Laserfiche WebLink
NTETRATECH Victor M. Ramirez, PE, SE <br />Structural Lead <br />Well 107 Replacement, Irvine Ranch Water District, Irvine, CA y- Structural Project Manager <br />for the Well 107 site, The structures Include concrete masonry retaining walls, concrete mat <br />foundations for electrical cabinets, concrete wellhead pedestals and pipe supports. <br />Weil 78 Replacement, Irvine Ranch Water District, Irvine, CA -. Structural °Project Manager <br />for a buried reinforced concrate Well vault. The vault is dssigned for the soil loading and H-,20. <br />truck loading with applicable Impact factors, The concrete wellhead pedestal is isolated from the <br />vault structure to allow for differenfial t ettlemer t of the vault relative to the wellhead, without <br />causing damage to the vault or wellhead. . <br />Equipping of Wells 1-10, 1-17, and 1-18, Chino Basin pesalter Authorlty, Chino, CA _ Tetra <br />Teeh:is providing design and construction engineering services for the equipping of three new <br />wells; at three separate sites. Tho spope of the structural design includes foundations for <br />prafabricated.elel trial enctosums, surge tank, well pedestals, pipe racks and supports. <br />Services include ponCeptuat design, permitting assistance, final design, W assistance, and <br />construction assistance. <br />Well C -B, City of Cerritos, CA — Mr, Ramirez servad as Structural Project Engineer for this <br />2,000 square foot well building on a mat'foundatipn, to mitigate the effect's of potential <br />liquefaction. The facility ties nine separate rooms for housing mechanical, electrical, disinfection <br />and water conditioning equipment, The building also contains rooms for an emergency <br />generator and MVAC equipment as well as office and restroom spaces. Portions of the walls <br />and roof at the well are removable. The structural design work scope also included arphiteotural <br />services for making the well building match the buildings in the adjacent housing development, <br />Weli_Mo. 27 Treatment Plant, Lakewood, CA.— Design and construction phase services for a <br />groundwater treatment facility which Includes foundations for filter vessel, storage tanks, and <br />pumping equipment, The design also Includes the structural and architectural design of a 10 <br />foot high masonry screen wail which mirrors several of the architectural features which occur in <br />the community that surrounds the plant. <br />Rancho Del Ray Wellhead Treatment Factlity, Otay Water bistrict Chula Vista, CA — <br />Project Structural Engineer for the design of a 5100 square foot masonry building, with a steel <br />truss framed roof, which houses a well head, RC1 treatment facility, disinfection equipment, <br />conventionally reinforced concrete clearwell pump station, control room, office and storage area, <br />The design of the building balances the functional water production requirements with the <br />aesthetic, architectural design of the exterior of the building, which was critical for compliance <br />with local planning agency requirements. <br />Irvine Desalter Project, Irvine Ranch Water District, Irvine, CA —Structural Project Engineer <br />for a project which includes a 6,000 square foot tilt -up concrete RC1 filtration building, several <br />partially buried Cast -in-place concrete clearwell pump stations, a buried cast -In-place concrete <br />well vault, 2701inear feet of 26 foot high tilt -up concrete free-standing fence wall and several <br />chemical containment areas with steel framed canopies, <br />Page 2 <br />25E-204 <br />