|
TETRATECH
<br />Mr. gush hes over 22 years of professional experience 'in water,
<br />wastewater and recycled water engineering. He has been
<br />responsible for the completion Of over 1.00 miles of potable
<br />water, recycled water :and sewer mains, 20 potable water and
<br />baoyclbd'Water pultfp station and Well projects and 144 potable
<br />and recycled water reservoirs.
<br />Mr, Bush is an Integral part of the WaterlWastewater Department
<br />and brings leadership, strong work ethic, technical knowledge
<br />and dedication to Overall client satisfaction on each and every
<br />project.
<br />EXPERIENCE
<br />Mid•Basin Injection: Centennial Park Design Services,
<br />Orange County Water District; Santa Ana, CA — Responsible
<br />for the 0A1QC cif the design of four injection wells to be located
<br />within Centennial Park in the city of Santa Ana for Orange
<br />County Water: District, in addition to the engineering services for
<br />the four injection wells, the project includes the .design of the
<br />supply pipeline, backil6s.h pipeline, bridge crossing, two shared
<br />facility sites, a monitoring well site, site improvements, and
<br />paving of park access roads end parking lots,
<br />Well No. 27, City of Orange, Orange, CA —Project Engineer for
<br />the drilling and equipping of Well 27, a new. potat?I.e water well
<br />(630 feet deep). The project involved the partial demolition of an
<br />existing warehouse to accommodate the footprint of the new
<br />well, Installation of a CMU block control building and sodium
<br />hypochlorite building, 12,5% sodium hypochlorite disinfection
<br />facility, sound enclosure around the well head, as well as, site
<br />and landscaping improvements.
<br />Equipping of Well No. 39, City of Santa Ana, .Santa Ana, CA —
<br />Project Engineer for the drilling slid equipping of Well No, 38, a
<br />new potable well (1,350 feet deep), installation of three sodium
<br />hypochlorite disinfection facilities, and site landscaping
<br />Improvements.
<br />Mark W. Bush, PE
<br />QA/QC
<br />Education:
<br />University of California, Irvine
<br />8.9, Civil Ehg1nosri% 1997,
<br />8.8. Envirpnmental
<br />Enginearing, 7997
<br />ReglstrationelCertifloations:
<br />R01slered'Civil Engineer
<br />California No. 80477
<br />tmteile fterifow, Design and
<br />)Engineering certification
<br />Project Management:
<br />V8MJ — PM Werkshop
<br />Tatra Tech PM Series
<br />Professional Affiliations:
<br />American 0001Y of Civil
<br />Engineers
<br />American Water Works'
<br />Association
<br />Orange County Water
<br />Association
<br />Office:
<br />Irvine; California
<br />"Years of Experience:
<br />22
<br />Years with Tetra Tech:
<br />22
<br />Replacement of Chlorine Treatment at Well Nos. 13 and 14, City of Paramount,
<br />Paramount, CA — Provided design and construction support to replace the existing chlorine gas
<br />disinfection systems with bulk sodium hypochlorite and ammonla chemical delivery systems at
<br />the City's Wells 13 and 14, At both well sites, the disinfection systems were located outside
<br />within a concrete containment area with a shaded canopy.
<br />Equipping Wail No. 16 and Treatment Plant, City of Paramount, CA — Project Engineer for
<br />design and construction support for a new bulk sodium hypochlorite and ammonia chemical
<br />delivery system at the City's new Well 15. Design included the equipment for the well including
<br />the pump and motor, the discharge piping, and a manganese and future arsenic treatment
<br />system, Included within the facility are an arsenic manganese filtration system, backwash tank,
<br />Page t
<br />25E-195
<br />
|