Laserfiche WebLink
NTIETRATECM Thomas L. Epperson, PE <br />Project Manager <br />treatment systems, and an emergency generator. The facility included the following <br />building/enclosures: well building removable sound enclosure; pre-engineered,, prefabricated <br />precast concrete electrical building; and prefabricated fiberglass insulated building for the <br />backwash pump enclosure. <br />Plant 13 Booster Statlen Rehabllitetloo and Well 22 Improvements, City of Lakewood, <br />Lakewood, CA — Project Manager for plans, specifications and cost estimate for the <br />replacement of a 4,800 gpm baostor pump station and replacement of a 1,200 gpm well pump. <br />In addition to the booster piarbp station replacement, the construction was phased so the <br />boaster station was operational during construction. <br />Well 107 Replacement, Irvine Ranch Water District, Irvine, CA— Project Manager for the <br />preparation of I6ae plans, speoi#icatens, cost estimate and'construction services for the drilling <br />and equipping of a potable water well in the City of Irvine. This project combined the well drilling <br />and well equipping phases of the projeot together. <br />Equipping of Well No, 39, City of manta Ane, Santa Ana, CA — Project Manager for the <br />design of the equipping of Well No. $9 and corresponding piping and..site improvements, <br />Well 70 Reptamment;irvlhe Ranch Water Dlstrict,Irvine, CA—Project Manager for tho <br />drilling and equipping of a recycled water well in the City of Irvine. <br />Irvine Des'aiter Project— Potable Wells 7.6,177, 107, and 110,. Irvine Ranch Water Diatrtet, <br />Irvine, CA — Project Manager for the design and construction services of four potable wells <br />Including drilling and equipping of each wail. <br />Burris Pump Station,;Arange County Water District, Anaheim, CA — Project Manager for <br />the design of the new Burris Pump Station which consists of four 1,730 horsepower vertical <br />turbine pumps delivering a maximum flow rate of 200 ofs to the Santiago Basins from Burris <br />Basin. Work consists of reviewing the existing Burris Pump Station Evaluation Report, assisting <br />QCWDwith selecting a replacement option, performing final design of the selected option and <br />providing did and construction -phase servic®s= The project also included unique -designs: - -- <br />190,000 cubio yards of earthwork to be completed prior to pump station construction, the <br />construction of a 55 foot diameter by 63 foot high circular Wet well which was computer and <br />physically modeled during design for flow characteristics, and the construction of a 180,000 <br />gallon surge suppression system: <br />Centennial Park Neighborhood Water Main improvements, City of Santa Ana, CA — Project <br />Director for approximately 20,000 linear feet of 8 -inch PVC water main to replace existing water <br />mains. <br />Central City Water Main Improvements, City of Santa Ana, CA - Project Director for <br />approximately e,600 linear feet of 8 -Inch PVC water main to replace existing water mains. <br />Pico -Lowell Neighborhood Water Main Improvements, City of Santa Ana, CA —Project <br />Director -for approximately 8,200 linear feet of 8- and 12 -inch PVC water main to replace existing <br />water mains. <br />Doge 2 <br />25E-194 <br />