Laserfiche WebLink
ON-CALL ENGINEERING SERVICES <br />Wali newms-4plpn A <br />copy Will be submitted to the City for review. We envision the construction drawings will include <br />the following: <br />* General Sheets (Title Sheet and General Notes Sheet) <br />* Horizontal Control Plan <br />* Existing Well Site Pian and Existing Well Mechanical Plan and Section (2 sheets] <br />* Existing Well Detail end Well Rehabilitation Plan <br />* Well bard Piping Plan and Profiles (2 sheets) <br />* Well Discharge Pipeline Pian and Prollie (2 sheets 0 40 scale) <br />Well Sewer Pipeline Plan and Proflle (1 sheet 0 40 scale) <br />Trench and Paving Details, Piping and Miscellaneous Detalls (2 shoats) <br />* Connection Details (discharge piping and sever) <br />* Weil Elacirt el Site Plan and Well Eteotrlcal Modifications (2 sheets) <br />The following are additional construction drawings for Optional Work: <br />t <br />Modification Ig Wel_ I Flus i tiro Piping (OPTIONAL TASK) <br />* WeIfFlushing Piping Modif cations Plan and Sections <br />On-site Piping Modifications and Connections <br />Adding Sodium Hypochlorite Faclillies fOPT1ONAL TASKV <br />* Sodium Hypochlorite Generation Sohematic and Details <br />Sodium Hypoohlorite Mechanical Piping Plan and Sections <br />* Sodium Hypoehiodis Building Structural Piens (2 sheets) <br />* Structural Details <br />* Existing Well Site Electrical Pian and Single Line Diagram <br />* Sodium Hypoohlorite Building Power and Ligh#lhg. Plan <br />* Sodium Hypochlorite PWD <br />* Well loop Diagram Upgrade <br />* Well PLC Modifications <br />* Well P&tD'Upgrade <br />Traftl r t Plans alt - (OPTIONAL TA81<1 <br />* Traffic Control Plans for Potholing (3 sheets) <br />* Traffic Control Plans for Geotechnioai Investigation (2 sheets) <br />* Traffic Control Plans for Pipeline Construction (3 sheets) <br />Task 8s PLC Panel Design and Control Strategles . This task is an Optional Task it the City <br />decides to revise, upgrade, or modify the PLC panel design and the well control strategies. The <br />following is a brief summary of the Optional scope of work <br />* Review and update/revise the Functional Specification provided by the City, <br />* Modify control panel per City's now standard control panel drawings and specifications. <br />* Prepare wiring diagrams, loop diagrams and control panel drawings. <br />CHy or Santa Ana .15. TETRA TECH <br />25E-180 <br />