assurance. The Tetra Tech team's goal is to keep the <br />City staff "in the loop" from day one of the project. Communication tools Include formal progress <br />reports afforded through our project management system and an Informal give-and-take <br />approach starting with Tom Epperson, our Project Manager, and extending to every member of <br />the Tetra Tech team, At the project's outset, the chain of command and appropriate <br />communioation.methods will be agreed upon and can be as formal or as informal as the City <br />desires. We will use the entire communication spectrum, We will conduct formal meetings with <br />agenda and typewritten notes, and we will use informal meetings with notes to file, We also will <br />have documentation of telephone communications, with notes to file or letters of understanding <br />as appropriate follow-up. <br />@ttyat&anta Ana - 11 • TETRA TECH <br />25E-176 <br />