|
t t TETRATECH
<br />Thomas L. Epperson, PE
<br />Project Manager
<br />Mr. Epperson has over`36 years of professional experience:in
<br />water, wastewater, and reptaimed water engineering. Mr.
<br />Epperson has been responsible for the Preparation of water,
<br />wastewater, and reclaimed water master plans; Project design
<br />repp118 for various water, wastewater, and reclaimed water
<br />factliflos; -and the planning and design of water,, wastewater, and
<br />reclaimed water pipelines, along with pump stations and
<br />reservoirs, He has been "responsible for completing the design,
<br />bidding, and constmotjon management of over 260 miles of
<br />water/reciairried wraterls wor mains, 36 watar/reclatmed water
<br />pump.stations, l8 well -head facilities, 12 sewer lift sistions and
<br />4 water/recialmod water storage reservoirs throughout Southern
<br />Callf6fhis.
<br />EXPERIENCE
<br />Mld-Sdslm Injection: Centennial Park Design Services,
<br />Orange County Water District, Oanta,Ana; CA — Project.
<br />Manager responsible for the design of four injection wells to be
<br />located within Centennial Park in the City of $ants Ana for
<br />brange County Water District. In addition to the engineering
<br />services for the four Injection wens, the project includes the
<br />design of the supply, pipeline, backflush pipeline, bridge crossing,
<br />two shared facility sites, a monitoring. well site, site Improvements,
<br />and paving of park access roads and parking lots.
<br />Well No. 27, City of Orange, CA — Project Manager for the
<br />drilling and equipping of Well 27, a new potable water well (930
<br />foot deep). The project involved the partial demolition of an
<br />existing warehouse to accommodate the footprint of the new well,
<br />Installation of a CMU block control building and sodium
<br />hypochlorite building, 12.5% sodium hypoohlorlte disinfection
<br />facility, sound enclosure around the well head, as well as, site
<br />and landscaping improvements.
<br />Education;
<br />8.5„ Environmental
<br />Enginsering,
<br />'Unlvarslty of California, Irvine,
<br />1978
<br />RegistrationarCartifications:
<br />Professional Engineer,
<br />CialEfomta,1983, No. 36399
<br />Profasslonai. Afflilations:
<br />American Waterworks
<br />Assocfatiori
<br />farangarcounty Water
<br />Association
<br />WateReose Association
<br />Amerlgen Eocioly of Civil,
<br />Engineers
<br />Water. Environment
<br />Fadeiation
<br />Office:
<br />Irvine, California
<br />Years of E*rienoe:
<br />36
<br />Years with Tetra Tach:
<br />26
<br />Well No. 29 and Elizabeth Reservoir and Booster Pump Station, City of South Gate —
<br />Project Manager for the design and construction support for the drilling and equipping of a new
<br />2,500 gpm well, .sodium hypochlorite facilities, and generator at the well site and a 1.8 steel
<br />reservoir, booster pump station consisting of three 125 hp pumps/motors at the reservoir site,
<br />and abotlt.6,000 feet of water main replacements within the City of South Gate. The project
<br />combined the well drilling and well equipping phases of the work together.
<br />Equipping Well No, 16 and Treatment Plant, City of Paramount, .CA — Project Manager for
<br />the design and construction support for a new bulk sodium hypochlorlte and ammonia chemical
<br />delivery system at the City's new Well 15. Design included the equipment for the well including
<br />the pump and motor, the discharge piping, and a manganese and future arsenic treatment
<br />system. Included within the facility were an arsenic manganese filtration system, backwash
<br />tank, backwash recirculation pumps, sludge mixer pumps, sodium hypochlorite and ammonia
<br />Paye 1
<br />25E-193
<br />
|