Laserfiche WebLink
NTETRA.TECH <br />Victor M. Ramirez, PE, SE <br />Structural Lead <br />Mr; Ramirez has over 30 years of structural engineering design Education: <br />experlenoe with special emphasis in the design of water B.S., civil Engineering, <br />storaga/water containment and water conveyance related 0611fornia State ttnivgrsity, <br />structures; This Includes reservoirs, watodwestewatar treatment Los Angeles,. 1906 <br />plants, booster pump stations, flow control facilities, pressure Registrations/cortiflcations: <br />reducing stations and pipelines. His experience also includes the Registered struclurar <br />design of a wide variety of other types of Structures, including Engineer <br />buildin s, bridges and storm .draihage related stntcturss. _He Is Callfornia, 20ia4,:Nm 4720 <br />thoroughly knowledgeable in all types of construction, 'Including <br />reintoreed concrete, masonry, structural steel,,.and timber. Regiatered Civil Engineer . <br />Ca lfarn(a,1997';.Ne, 66863 <br />EXPERIENCE Professional Affiliations: <br />Mid-Saairt Injection: Centennial Park. Design Services, Orange Structural Engineers <br />County Water District, Santa Arta, CA — Structural 9r4jett Association of Southern <br />Manager responsible for the. design of four Injection wells to be California <br />located within Centennial Park. In City of Santa Ana for Orange American institute of steel <br />County Water blatrict. in addition to the engineering services for Construction <br />the four INation wells; the project includes the design of the Field Safety Certifications <br />supply pipeline, backfiush pipeline, bridge crossing, two shared Confined space <br />facility sites; a mord ng well site, Site irriprovemants, and paving Tau Protection <br />Of park access roads and parking lots. <br />Design -Build of Wells 21 and 22 Desaiter, Irvine Water Office: <br />District, Irvine, CA — Structural Project Engineer for a.projeot that San Dimes, California <br />is the third. membrane watertrostment plant completed by the Years of Experience: <br />design/build team of Tetra Tech and Pascale Ludwig. The main 30 <br />treatment facility Is housed in a 10,000 square foot tilt -up concrete <br />building which also contains pump, control, HVAC and electrical Years with Tetra Tech: <br />rooms. A.comer of the building is constructed on a 12 foot deep, 36 <br />100,000 gallon, buried, cast -in-place concrete water storage <br />structure. ;Special consideration Was given in the analysis and <br />detailing of the tilt -up building and buried concrete structure so <br />that all design forces are properly resisted slid the potential <br />differential settlement between the shallow building foundations and the deep water storage <br />structure is mitigated. Various concrete and steel structures for pre- and past -treatment areas <br />are also located on the site. These areas are hidden from public view by 27 foot tall freestanding <br />tilt -up concrete screen walls and by the main treatment building itself, <br />Burris Pump Station, Orange County Water Dlstrict (OCWD), Anaheim, CA -- Structural <br />Engineer for the replacement of an existing pumping facility at the Burris Pump Station location. <br />Mr. Ramirez was involved in the comprehensive design of the 0,8 MO buried circular wet well, <br />The new facility will allow OCWD to transfer up to 200 cubic feet per second from the Santa Ana <br />River, which will be'and utilized for groundwater recharge to the Santiago Basins. <br />Wells No. 40 and 44, City of Ontario, CA — Project consisted of two new domestic water wells <br />approximately 1,200 feet deep. Well capacities aro 2,000 to 3,000 gpm. Included masonry block <br />enclosure with open roof courtyard. Also included disinfection and construction administration, <br />Pagel <br />25E-203 <br />