Laserfiche WebLink
TETRATECH <br />Mr. gush hes over 22 years of professional experience 'in water, <br />wastewater and recycled water engineering. He has been <br />responsible for the completion Of over 1.00 miles of potable <br />water, recycled water :and sewer mains, 20 potable water and <br />baoyclbd'Water pultfp station and Well projects and 144 potable <br />and recycled water reservoirs. <br />Mr, Bush is an Integral part of the WaterlWastewater Department <br />and brings leadership, strong work ethic, technical knowledge <br />and dedication to Overall client satisfaction on each and every <br />project. <br />EXPERIENCE <br />Mid•Basin Injection: Centennial Park Design Services, <br />Orange County Water District; Santa Ana, CA — Responsible <br />for the 0A1QC cif the design of four injection wells to be located <br />within Centennial Park in the city of Santa Ana for Orange <br />County Water: District, in addition to the engineering services for <br />the four injection wells, the project includes the .design of the <br />supply pipeline, backil6s.h pipeline, bridge crossing, two shared <br />facility sites, a monitoring well site, site improvements, and <br />paving of park access roads end parking lots, <br />Well No. 27, City of Orange, Orange, CA —Project Engineer for <br />the drilling and equipping of Well 27, a new. potat?I.e water well <br />(630 feet deep). The project involved the partial demolition of an <br />existing warehouse to accommodate the footprint of the new <br />well, Installation of a CMU block control building and sodium <br />hypochlorite building, 12,5% sodium hypochlorite disinfection <br />facility, sound enclosure around the well head, as well as, site <br />and landscaping improvements. <br />Equipping of Well No. 39, City of Santa Ana, .Santa Ana, CA — <br />Project Engineer for the drilling slid equipping of Well No, 38, a <br />new potable well (1,350 feet deep), installation of three sodium <br />hypochlorite disinfection facilities, and site landscaping <br />Improvements. <br />Mark W. Bush, PE <br />QA/QC <br />Education: <br />University of California, Irvine <br />8.9, Civil Ehg1nosri% 1997, <br />8.8. Envirpnmental <br />Enginearing, 7997 <br />ReglstrationelCertifloations: <br />R01slered'Civil Engineer <br />California No. 80477 <br />tmteile fterifow, Design and <br />)Engineering certification <br />Project Management: <br />V8MJ — PM Werkshop <br />Tatra Tech PM Series <br />Professional Affiliations: <br />American 0001Y of Civil <br />Engineers <br />American Water Works' <br />Association <br />Orange County Water <br />Association <br />Office: <br />Irvine; California <br />"Years of Experience: <br />22 <br />Years with Tetra Tech: <br />22 <br />Replacement of Chlorine Treatment at Well Nos. 13 and 14, City of Paramount, <br />Paramount, CA — Provided design and construction support to replace the existing chlorine gas <br />disinfection systems with bulk sodium hypochlorite and ammonla chemical delivery systems at <br />the City's Wells 13 and 14, At both well sites, the disinfection systems were located outside <br />within a concrete containment area with a shaded canopy. <br />Equipping Wail No. 16 and Treatment Plant, City of Paramount, CA — Project Engineer for <br />design and construction support for a new bulk sodium hypochlorite and ammonia chemical <br />delivery system at the City's new Well 15. Design included the equipment for the well including <br />the pump and motor, the discharge piping, and a manganese and future arsenic treatment <br />system, Included within the facility are an arsenic manganese filtration system, backwash tank, <br />Page t <br />25E-195 <br />