Laserfiche WebLink
NTETRATiCH <br />Michael Tsoi, Pr: <br />Well Equipping Lead <br />potable water wall. This includes wellhead equipping for each well for both aboveground and. <br />belowground facilities. Also Included in this project was the. modification to an existing non- <br />potobie water Weil. <br />Lakewood Wells 28 and 29,. City. of Lakewood,. Lakewood, CA — The City .of Lakewood is <br />constructing one new water well expected to produce about 2,000 gpm (We1128) and possualy a <br />second well (Well 20) to provide additional groundwater to supplement the. Ct#" water supply <br />source. The City would pump waterfrom the new well faculties t4 one of the existing reservoirs.. <br />MOW treatment be needed for Iran, manganeseor arsenic removal from the new water <br />source, the treatment facilities would likely be located at the reservoir site. The project consists <br />of preparing a wall siting study end providing recommendations for the new well sites. In <br />addition, a drinking Water source assessment was prepared and submitted to the Health <br />Department for the new well. A well design report was prepared that fnoarporated:the deslgn <br />pians and technfoal.;speciflcatfons. The project Is scheduled to bid .ln late201q with completion <br />of Well 28 oonstructton in 2016. Field observatlon elutingwell &f <br />Ill weling and construction is also <br />planned as pert of,the scope of work. <br />Well 115 Replacement, Irvine Ranch Water Distrlet, Irvine, CA- project Enoiheer for the <br />drilling end equipping of a potable water well in the'City of Irvine. This project aombined the well <br />drilling, and wel[ equipping phases of the project together. Coordination with. the City of Irvine <br />and The Irvine Company were required to procure the land for the well site. <br />Pap 2 <br />25E-198 <br />