Laserfiche WebLink
TETRATECH Michael Taos, PE <br />Well Equipping Lead <br />Mr: Tsoi has over 24 years of professional operience. in water, <br />Ed4catlon: <br />wastewater, and recycled water englneering, Mr, Toot has .geen <br />University of California, Irvine <br />responsible for tne.planning and design of water, wastewater, and <br />B.S. civil Engineering, 1991 <br />recycled water plpellnes along with pump stations, flow control <br />Registratione/C.ertifleatlohs: <br />facilities, reservoirs and sits Improvements. He is knowledgeable <br />Registered:ProfessloW <br />in the use of the latest computer software. including CARO, <br />Engineer <br />horl2ontol control, hydrology, hydraulics and various spreadsheet <br />California No. 53716 <br />programs. <br />Professional Affiliations: <br />EXPERIENCE <br />American Society of Civil <br />Engineers <br />Mid-Sasindnjection::CentennialPnrkllestgnServicas, <br />Orange County Water District, Saftto Ana, , A. — Design :of four <br />E��: <br />injection wells to be Iodated within Centennial Park.ln the City of <br />Irvine, Caftnito <br />Santa Ana for Orange County Water District. In addition to the <br />YBare. of H..zparlenco; <br />engineering services for the four injection walls, the project <br />34 <br />Includes the design of the supply pipeline, backftush pipeline, <br />bridge crossing, two shared facility sites, a monitoring well site, <br />Years with Tetra Tech: <br />site Improvethents, and paving of park access roads and parking <br />24 <br />to#s: <br />Well 27 Equipping Plan, city of Orange, Orange, CA — Project <br />Engineer for the preparation of the plans, specifications and cost <br />estimate for the equipping of a potable water well, As part of the <br />well equipping a generator room was Installed for backup power. <br />Plant 13 Booster Station Rehabilitation and Well 22 improvements; City of Lakewood, <br />Lakewood, CA — Project Engineer for pians, specifications and cost estimate for the <br />replacement of a 4,800 gpm booster pump station and replacement of a 1,200 gpm well pump. <br />In addition to the booster pump station replacement, the construction was phased so the <br />booster station was operational during Construction. <br />Well 906 Well Siting Study, Irvine Ranch Water District, Irvine, CA — Project Engineer for a <br />study to determine the location of replacement. Well 106. Several locations were evaluated to <br />determine If drilling was feasible along with connection to the rest of the raw water system. <br />Well 107 Replacement, Irvine Ranch Water District, Irvine, CA — Project Engineer for the <br />preparation of the plans, specifications, cost estimate and construction services for the drilling <br />and equipping of a potable water well in the City of Irvine. This project combined the well drilling <br />and well equipping phases of the project together, <br />Well fib Replacement, Irvine Ranch Water District, Irvine, CA -- Project Engineer for the <br />drilling and equipping of a recycled water well In the City of Irvine. This project included <br />construction of the well within a highly visible area with limited work space, <br />Irvine Desalter Project Potable and Non -Potable Well drilling and Equipping, Irvine Ranch <br />Water District, Irvine, CA -A Project Engineer for the preparation of plans and specifications for <br />the drilling and equipping for design of well drilling for five potable water wells and one non - <br />Page 1 <br />25E-197 <br />