NTIETRATECM Thomas L. Epperson, PE
<br />Project Manager
<br />treatment systems, and an emergency generator. The facility included the following
<br />building/enclosures: well building removable sound enclosure; pre-engineered,, prefabricated
<br />precast concrete electrical building; and prefabricated fiberglass insulated building for the
<br />backwash pump enclosure.
<br />Plant 13 Booster Statlen Rehabllitetloo and Well 22 Improvements, City of Lakewood,
<br />Lakewood, CA — Project Manager for plans, specifications and cost estimate for the
<br />replacement of a 4,800 gpm baostor pump station and replacement of a 1,200 gpm well pump.
<br />In addition to the booster piarbp station replacement, the construction was phased so the
<br />boaster station was operational during construction.
<br />Well 107 Replacement, Irvine Ranch Water District, Irvine, CA— Project Manager for the
<br />preparation of I6ae plans, speoi#icatens, cost estimate and'construction services for the drilling
<br />and equipping of a potable water well in the City of Irvine. This project combined the well drilling
<br />and well equipping phases of the projeot together.
<br />Equipping of Well No, 39, City of manta Ane, Santa Ana, CA — Project Manager for the
<br />design of the equipping of Well No. $9 and corresponding piping and..site improvements,
<br />Well 70 Reptamment;irvlhe Ranch Water Dlstrict,Irvine, CA—Project Manager for tho
<br />drilling and equipping of a recycled water well in the City of Irvine.
<br />Irvine Des'aiter Project— Potable Wells 7.6,177, 107, and 110,. Irvine Ranch Water Diatrtet,
<br />Irvine, CA — Project Manager for the design and construction services of four potable wells
<br />Including drilling and equipping of each wail.
<br />Burris Pump Station,;Arange County Water District, Anaheim, CA — Project Manager for
<br />the design of the new Burris Pump Station which consists of four 1,730 horsepower vertical
<br />turbine pumps delivering a maximum flow rate of 200 ofs to the Santiago Basins from Burris
<br />Basin. Work consists of reviewing the existing Burris Pump Station Evaluation Report, assisting
<br />QCWDwith selecting a replacement option, performing final design of the selected option and
<br />providing did and construction -phase servic®s= The project also included unique -designs: - --
<br />190,000 cubio yards of earthwork to be completed prior to pump station construction, the
<br />construction of a 55 foot diameter by 63 foot high circular Wet well which was computer and
<br />physically modeled during design for flow characteristics, and the construction of a 180,000
<br />gallon surge suppression system:
<br />Centennial Park Neighborhood Water Main improvements, City of Santa Ana, CA — Project
<br />Director for approximately 20,000 linear feet of 8 -inch PVC water main to replace existing water
<br />mains.
<br />Central City Water Main Improvements, City of Santa Ana, CA - Project Director for
<br />approximately e,600 linear feet of 8 -Inch PVC water main to replace existing water mains.
<br />Pico -Lowell Neighborhood Water Main Improvements, City of Santa Ana, CA —Project
<br />Director -for approximately 8,200 linear feet of 8- and 12 -inch PVC water main to replace existing
<br />water mains.
<br />Doge 2
<br />25E-194
<br />
|