My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-CALL ENGINEERING SERVICE$ <br />Wutst RBroWCds-O,Jbn A <br />Task 8: 100% Construction Document (PS&E) 3ubrnitial - Tetra Tech wfll prepare the 100% <br />PSAE's In accordance with the approved Basis of Design Report, compile in a matrix format all <br />60% commahts reoelved, and address and Incorporate comments per the matdx. Two (2) hard <br />copies,of full size plan sets: four (4) hard copies of half -91,"a plan sets and one electronic pdf <br />copy will be submitted to the City for.revlew, <br />Task 10: Final Construction Documertt (PS&E7 Submnitial -Tetra Tech will prepare the final <br />PS&E's ready for bidding, compile In a matrix format all 100% comments received, :and address <br />and incorporate comments per the matrix. Tyco (2) hard copies of full size pian sets,, four (4) <br />hard copies of half-size plan -sets and.ons.olectionie pdf copy will be submitted to the City for <br />reviaw. <br />Task. ft Didding and Construction Phase Services • Throughout the bidding and <br />construction process, Tetra Tech will assist the City in tate following items: <br />+ Attend the pre•oortgtruction meeting and construction kick-off meofing: <br />+ Assist in responding to questions raised durtng the bidding process; <br />• Prepare at maximum two (2) addentfums. <br />Respond In' Writing to controator's questions (NFIs) during construction, We have assumed a <br />total of fifteen (15), of which fiva (5) will require .design sketches or exhibits. <br />Attend alta visits to clarify design.. issues. Assumed eight (8) hours far site visits and <br />Whistruction meetings. <br />Assist the City with start-up of the well. We have assumed eight (8) hours. <br />• Revlow shop deaWings. We have assumed twenty (20) shop drawings. <br />Evaluate and respond to contractors requests for change orders. Assumed three (3). <br />Task 12: Record Drawings Preparation -Tatra Tech will prepare record drawings based on <br />the final as -built drawings provided by the contractor and/or City.We will submit one (1) full size <br />hard copy of the Record Drawings along with one (1) electronic copy in MicroStation fort -hat, <br />Additional Work (0PTIDNAL): <br />1. Modifications to Well Flushing Piping <br />2, Adding Sodium Hypochlorlte Facilities <br />3. Well operation Modifications (directly into distribution system) <br />4. Site Specific Traffic Control Plans <br />5, PLC Panel Design and Strategies <br />6. Field Monitoring of the Well Rehabilitation Construction <br />City of 5anrn Ana -16 • TETRA. TECH <br />25E=181 <br />�er <br />Vr <br />P <br />G <br />0 <br />I <br />CP <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />01 <br />t <br />3 i <br />`t <br />f, <br />'n <br />..i <br />...E <br />0 <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.