Laserfiche WebLink
t t TETRATECH <br />Thomas L. Epperson, PE <br />Project Manager <br />Mr. Epperson has over`36 years of professional experience:in <br />water, wastewater, and reptaimed water engineering. Mr. <br />Epperson has been responsible for the Preparation of water, <br />wastewater, and reclaimed water master plans; Project design <br />repp118 for various water, wastewater, and reclaimed water <br />factliflos; -and the planning and design of water,, wastewater, and <br />reclaimed water pipelines, along with pump stations and <br />reservoirs, He has been "responsible for completing the design, <br />bidding, and constmotjon management of over 260 miles of <br />water/reciairried wraterls wor mains, 36 watar/reclatmed water <br />pump.stations, l8 well -head facilities, 12 sewer lift sistions and <br />4 water/recialmod water storage reservoirs throughout Southern <br />Callf6fhis. <br />EXPERIENCE <br />Mld-Sdslm Injection: Centennial Park Design Services, <br />Orange County Water District, Oanta,Ana; CA — Project. <br />Manager responsible for the design of four injection wells to be <br />located within Centennial Park in the City of $ants Ana for <br />brange County Water District. In addition to the engineering <br />services for the four Injection wens, the project includes the <br />design of the supply, pipeline, backflush pipeline, bridge crossing, <br />two shared facility sites, a monitoring. well site, site Improvements, <br />and paving of park access roads and parking lots. <br />Well No. 27, City of Orange, CA — Project Manager for the <br />drilling and equipping of Well 27, a new potable water well (930 <br />foot deep). The project involved the partial demolition of an <br />existing warehouse to accommodate the footprint of the new well, <br />Installation of a CMU block control building and sodium <br />hypochlorite building, 12.5% sodium hypoohlorlte disinfection <br />facility, sound enclosure around the well head, as well as, site <br />and landscaping improvements. <br />Education; <br />8.5„ Environmental <br />Enginsering, <br />'Unlvarslty of California, Irvine, <br />1978 <br />RegistrationarCartifications: <br />Professional Engineer, <br />CialEfomta,1983, No. 36399 <br />Profasslonai. Afflilations: <br />American Waterworks <br />Assocfatiori <br />farangarcounty Water <br />Association <br />WateReose Association <br />Amerlgen Eocioly of Civil, <br />Engineers <br />Water. Environment <br />Fadeiation <br />Office: <br />Irvine, California <br />Years of E*rienoe: <br />36 <br />Years with Tetra Tach: <br />26 <br />Well No. 29 and Elizabeth Reservoir and Booster Pump Station, City of South Gate — <br />Project Manager for the design and construction support for the drilling and equipping of a new <br />2,500 gpm well, .sodium hypochlorite facilities, and generator at the well site and a 1.8 steel <br />reservoir, booster pump station consisting of three 125 hp pumps/motors at the reservoir site, <br />and abotlt.6,000 feet of water main replacements within the City of South Gate. The project <br />combined the well drilling and well equipping phases of the work together. <br />Equipping Well No, 16 and Treatment Plant, City of Paramount, .CA — Project Manager for <br />the design and construction support for a new bulk sodium hypochlorlte and ammonia chemical <br />delivery system at the City's new Well 15. Design included the equipment for the well including <br />the pump and motor, the discharge piping, and a manganese and future arsenic treatment <br />system. Included within the facility were an arsenic manganese filtration system, backwash <br />tank, backwash recirculation pumps, sludge mixer pumps, sodium hypochlorite and ammonia <br />Paye 1 <br />25E-193 <br />