Laserfiche WebLink
�/V�Ln1 <br />NY <br />G <br />TETRATECH Mazen Kassab, PE <br />Elebtricaillnstrurnentation Lead <br />0 <br />City of Paramount, Well 13 & 14, Paramount, CA w Managed instrumentation and control <br />design for Well 13 and Well 14 chlorination system. The design Included providing new PLG <br />system to control chlorine and ammonia metering pumps. Provided P&ID, loop diagram, wiring@ <br />schematic and.instrumentation and :control plans, <br />Well 21922 Desalter Plant, Irvine Ranch Water District, €rvino, CA - Wells 21 and 22 <br />(Reverse Osmosis (RO) Treatrnept Plant is designed to remove ollds ifrom well water and <br />rovide potable water source. The design consisted of providing all design-build services to <br />01 <br />=101,3 <br />construct a f{alty operational reverse osmosis water treatment plant including, but not limited to. <br />Pretreatment chemical systems, high pressure feed pumps, reverse osmosis treatment trains, <br />( <br />membrane clean4ri-place system, decarbonatora, post treatment chemical systems supervisory <br />control and data acquisition, product water pump station, treatment plant building sntl electrical <br />and instrumentation system. The RO Plant was sized to produce 6.27 rngd of water, Water will <br />N treated to remove salts (TD$j and nitrates. Managed the_electdoaI design of the elee#ri.Cai <br />power rind control system, preparing technical specifications, preparing engineer's. cost <br />t(, <br />estimate, preforming electrical power system studies that includad Ioad flow, short circuit and <br />aro flash calculations, and integration with the city's SCADA system. <br />Loma Linda Un€verelty.At ilersdn No.4 Well, Loma Linda, GA— Electrical. Engineer <br />l <br />responsible. for creating electrical plans, specifications, electrical load schedules, panel <br />schedules, conduit.and wire sizing, electrical detsits, emergency standby generator sizing, <br />creation of pump control schematics, drafting technical specifications, and preforming electrical <br />g.., <br />4 <br />power system studies that included load flow, short circuit, and are flash calculations. The <br />project design Includes providing a new pump, a new PLC system to control watt pump and <br />s,l <br />providing lighting system. <br />ry. <br />Crooke Reservoir Electrical Upgrade, City of Santa Ana, Santa Ana, CA — Electrioal <br />4 t, <br />Engineer for the design of the replacement of the existing motor control panels and <br />;G <br />switchboards for Crooke Reservoir pump station, Well 27 and Well 26. <br />Surds Pump-Station, Orange County Water-Distr€ct,.Fountain Valley, CA « iectrical <br />i f <br />Engineer for the design of the new Burris Pump Station which consists of four 1,950 horsepower <br />vertical turbine pumps delivering a maximum flow rate of 200 ofs to the Santiago Basins from <br />E j` <br />Burris Basin, Work consists of reviewing the Burris Pump Station construction phase shop <br />drawings, performing design revision, and providing answers to RFis, <br />I'J <br />Elizabeth Reservoir, Booster Pump Station and Well No. 29, City of South Gate, South <br />Cate, CA — Engineering design services for a water storage tank and booster pump station and <br />a water well with disinfection equipment. Electrical engineering services Included three new 125 <br />i <br />horsepower booster pumps and adding and installing new conduits and wires to the new <br />pumps, Responsible for preparing pians, specifications, and load calculation to modify the <br />I <br />facility's extensive distribution system. Site investigations were conducted to verify ratings, <br />7 <br />settings, and locations of equipment. Working with utility Company to provide new service to the <br />project, <br />City of Loma Linda, San Bernardino, CA — Upgraded old drinking water wells with large <br />y <br />VFDs. installed six-pulse and eighteen- pulse VFDs that varied in size from 200 hp to 600 hp. <br />` <br />The design included upgrading electrical service, installing new switchboards and MCC% <br />installing harmonic filters, upgrading Instrumentation and control system and reconnecting to the <br />existing SCADA system, <br />Page 2 <br />25E-208 <br />