|
TETRATECH Michael Taos, PE
<br />Well Equipping Lead
<br />Mr: Tsoi has over 24 years of professional operience. in water,
<br />Ed4catlon:
<br />wastewater, and recycled water englneering, Mr, Toot has .geen
<br />University of California, Irvine
<br />responsible for tne.planning and design of water, wastewater, and
<br />B.S. civil Engineering, 1991
<br />recycled water plpellnes along with pump stations, flow control
<br />Registratione/C.ertifleatlohs:
<br />facilities, reservoirs and sits Improvements. He is knowledgeable
<br />Registered:ProfessloW
<br />in the use of the latest computer software. including CARO,
<br />Engineer
<br />horl2ontol control, hydrology, hydraulics and various spreadsheet
<br />California No. 53716
<br />programs.
<br />Professional Affiliations:
<br />EXPERIENCE
<br />American Society of Civil
<br />Engineers
<br />Mid-Sasindnjection::CentennialPnrkllestgnServicas,
<br />Orange County Water District, Saftto Ana, , A. — Design :of four
<br />E��:
<br />injection wells to be Iodated within Centennial Park.ln the City of
<br />Irvine, Caftnito
<br />Santa Ana for Orange County Water District. In addition to the
<br />YBare. of H..zparlenco;
<br />engineering services for the four injection walls, the project
<br />34
<br />Includes the design of the supply pipeline, backftush pipeline,
<br />bridge crossing, two shared facility sites, a monitoring well site,
<br />Years with Tetra Tech:
<br />site Improvethents, and paving of park access roads and parking
<br />24
<br />to#s:
<br />Well 27 Equipping Plan, city of Orange, Orange, CA — Project
<br />Engineer for the preparation of the plans, specifications and cost
<br />estimate for the equipping of a potable water well, As part of the
<br />well equipping a generator room was Installed for backup power.
<br />Plant 13 Booster Station Rehabilitation and Well 22 improvements; City of Lakewood,
<br />Lakewood, CA — Project Engineer for pians, specifications and cost estimate for the
<br />replacement of a 4,800 gpm booster pump station and replacement of a 1,200 gpm well pump.
<br />In addition to the booster pump station replacement, the construction was phased so the
<br />booster station was operational during Construction.
<br />Well 906 Well Siting Study, Irvine Ranch Water District, Irvine, CA — Project Engineer for a
<br />study to determine the location of replacement. Well 106. Several locations were evaluated to
<br />determine If drilling was feasible along with connection to the rest of the raw water system.
<br />Well 107 Replacement, Irvine Ranch Water District, Irvine, CA — Project Engineer for the
<br />preparation of the plans, specifications, cost estimate and construction services for the drilling
<br />and equipping of a potable water well in the City of Irvine. This project combined the well drilling
<br />and well equipping phases of the project together,
<br />Well fib Replacement, Irvine Ranch Water District, Irvine, CA -- Project Engineer for the
<br />drilling and equipping of a recycled water well In the City of Irvine. This project included
<br />construction of the well within a highly visible area with limited work space,
<br />Irvine Desalter Project Potable and Non -Potable Well drilling and Equipping, Irvine Ranch
<br />Water District, Irvine, CA -A Project Engineer for the preparation of plans and specifications for
<br />the drilling and equipping for design of well drilling for five potable water wells and one non -
<br />Page 1
<br />25E-197
<br />
|