Laserfiche WebLink
Task 1: General Administration and Meetings - Tetra Tech and the City of Santa Ana will <br />cr" <br />meet six (6) times: kick-off meeting; preliminary well rehabilitation meeting; basis of design <br />(r: <br />ON-CALL ENGINEERINQ 6ERVIcrs <br />Watm eeunrcaa—OplbnR � <br />@b <br />meeting minutes, and distribute the minutes to all attending or as required, <br />:. t <br />Another important communication link will be our e-mail system. We are proposing to use a -mail <br />t <br />to keep the fifty aware of the status of the project. Every two weeks, Tetra "tech will prepare a <br />� <br />brief (ons or two paragraphs or bullet Items) e-mail summarizing the following; aetivitloa <br />'p <br />completed in the previous two weeks; the activities planned for the upcoming two weeks; any <br />;.,'s <br />critical decisions that need to be made; and schedule of upcoming evahtalmeetings. in Addition, <br />C <br />each month we will prepare a project status reportcontaining the follow l.ng: summary of <br />i <br />completion of tasks; description of key Isstlesleoncerns which have suriacod along with <br />proposed options and solutions; status.of action items; ands project status summary report <br />v,> <br />.showing current schedule And budget status, <br />rJ <br />Cofnmuniontivets, <br />�. <br />25E-177 <br />� <br />The key w any successful project is good communication, As our prdjedt.partner,.we propose to <br />Involve .city staff in open, honest communications from the very -start of the project, par <br />communications -will include; bl-woekly e-mail reports; monthly reports, Igvoloos and schedule <br />) <br />updates; regular meetings with City staff; and project documentation.avallable upon request, <br />All Information can be providod. electronically via e-mail or through a website portal; :At each <br />f <br />meeting our team will have our Project Manager and key design staff:present to facilitate the <br />discussion, We encourage .the City to hove at least ourrepresentative from Engineering and <br />one from Waiter Resources present at each meeting. However, we welcome as many City staff <br />Who have Ideas and Input.on the.projectto. attend our progress moetfngs. <br />Quality control <br />a i <br />Our team Clearly Understands the Importance of ensuring the City receives a qualityproduct. <br />I <br />We have asslgned a QA/00 Manager, Mr.. Mark Bush to ensure that all are the project goals <br />.t <br />are met. A detailed Quality Control/Quallty_Assurance Plan will be propared and submitted for <br />review, Thispian establishes lines of communications and procedures for ensuring quality. <br />during all phased of the project's design and construction: Inkeeping with our open <br />communications policy, all of our Quality Control documents will be made available to the City.- <br />I <br />Information Including design reviews, responses to comments and redilne pians can be <br />� p <br />provided in either hard Copy or electronically upon request from the city. <br />SCOPE OF WORK <br />Since the FIFA did not have a detailed.scope of work, Tetra Tech will use the recent Well No. 32 <br />and Well No. 29 Rehabilitation RFP's scope of work as the basis, Due to proposal page <br />; <br />limitation, we are only summarizing the scope of work included In those RFPs. <br />Task 1: General Administration and Meetings - Tetra Tech and the City of Santa Ana will <br />l' <br />meet six (6) times: kick-off meeting; preliminary well rehabilitation meeting; basis of design <br />I, <br />meeting; $0%, 60%, and final design submittal meetings, Tetra Tech will prepare the agendas, <br />meeting minutes, and distribute the minutes to all attending or as required, <br />:. t <br />Tetra Tech will prepare a detailed project management plan and project schedule. In addition, <br />j <br />Tetra Tech will prepare and Implement a QAIQC Plan. <br />For the sample project, Tetra Tech has also assumed that four (4) meetings will be required with <br />the City Public Works; Building, Electrical, Traffic Departments; City of Santa Ana Police <br />;.,'s <br />Department; Orange County Fire Authority; SCE; other utility companies; as necessary or <br />C <br />requested by the City. <br />v,> <br />rJ <br />- <br />•12• . 'TETRA TECH <br />�. <br />25E-177 <br />r <br />