<br />TETRATECH Mazen Kassab, PE
<br />Elebtricaillnstrurnentation Lead
<br />0
<br />City of Paramount, Well 13 & 14, Paramount, CA w Managed instrumentation and control
<br />design for Well 13 and Well 14 chlorination system. The design Included providing new PLG
<br />system to control chlorine and ammonia metering pumps. Provided P&ID, loop diagram, wiring@
<br />schematic and.instrumentation and :control plans,
<br />Well 21922 Desalter Plant, Irvine Ranch Water District, €rvino, CA - Wells 21 and 22
<br />(Reverse Osmosis (RO) Treatrnept Plant is designed to remove ollds ifrom well water and
<br />rovide potable water source. The design consisted of providing all design-build services to
<br />01
<br />=101,3
<br />construct a f{alty operational reverse osmosis water treatment plant including, but not limited to.
<br />Pretreatment chemical systems, high pressure feed pumps, reverse osmosis treatment trains,
<br />(
<br />membrane clean4ri-place system, decarbonatora, post treatment chemical systems supervisory
<br />control and data acquisition, product water pump station, treatment plant building sntl electrical
<br />and instrumentation system. The RO Plant was sized to produce 6.27 rngd of water, Water will
<br />N treated to remove salts (TD$j and nitrates. Managed the_electdoaI design of the elee#ri.Cai
<br />power rind control system, preparing technical specifications, preparing engineer's. cost
<br />t(,
<br />estimate, preforming electrical power system studies that includad Ioad flow, short circuit and
<br />aro flash calculations, and integration with the city's SCADA system.
<br />Loma Linda Un€verelty.At ilersdn No.4 Well, Loma Linda, GA— Electrical. Engineer
<br />l
<br />responsible. for creating electrical plans, specifications, electrical load schedules, panel
<br />schedules, conduit.and wire sizing, electrical detsits, emergency standby generator sizing,
<br />creation of pump control schematics, drafting technical specifications, and preforming electrical
<br />g..,
<br />4
<br />power system studies that included load flow, short circuit, and are flash calculations. The
<br />project design Includes providing a new pump, a new PLC system to control watt pump and
<br />s,l
<br />providing lighting system.
<br />ry.
<br />Crooke Reservoir Electrical Upgrade, City of Santa Ana, Santa Ana, CA — Electrioal
<br />4 t,
<br />Engineer for the design of the replacement of the existing motor control panels and
<br />;G
<br />switchboards for Crooke Reservoir pump station, Well 27 and Well 26.
<br />Surds Pump-Station, Orange County Water-Distr€ct,.Fountain Valley, CA « iectrical
<br />i f
<br />Engineer for the design of the new Burris Pump Station which consists of four 1,950 horsepower
<br />vertical turbine pumps delivering a maximum flow rate of 200 ofs to the Santiago Basins from
<br />E j`
<br />Burris Basin, Work consists of reviewing the Burris Pump Station construction phase shop
<br />drawings, performing design revision, and providing answers to RFis,
<br />I'J
<br />Elizabeth Reservoir, Booster Pump Station and Well No. 29, City of South Gate, South
<br />Cate, CA — Engineering design services for a water storage tank and booster pump station and
<br />a water well with disinfection equipment. Electrical engineering services Included three new 125
<br />i
<br />horsepower booster pumps and adding and installing new conduits and wires to the new
<br />pumps, Responsible for preparing pians, specifications, and load calculation to modify the
<br />I
<br />facility's extensive distribution system. Site investigations were conducted to verify ratings,
<br />7
<br />settings, and locations of equipment. Working with utility Company to provide new service to the
<br />project,
<br />City of Loma Linda, San Bernardino, CA — Upgraded old drinking water wells with large
<br />y
<br />VFDs. installed six-pulse and eighteen- pulse VFDs that varied in size from 200 hp to 600 hp.
<br />`
<br />The design included upgrading electrical service, installing new switchboards and MCC%
<br />installing harmonic filters, upgrading Instrumentation and control system and reconnecting to the
<br />existing SCADA system,