TETRATECH
<br />Nicole Han, PE
<br />Electrical/Instrumentation Design
<br />Mie, Hen Is experienced In the. electrical design of water and
<br />Erlucagon:
<br />wastewater plants, system studies, power distribution, emergency
<br />M.S., Electrical Engineeft,
<br />power supply, motor and instrumentation control. Her projects
<br />Soulhem.Celitomia
<br />include designing water ,and wastewater plants, .desalination
<br />university
<br />plsnts,. lift statfons, pump stetipns, drinking wetQr wells, pipelines
<br />Los Angeles, 2012
<br />and order control systems.
<br />Training and CerUficaflons:
<br />EXPERIENCE
<br />Professional Eledrisat
<br />Engfornla,
<br />Mid -Basin Centennial Park, City of'Santa Ana, Santa Ana,:,CA
<br />2016, No. 21420 Gaii
<br />Four injection wells are includad Ii4 Ehls project and will be
<br />Professional Affiliations.
<br />constructed below ground vaults. Wells art proposed to Inject 12
<br />Notate and
<br />MOD of GWRS water into the principal: groundwater-agulfer
<br />Elockorres Englaeers IEEE
<br />approximately 1,200 feet below ground surface. Submersible
<br />Office:
<br />baokflush pumps will be.instellad within the injection wells.
<br />Irvine, Cslifornls
<br />Electrical Engineer responsible: for designing two shared kt ilities'
<br />powar distribution, injection Wells Instrumentation and control,
<br />Years of Experience:
<br />communication with the other sites and teadquartom.,
<br />Four
<br />Well No. 7, City of inglewood, Inglewood, CA — Electrical
<br />Years with Tetra Tech:
<br />Engineer for designing power distribution, t.nstrumentation control
<br />TWO
<br />plans and specs. The project is to develop a ground water source
<br />of portable water.
<br />Lome Linda University Anderson No. 4 Wetf, Loma Linda, CA
<br />— Electrical Engineer responsible f0creating .ploctrical plans,
<br />specifications, electrical load schedules, panel schedules, conduit
<br />and wire sizing, electrical details, emergency standby generator
<br />sizing, creation of pump control schematics; and drafting technical
<br />specifications. The project design includes providing a new pump,
<br />a new PLC system to control well pump and providing lighting
<br />system.
<br />Elizabeth Reservoir, Booster Pump Station and Well No, 29,
<br />City of South Gate, South G3ato, Cpl — Engineering design
<br />services for a water storage tank and booster.pump station and a
<br />water wail with disinfection equipment. Electrical engineering
<br />services included three new 125 horsepower booster pumps and
<br />adding and Installing new conduits and wires to the new pumps.
<br />Responsible for preparing plans, specifications, and load
<br />calculation to modify the facility's extensive distribution system.
<br />Site investigations were conducted to verify ratings, settings, and
<br />locations of equipment. Working with utility company to'provide
<br />new service to the project.
<br />Crooke Reservoir Electrical Upgrade, City of Santa Ana,
<br />Santa Ana, CA — Electrical Engineer for the design of the
<br />replacement of the existing motor control panels and switchboards
<br />for Crooke Reservoir pump station, Well 27 and Well 28,
<br />Page 1
<br />25E-209