|
NTETRA.TECH
<br />Victor M. Ramirez, PE, SE
<br />Structural Lead
<br />Mr; Ramirez has over 30 years of structural engineering design Education:
<br />experlenoe with special emphasis in the design of water B.S., civil Engineering,
<br />storaga/water containment and water conveyance related 0611fornia State ttnivgrsity,
<br />structures; This Includes reservoirs, watodwestewatar treatment Los Angeles,. 1906
<br />plants, booster pump stations, flow control facilities, pressure Registrations/cortiflcations:
<br />reducing stations and pipelines. His experience also includes the Registered struclurar
<br />design of a wide variety of other types of Structures, including Engineer
<br />buildin s, bridges and storm .draihage related stntcturss. _He Is Callfornia, 20ia4,:Nm 4720
<br />thoroughly knowledgeable in all types of construction, 'Including
<br />reintoreed concrete, masonry, structural steel,,.and timber. Regiatered Civil Engineer .
<br />Ca lfarn(a,1997';.Ne, 66863
<br />EXPERIENCE Professional Affiliations:
<br />Mid-Saairt Injection: Centennial Park. Design Services, Orange Structural Engineers
<br />County Water District, Santa Arta, CA — Structural 9r4jett Association of Southern
<br />Manager responsible for the. design of four Injection wells to be California
<br />located within Centennial Park. In City of Santa Ana for Orange American institute of steel
<br />County Water blatrict. in addition to the engineering services for Construction
<br />the four INation wells; the project includes the design of the Field Safety Certifications
<br />supply pipeline, backfiush pipeline, bridge crossing, two shared Confined space
<br />facility sites; a mord ng well site, Site irriprovemants, and paving Tau Protection
<br />Of park access roads and parking lots.
<br />Design -Build of Wells 21 and 22 Desaiter, Irvine Water Office:
<br />District, Irvine, CA — Structural Project Engineer for a.projeot that San Dimes, California
<br />is the third. membrane watertrostment plant completed by the Years of Experience:
<br />design/build team of Tetra Tech and Pascale Ludwig. The main 30
<br />treatment facility Is housed in a 10,000 square foot tilt -up concrete
<br />building which also contains pump, control, HVAC and electrical Years with Tetra Tech:
<br />rooms. A.comer of the building is constructed on a 12 foot deep, 36
<br />100,000 gallon, buried, cast -in-place concrete water storage
<br />structure. ;Special consideration Was given in the analysis and
<br />detailing of the tilt -up building and buried concrete structure so
<br />that all design forces are properly resisted slid the potential
<br />differential settlement between the shallow building foundations and the deep water storage
<br />structure is mitigated. Various concrete and steel structures for pre- and past -treatment areas
<br />are also located on the site. These areas are hidden from public view by 27 foot tall freestanding
<br />tilt -up concrete screen walls and by the main treatment building itself,
<br />Burris Pump Station, Orange County Water Dlstrict (OCWD), Anaheim, CA -- Structural
<br />Engineer for the replacement of an existing pumping facility at the Burris Pump Station location.
<br />Mr. Ramirez was involved in the comprehensive design of the 0,8 MO buried circular wet well,
<br />The new facility will allow OCWD to transfer up to 200 cubic feet per second from the Santa Ana
<br />River, which will be'and utilized for groundwater recharge to the Santiago Basins.
<br />Wells No. 40 and 44, City of Ontario, CA — Project consisted of two new domestic water wells
<br />approximately 1,200 feet deep. Well capacities aro 2,000 to 3,000 gpm. Included masonry block
<br />enclosure with open roof courtyard. Also included disinfection and construction administration,
<br />Pagel
<br />25E-203
<br />
|