Laserfiche WebLink
TETRATECH <br />Nicole Han, PE <br />Electrical/Instrumentation Design <br />Mie, Hen Is experienced In the. electrical design of water and <br />Erlucagon: <br />wastewater plants, system studies, power distribution, emergency <br />M.S., Electrical Engineeft, <br />power supply, motor and instrumentation control. Her projects <br />Soulhem.Celitomia <br />include designing water ,and wastewater plants, .desalination <br />university <br />plsnts,. lift statfons, pump stetipns, drinking wetQr wells, pipelines <br />Los Angeles, 2012 <br />and order control systems. <br />Training and CerUficaflons: <br />EXPERIENCE <br />Professional Eledrisat <br />Engfornla, <br />Mid -Basin Centennial Park, City of'Santa Ana, Santa Ana,:,CA <br />2016, No. 21420 Gaii <br />Four injection wells are includad Ii4 Ehls project and will be <br />Professional Affiliations. <br />constructed below ground vaults. Wells art proposed to Inject 12 <br />Notate and <br />MOD of GWRS water into the principal: groundwater-agulfer <br />Elockorres Englaeers IEEE <br />approximately 1,200 feet below ground surface. Submersible <br />Office: <br />baokflush pumps will be.instellad within the injection wells. <br />Irvine, Cslifornls <br />Electrical Engineer responsible: for designing two shared kt ilities' <br />powar distribution, injection Wells Instrumentation and control, <br />Years of Experience: <br />communication with the other sites and teadquartom., <br />Four <br />Well No. 7, City of inglewood, Inglewood, CA — Electrical <br />Years with Tetra Tech: <br />Engineer for designing power distribution, t.nstrumentation control <br />TWO <br />plans and specs. The project is to develop a ground water source <br />of portable water. <br />Lome Linda University Anderson No. 4 Wetf, Loma Linda, CA <br />— Electrical Engineer responsible f0creating .ploctrical plans, <br />specifications, electrical load schedules, panel schedules, conduit <br />and wire sizing, electrical details, emergency standby generator <br />sizing, creation of pump control schematics; and drafting technical <br />specifications. The project design includes providing a new pump, <br />a new PLC system to control well pump and providing lighting <br />system. <br />Elizabeth Reservoir, Booster Pump Station and Well No, 29, <br />City of South Gate, South G3ato, Cpl — Engineering design <br />services for a water storage tank and booster.pump station and a <br />water wail with disinfection equipment. Electrical engineering <br />services included three new 125 horsepower booster pumps and <br />adding and Installing new conduits and wires to the new pumps. <br />Responsible for preparing plans, specifications, and load <br />calculation to modify the facility's extensive distribution system. <br />Site investigations were conducted to verify ratings, settings, and <br />locations of equipment. Working with utility company to'provide <br />new service to the project. <br />Crooke Reservoir Electrical Upgrade, City of Santa Ana, <br />Santa Ana, CA — Electrical Engineer for the design of the <br />replacement of the existing motor control panels and switchboards <br />for Crooke Reservoir pump station, Well 27 and Well 28, <br />Page 1 <br />25E-209 <br />